This is Amendment 02 to Solicitation No. 1240LT26Q0103 for High Sierra Ranger Station Upgrades at Sierra National Forest, issued by USDA Forest Service on September 23, 2026, with an effective date of 09/23/2026. The period of performance is June 1, 2027 to November 30, 2027.
The amendment modifies the Schedule of Items by removing the requirement to tie in solar panels and eliminating additional solar installation for day-use power for water tank filling and radio usage. It updates Attachment 2 (Schedule of Items), revises Attachment 4 (Drawings Page C8 Site Plan 3) to clarify that a new 30'×40'×14' pole barn should be installed within the footprint of the existing horse corral with obstructions removed for site preparation, replaces the Prevailing Wage determination (Attachment 6 DBA WD CA2026018 dated 07/14/26 with version dated 09/03/26), and adds Attachment 7 (ASCE Design Criteria). The amendment includes 42 questions and answers addressing clarifications on electrical design, utility connections, structural criteria, prefabrication requirements, and equipment specifications. Key clarifications confirm that one prime contract will be awarded for Items 0001-0007; prefabricated or kit structures assembled on-site per manufacturer recommendations are required; utility connections are excluded from this contract; the three tiny houses must be 590 square feet each; barracks and kitchen facilities do not require ADA accessibility; automatic fire sprinkler systems are not required; and foundation design shall follow manufacturer recommendations with minimum soil bearing of 1500 psf and 24-inch frost depth.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT26Q0103
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
GAOA09/23/20260002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/24/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation No. 1240LT26Q0103 High Sierra Ranger Station Upgrades, Sierra National Forest is amended as follows:
See Attachment 2 - Schedule of Items, delete in its entirety and replace with the attached
Attachment 2 - Schedule of Items. Change removes the requirement to tie in Solar's panels and add additional solar to provide day use power for filling water tank, and radio usage.
See Attachment 4 - Drawings, Page C8, Site Plan 3, change Keynote to read "INSTALL NEW
30'X40'X14' POLE BARN WITHIN FOOTPRINT OF EXISTING HORSE CORRAL. REMOVE OBSTRUCTIONS AS
NECESSARY FOR SITE PREPARATION"
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JANET K. PAUL
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 15CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT26Q0103/0002
See Attachment 6 - DBA WD CA2026018 dated
07/14/26, delete in its entirety and replace with the attached DBA WD CA2026018 dated 9/03/26.
Attachment 7 - ASCE Design Criteria is hereby added to the solicitation documents.
See the attached for Site Visit Information and
Questions/Answers.
Period of Performance: 06/01/2027 to 11/30/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment 02 High Sierra Ranger Station Upgrades
1240LT26Q0103
September 23, 2026
Solicitation 1240LT26Q0103, High Sierra Ranger Station Upgrades, Sierra National Forest, is amended as follows:
A site visit was held at the High Sierra Ranger Station site on September 10, 2026. Below are attendees:
Name Company Leo Stewart USFS Taraneh Markal Atelier 21
The following questions and answers are provided for information/clarification purposes only.
Q1: Although Division 26 electrical specifications are included in the contract documents, no electrical drawings, one line diagrams, panel schedules, load calculations, service information, feeder sizing/routing, receptacle layouts, or connection details are provided because this contract does not include installation of electrical service to the prefabricated facilities. Please provide the electrical drawings/design criteria required to price the electrical work for:
1. New Barracks No. 1
2. New Barracks No. 2
3. New Kitchen/Laundry Building
4. Wishon Work Center Generator Shed, including new panel, solar connections/additional solar and remote generator shutdown
5. Auberry Work Center Pole Barn, including interior/exterior lighting
A1: Although Division 26 electrical specifications are included in the contract documents, no electrical drawings, one line diagrams, panel schedules, load calculations, service information, feeder sizing/routing, receptacle layouts, or connection details are provided because this contract does not include installation of electrical service to the prefabricated facilities.
The following facilities do not require electrical design or electrical drawings as part of this contract, as they will not be connected to power under the current scope:
o New Barracks No. 1 o New Barracks No. 2 o New Kitchen/Laundry Building
These prefabricated structures must include basic internal electrical outlets (suitable for low demand appliances such as a microwave or compact refrigerator) and a single exterior power connection point to allow electrical service to be connected under a future contract. No additional electrical design criteria are required at this time.
Wishon Work Center Generator Shed - The main panel is to be replaced with a 100-amp solar ready panel. Solar system and remote switch are to be installed on a separate contract.
1240LT26Q0103
September 23, 2026
Auberry Work Center Pole Barn - The Auberry Pole Barn is not an enclosed facility, other than the (10 by 30) for storage. As such, it does not require full interior or exterior lighting, wiring, or electrical distribution under this contract.
The only electrical work included is:
• Installation of two exterior lights located on the two front top corners of the barn.
Suggested: (Adjustable Beam Security Light: LED, 2 Light heads, 2,150 lm, 2,600 lm, 3000K/4000K/5000K, 26 W).
• Provide a single power connection point to allow these lights to be connected to electrical service in the future under a separate contract.
No other electrical work is required at this location.
Q2: The contract drawings identify proposed facilities and existing/proposed utilities; however, sufficient information does not appear to be provided to determine the underground utility quantities and connection requirements.
A2: Connections to the utilities are not a part of this contract. Supply lines will be determined on a separate contract. All plumbing, electrical, and plumbing installations in the pre-fabricated buildings are provided by the manufacturer. The buildings are to be constructed to be ready for hook-ups.
Q3: Is the contractor responsible for utility hook-ups (sewer, water, electrical). If so, can you identify location of intended connection points and distance from respective cabins?
A3: No. the structures will not be hooked up to existing utilities under this contract. That will be performed at a later date on a separate contract.
Q4: Is there any California specific contractor licensure required?
A4: A specific state license is not required to submit a quote.
Q5: Will building permits, tree removal permits, or utility connection permits be required?
A5: No; however, transportation permits will be required when transporting wide loads on California roads.
Q6: Are public utilities available for connections or will a septic system and or well be required/installed by others?
A6: There are no public utilities. Septic system and other utility connections will be performed on a separate contract.
Q7: Is contractor camping on site authorized?
1240LT26Q0103
September 23, 2026
A7: Yes. There are camp sites available. No water, sewer or power is available at the sites.
Q8: The Schedule of Items indicates that one award will be made for Items 0001–0007; however, Specification Section 011000 describes the project as consisting of “multiple prime contracts, each based on a Stipulated Price.” Please confirm that this solicitation will result in one prime contract covering all seven Schedule of Items and clarify whether the multiple-prime language in Section 011000 applies.
A8: One award will be made for Items 0001-0007. There will not be multiple prime contractors.
Q9: The solicitation requires offerors to submit preliminary designs/layouts and product literature for the proposed tiny houses and kitchen/laundry/shower facility, while Drawing Z1 identifies the layouts as “Potential” and “Suggested.” Please define the Contractor's complete design responsibility and confirm responsibility for final architectural, structural, mechanical, plumbing, electrical, energy, accessibility, foundation, and site-installation design, including required California-licensed design professionals.
A9: According to the SOI and drawing Z1 the three Tiny houses are to be 590 sq. ft each. These Tiny houses will be located at a 7000 ft elevation.
• The two barracks are to have two bedrooms and a living area downstairs and a bedroom in the loft area. For a total of three sleeping areas per barrack. There are no bathrooms or kitchen area in these two barracks. Required electrical fixtures would include standard outlets and interior and exterior light fixtures. One propane wall heater in the living area is required.
• The kitchen is a multi-purpose building with two bathrooms and laundry accommodation.
• The bathrooms will have two toilets, two showers and one sink.
• The laundry area will have two washers and two dryers. The required electrical fixtures will include standard electrical outlets, GFI’s in wet areas, and interior and exterior light fixtures. The loft area will be open and used for storage.
The contractor is to submit information to manufacturers.
Q10: Please identify the Authority Having Jurisdiction for factory plan approval, factory inspection, site installation, foundations, utility connections, accessibility, fire/life-safety review, and final occupancy/acceptance of the three prefabricated buildings.
A10: The Forest Service will have final approval authority.
Q11: Please confirm whether Barracks Nos. 1 and 2 and the Kitchen/Laundry/Restroom Building are subject to California HCD Factory-Built Housing and/or Commercial Modular requirements.
If applicable, please identify requirements for HCD-approved plan review, Quality Assurance Agency factory inspection, California insignia, and site-installation approval.
1240LT26Q0103
September 23, 2026
A11: Limited road access requires the construction of a Pre‑cut (kit) homes. Materials that are premeasured and cut at a factory, then shipped for on-site assembly. This includes log cabin kits and timber-frame kits. Requirements and guidelines recommended by the manufacture shall be followed.
Q12: Please provide a consolidated list of governing building, structural, electrical, plumbing, mechanical, energy, fire, accessibility, and WUI codes and editions. Please specifically reconcile references to the 2018 IBC with the California/federal code cycle applicable to factory approval and construction during 2026–2027.
A12: Pre‑cut (kit) homes. Materials that are premeasured and cut at a factory, then shipped for on-site assembly. This includes log cabin kits and timber-frame kits. Requirements and guidelines recommended by the manufacture shall be followed.
Q13: Please identify the required occupancy/regulatory classification for Barracks Nos. 1 and 2 and the Kitchen/Laundry/Restroom Building, including whether the barracks are considered dormitories, employee housing, transient lodging, residential occupancy, or another classification.
A13: Barracks Nos.1 and 2 are considered dormitories. Residential occupancy.
Q14: Please provide the project-specific structural design criteria for the High Sierra site, including ground snow load, balanced and unbalanced roof snow loads, drift/sliding snow, wind speed and exposure, risk category, seismic design category, site class, applicable seismic coefficients, and frost depth.
A14: See Attachment 7 - ASCE Design Criteria
Q15: Please provide any available geotechnical information for the project sites, including allowable soil bearing pressure, groundwater, expansive-soil conditions, excavation conditions, and foundation recommendations. If no geotechnical report is available, please provide the Government-required design assumptions to be used for bidding and foundation design.
A15: No soil report is available. Design assumption using the following parameters:
Min allowable soil bearing: 1500 psf Frost depth: 24” min
1240LT26Q0103
September 23, 2026
Q16: No final foundation drawings are provided for the three High Sierra prefab buildings.
Please identify the required foundation type for each structure and confirm whether the Government or Contractor/manufacturer is responsible for final foundation engineering, reinforcing, anchorage, uplift restraint, lateral resistance, and module-to-foundation connections.
A16: The foundation shall be supported over concrete foundation pads (2500 psi at 28 days) and C.P. seismic piers systems by Central Piers Inc or approved equal. Rock Solid Engineering, inc.
for Central Piers.
Q17: Schedule Items 0002 and 0003 state that no water or sewer is needed for the two barracks.
Drawing Z1, however, depicts Bathroom 1 and Bathroom 2 within the suggested barracks layout.
Please confirm whether bathrooms are required in either barracks. If bathrooms are required, please provide the required fixtures, showers if applicable, domestic hot water, water, sanitary sewer, venting, and utility requirements. If bathrooms are not required, please confirm that the bathrooms depicted on Z1 are to be omitted.
A17: Barracks drawing Z1 depicts footprint of buildings. Bathrooms are located in Kitchen building only.
Q18: The Schedule of Items contains approximately 208-SF facility references, while the item descriptions require approximately 590 SF or equivalent, and Drawing C6 indicates approximately 600-SF buildings. Please confirm the required floor area for each barracks and whether the Z1 room arrangement, dimensions, and “upstairs” area are mandatory or conceptual.
A18: The 208 SF refers to the building that was removed. The new tiny house shall have 590 Sq.ft. including the upstairs loft.
Q19: Please confirm whether the Architectural Barriers Act Accessibility Standards, 2010 ADA Standards, CBC Chapter 11B, or a combination governs this project. Please identify which barracks/sleeping rooms, kitchen/laundry facilities, restrooms/showers, entrances, parking/drop-off areas, and exterior routes are required to be accessible.
A19: The two barracks and one kitchen facility do not require ADA accessibility.
Q20: Specification Section 134213 requires prefabricated bathroom-unit modules. Please confirm whether separate proprietary bathroom pods are required inside the prefabricated Kitchen/Laundry/Restroom Building or whether factory-integrated bathrooms constructed as part of the primary approved prefab building are acceptable.
A20: Separate proprietary bathroom pods are not required inside the prefabricated kitchen/Laundry/Restroom Building. The factory-integrated bathrooms constructed as part of the primary approved prefab building is acceptable.
1240LT26Q0103
September 23, 2026
Q21: Please provide an equipment/appliance schedule identifying responsibility for the refrigerator, range/cooktop, oven, microwave, dishwasher, exhaust hood, washer, dryer, water heater, and other kitchen/laundry equipment. Please also provide required domestic-hot-water capacity/fuel source and kitchen/laundry exhaust requirements.
A21:
Appliance Schedule
No. Appliance Fuel Source Exhaust Req.
Responsibility
2 Dryer Propane Vented outside
Contractor
2 Washer N/a N/a Contractor
2 Refrigerator Propane/Elec Vented outside
Contractor
1 Tankless Water Heater
Propane/10 gpm
Vented outside
Contractor
2 Stove Propane To exhaust hood
Contractor
2 Exhaust Hood
Interior vent Contractor
1240LT26Q0103
September 23, 2026
Q22: Drawing C5 notes that existing utilities shown may not yet be installed or may be located differently at the time of construction. Please provide the anticipated points of connection and limits of Contractor work for domestic water, sanitary sewer, permanent electrical service, and LPG serving the new buildings, including available electrical voltage/phase/ampacity, water pressure/flow, sanitary pipe size/invert, and LPG service information.
A22: Connections to the utilities will not be needed in this contract. Supply lines will be determined on a separate contract. All plumbing, electrical, and plumbing installations in the pre-fab buildings are provided by the manufacturer. The buildings are to be constructed to be ready for hook-ups.
Q23: If utilities shown on Drawing C5 are not installed, are located materially differently, or require substantially greater extension than depicted when construction begins, please confirm whether the additional utility extension/relocation work will be handled as a contract change rather than considered incidental to the Contractor's lump-sum price.
A23: Connection to existing utilities will be on a separate contract. No additional extensions will be required.
1240LT26Q0103
September 23, 2026
Q24: The solicitation/Schedule of Items references a pit or dual-pit toilet, while Drawing C7 calls for a double vault toilet. Please confirm the required system and provide the manufacturer/model or basis-of-design requirements, including vault capacity, building configuration, excavation, foundation/support, venting, ADA apron/landing, bollards, accessible route, grading, and restoration.
A24:
1240LT26Q0103
September 23, 2026
Q25: The new double-vault toilet is shown within the existing toilet footprint, but the demolition requirements are not clearly defined. Please identify what portions of the existing toilet, foundation, vault, contents, piping, and associated improvements are to be pumped, demolished, removed, abandoned, or retained.
A25: The two existing toilets and everything pertinent will be removed under a separate contract.
Nothing will remain in the existing toilet footprint.
Q26: The plans/Schedule of Items describe a 30'×40'×14' pole barn open on three sides, with an approximately 10'×30' enclosed storage area. Specification Section 133419 describes a manufacturer engineered structural-steel metal-building system. Please confirm whether the required structure is a conventional post-frame/pole building or a rigid-frame structural-steel building and whether Section 133419 applies in full.
A26: The required structure is a conventional post-frame/pole building open on two sides, with a 10’x30’ enclosed storage area.
1240LT26Q0103
September 23, 2026
Q27: Please provide the required pole-barn foundation criteria, including post/pier/footing configuration, reinforcement, anchorage and uplift requirements. Please also confirm whether a concrete slab is required in the open barn and/or enclosed storage area, whether the R-19 wall/R- 60 roof insulation requirements apply, and provide the power source and requirements for the specified interior lights and exterior floodlights.
A27: Foundation criteria, including post/pier/footing configuration, reinforcement, anchorage and uplift requirements are the responsibility of the manufacturer. The pole barn does not have a concrete slab. No insulation is required for the storage area. The pole barn will not be connected to a power source. The required wiring is two security lights mounted in the corners and wired into a single panel box.
Q28: Please provide the existing generator manufacturer/model, kW rating, voltage, phase, fuel type, controls, wiring configuration, and operational requirements. Please also provide existing electrical-panel information and clarify whether the generator must remain operational during construction and what shutdown periods are permissible.
A28: The existing generator is an 11k single phase 240-volt propane Generac generator. Existing panel is 100 amps. The generator does not need to remain operational during construction.
Q29: The Schedule of Items requires tying into the existing solar system and adding additional solar for daytime water-tank filling and radio usage. Please provide the existing PV module quantity/capacity, inverter, charge controller, battery system, voltage, disconnects, grounding, and existing one-line diagram. Please also provide the required additional PV capacity or design loads/performance criteria for the new system.
A29: The solar system tie-in and all solar system work has been removed from this contract.
Q30: Please provide an existing/proposed electrical one-line and required sequence of operation showing the generator, solar array, inverter/charge controller, batteries if applicable, panelboards, disconnects, grounding, water-pump load, radio load, and transfer/interlock requirements. Please also identify requirements and locations for the remote generator-shutdown switches serving the barracks and kitchen.
A30: The solar system tie-in and all solar system work has been removed from this contract. One shut down switch is to be located in the kitchen near second entry door.
Q31: Please identify which project structures are subject to the lightning-protection requirements contained in the specifications, including whether the requirement to protect open-air areas within 100 feet of exterior walls applies. Please also identify the applicable wildfire/WUI requirements, including whether California Chapter 7A or another Forest Service/federal standard governs roofing, siding, soffits, vents, glazing, exterior doors, decks/porches, and other exterior assemblies.
1240LT26Q0103
September 23, 2026
A31: Lightning systems for cabins in Sierra National Forest should follow NFPA 780 and FS requirements (minimum ClassࣟII components for over 75ࣟft, proper components, and inspections).
There is no specific 100‑ft rule—coverage is determined by the protective radius of the system.
Wildfire/WUI standards in California apply only if the property is within a CalFire-designated Fire Hazard Severity Zone or WUI Fire Area. In those areas, CWUIC (formerly Chapterࣟ7A/R337) governs exterior assemblies with strict ignition-resistance rules. If outside CA WUI zones, FS or federal agencies may encourage best practices but do not enforce ignition-resistant building code equivalents.
Q32: Please confirm whether automatic fire sprinkler systems are required in Barracks Nos. 1 and 2 or the Kitchen/Laundry/Restroom Building. If sprinklers are not required, please identify the applicable exception. Please also confirm required smoke detection, carbon-monoxide detection, fire extinguishers, emergency lighting, exit signage, and other fire/life-safety systems for the occupied prefab buildings.
A32: Automatic sprinklers systems will not be required. Smoke detectors and CO detectors are required.
Q33: Are soil boring reports available?
A33: No. There are no soil boring reports.
Q34: Please clarify responsibility for construction surveying and staking and identify whether the Government will provide survey control points, benchmarks, coordinates, or other staking data for locating the proposed structures and utilities.
A34: The government will stake location of the buildings. Utilities will not be connected to the buildings being fabricated under this contract.
Q35: No express concrete-slab requirement was located for the three tiny-house structures.
Sections 031000, 032000, and 033000 contain general concrete requirements but provide no tiny-house slab dimensions, reinforcement, footings, frost depth, anchorage, or location. Drawing C9 expressly references an existing concrete pad only for the generator shed. Section 061000 instead includes wood-framed subflooring. The tiny-house foundation system therefore appears undefined and requires Government direction.
A35: Foundation to be constructed per manufacturer recommendation.
1240LT26Q0103
September 23, 2026
Q36: Contract reference: SOI Items 0002-0004; Specification 011000, Paragraph 1.01.B;
Drawing Z1. Clarification requested: Please confirm whether prefabrication is mandatory or whether the Government will accept conventional wood-framed construction built entirely onsite that complies with the government requirements mentioned on the solicitation documents, including prepare and submitting a complete, coordinated architectural, structural, foundation, mechanical, plumbing, electrical, and California Title 24 energy-compliance package, including all necessary engineering calculations, for Government review and approval before construction.
Locating a prefabricated tiny-home product that satisfies all Government program and technical requirements appears difficult.
A36: Prefabricated structure or kits to be assembled on sight per manufactures recommendations are required.
Q37: Contract reference: SOI Items 0002-0004 and Drawing Z1, labeled 'Potential' and 'Suggested.' Clarification requested: Please confirm whether Dream Home Plans Plan 2508R is a mandatory basis of design or a conceptual reference. Confirm whether 590 square feet means total conditioned floor area including the loft, the building footprint, or another measurement.
Provide required bedroom count, occupant capacity, room sizes, loft area, clear heights, stair configuration, and criteria for an 'equivalent' design.
A37: SOI LINE 0002 Provide new 590 sq.ft (or Equivalent ) two bedroom tiny house. Dream Home Plans are not mandatory but are the recommended floor plan including the loft. The equivalent will have the same requirements. 590 square feet is the total conditioned space. The suggested plans show two bedrooms, a loft that can be used as a bedroom, and a common space.
Three occupants. Drawing Z1 shows building dimensions.
Q38: Contract reference: No geotechnical report or complete structural criteria were located in the reviewed attachments. Clarification requested: Please provide allowable soil bearing pressure, frost depth, groundwater/expansive-soil criteria, ground snow load, roof snow load, snow-drift and rain-on-snow criteria, wind speed/exposure, seismic design category, importance/risk category, and any wildfire/WUI requirements applicable to the three occupied structures.
A38: See Attachment 7 - ASCE Design Criteria.
Q39: Contract reference: Site drawings identify approximate building locations but do not provide finished grades or detailed building pads. Clarification requested: Please define required clearing, excavation, over-excavation, engineered fill, compaction testing, drainage, erosion control, roof runoff, walkways, landings, stairs, decks, ramps, railings, and accessible routes for each building. Confirm whether these items are included in Items 0002-0004.
A39: Clearing where the structures will reside is required.
1240LT26Q0103
September 23, 2026
Q40: Contract reference: SOI Items 0002-0004 require propane gas heating; no permanent HVAC equipment schedule was located. Clarification requested: Please identify the acceptable heating-system type, winter design temperature, required indoor temperature, ventilation standard, controls, and commissioning requirements. Confirm whether air-conditioning is excluded. For the kitchen/laundry building, clarify required bathroom exhaust, make-up air, kitchen exhaust, and duct termination requirements.
A40: No permanent HVAC. The heater is a standard wall space heater. Bathroom exhaust consists of a window since power will be limited.
Q41: Contract reference: SOI Items 0002-0004 require electrical fixtures; no tiny-house electrical plans or load schedules were located. Clarification requested: Please provide existing service voltage/phase, available capacity.
A41: Follow the manufacturers’ recommendations.
Q42: Contract reference: SOI Item 0004; plumbing specifications; Drawing Z1.
Clarification requested: Please provide a complete fixture and equipment schedule of Government-furnished equipment including propane and electrical loads, as this is needed for electrical load and gas pipe sizing.
A42: See Question 21. See prefab manufactures recommendations.
| Amendment 02 High Sierra Upgrades.pdf |
| Q_A |
File details come from the government source that posted it. Updated .