This is a Schedule of Items (SOI) pricing template for the Sherando Recreation Area Rehabilitation project at George Washington & Jefferson National Forest under solicitation 1240LT26Q0089. The document is a line-item budget spreadsheet establishing estimated quantities and unit costs for all base and optional work items, with contractors required to provide unit pricing that will be auto-calculated into total costs.

The base work consists of five primary scopes: General Conditions (mobilization, surveying, erosion control, seeding, and documentation); Campground Water System Replacement (NPDES permitting, clearing, removal of existing structures, installation of pressure relief valves, air release valves, approximately 10,600 linear feet of HDPE waterline in various diameters with control wiring, valve boxes, frost-free hydrants, water fill station, horizontal directional boring operations, and related earthwork); Well House Repairs for both wells (submersible pump installation, pump control systems, conduit and wiring, building envelope improvements including siding, insulation, doors, windows, heating, ventilation, and electrical panel repairs); Beach Bathhouse Interior Renovations (approximately 1,570 square feet of interior demolition and renovation including plumbing, HVAC, electrical, and finishes); Lower Loop A Bathhouse Interior and Exterior Renovations (approximately 615 square feet interior and 1,110 square feet exterior including roofing, siding, stone veneer, doors, and mechanical/electrical systems); and Upper Loop A Bathhouse Replacement (approximately 634 square feet of new building construction with associated sitework including demolition, clearing, grading, concrete paving, water supply, sanitary sewer with septic tanks, and electrical service). Five optional items are available for award at the Government's discretion: Day Use Pedestrian Walkways & Memorial Garden; Boat Dock & Kayak Launch; Day Use Picnic Area Renovations; Conduit along Service Road for Pump Controls; and Conduit in Casing for Pump Controls. Contractors must submit pricing for all base and optional items, with unit prices governing in case of calculation errors, and payment for bond premiums must be included within mobilization costs rather than added to the contract price.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI-Sherando

SCHEDULE OF ITEMS

Sherando Recreation Area Rehabilitation George Washington & Jefferson National Forest

1240LT26Q0089

BASE ITEMS
ITEM
NUMBERDESCRIPTIONEST QTYPAY UNITUNIT COSTTotal COST
0000 General Conditions
0000AAMobilization1LS$ - 0$ - 0
0000ABConstruction Surveying & Staking1LS$ - 0$ - 0
0000ACErosion & Sediment Control Measures1LS$ - 0$ - 0
0000ADPermanent Seeding & Restoration1LS$ - 0$ - 0
0000AERed-Line Drawings / O&M Manuals1LS$ - 0$ - 0
TOTAL BASE ITEM 0000$ - 0
0001 Campground Water System Replacement
0001AAAcquire NPDES Permit (incl Erosion Control Plan, fees), SWM Waiver1LS$ - 0$ - 0
0001ABClearing & Grubbing1LS$ - 0$ - 0
0001ACContractor Sampling & Testing1LS$ - 0$ - 0
0001ADRemoval and Disposal of Existing Structures and Obstructions (024102), including abandonment1LS$ - 0$ - 0
0001AE14'x8' Utility Box Furnished and Installed (133402)1LS$ - 0$ - 0
0001AF4" PRV w/4' Dia. Concrete Manhole(133402)2EA$ - 0$ - 0
0001AG3" PRV w/4' Dia.Concrete Manhole(133402)1EA$ - 0$ - 0
0001AHAir Release Valves w/4' Dia Concrete Manhole (133402)3EA$ - 0$ - 0
0001AIValves w/4' Dia Concrete Manhole (133402)1EA$ - 0$ - 0
0001AJ4" HDPE Waterline, Installed (221100)2,895LF$ - 0$ - 0
0001AK3" HDPE Waterline, Installed (221100)2,654LF$ - 0$ - 0
0001AL3" and 1.5" (with Control Wiring) HDPE Waterline, Installed (221100)767LF$ - 0$ - 0
0001AM2" HDPE Waterline, Installed (221100)4,294LF$ - 0$ - 0
0001AN2" and 1.5" (with Control Wiring) HDPE Waterline, Installed (221100)512LF$ - 0$ - 0
0001AO1.5" (with Control Wiring) HDPE Waterline, Installed (221100)617LF$ - 0$ - 0
0001AP2" Daylight Drain Includings GSP, Strainer, Screen, Riprap, Installed (221100)8EA$ - 0$ - 0
0001AQPump Out Drain Valves and Valve Box, Installed (221100)5EA$ - 0$ - 0
0001ARConnections to Existing Buildings (221100)11EA$ - 0$ - 0
0001ASConnections to Existing Well House Supply Line (221100)2EA$ - 0$ - 0
0001ATWater Storage Tank: Supply Line & Bracket Connections, replace seals, replace interior tank ladder1LS$ - 0$ - 0
0001AUWater Storage Tank: Cleaning & Coating of Interior, Painting of Tank Exterior1LS$ - 0$ - 0
0001AV6" Valve & Box, Installed (221100)1EA$ - 0$ - 0
0001AW4" Valve & Box, Installed (221100)3EA$ - 0$ - 0
0001AX2" Valve & Box, Installed (221100)76EA$ - 0$ - 0
0001AY1.5" Valve & Box, Installed (221100)2EA$ - 0$ - 0
0001AZType A - Frost Free Hydrants29EA$ - 0$ - 0
0001BAType B - Frost Free Hydrants14EA$ - 0$ - 0
0001BBWater Fill Station, Installed (Potable Water Tower)1EA$ - 0$ - 0
0001BCHDPE Electrofusion Machine1LS$ - 0$ - 0
0001BDEarthwork - Special bedding, Pipe Zone Material60CY$ - 0$ - 0
0001BEEarthwork - Rock Excavation50CY$ - 0$ - 0
0001BFCrushed Aggregate (Grading D)50CY$ - 0$ - 0
0001BGRoad Asphalt Patching1,800SF$ - 0$ - 0
0001BHHorizontal Directional Boring - 6" & 1.5" HDPE w/Casing Pipe, Boring Pits, Dewatering485LF$ - 0$ - 0
0001BIEngineered Anchor design for 6" & 1.5" supply and distribution lines (for slope)1LS$ - 0$ - 0
0001BJHorizontal Directional Boring - 4" HDPE w/Casing Pipe, Boring Pits, Dewatering89LF$ - 0$ - 0
0001BKHorizontal Directional Boring - 3" & 1.5" HDPE w/Casing Pipe, Boring Pits, Dewatering65LF$ - 0$ - 0
0001BLHorizontal Directional Boring - 3" HDPE w/Casing Pipe, Boring Pits, Dewatering46LF$ - 0$ - 0
TOTAL BASE ITEM 0001$ - 0
0002 Well House Repairs (Both Wells)
0002AASubmersible Well Pump, Installed (Loop A Well)1LS$ - 0$ - 0
0002ABPump Control System (Control panels, Electrical Panel work, electrodes at Storage Tank)1LS$ - 0$ - 0
0002ACConduit and pump control wiring btwn WB and Loop A wells2100LF$ - 0$ - 0
0002ADPump Control Wiring Replacement btwn tank and WB well1200LF$ - 0$ - 0
0002AEReplace Siding (Loop A WH)280SF$ - 0$ - 0
0002AFReplace Insulation (Loop A WH)280SF$ - 0$ - 0
0002AGReplace Doors (incl vent in new door)3EA$ - 0$ - 0
0002AHReplace Windows (Loop A WH)2EA$ - 0$ - 0
0002AIWall Heater, Installed (Loop A WH)1EA$ - 0$ - 0
0002AJElectrical Panel Repairs2EA$ - 0$ - 0
0002AKAir Fans (ventilation), installed2EA$ - 0$ - 0
0002ALWell cap & drain, installed (Williams Branch WH)1LS$ - 0$ - 0
* WB = Williams Branch; WH = well houseTOTAL BASE ITEM 0002$ - 0
0003 Beach Bathhouse Interior Renovations
0003AADemolition of Interior Finishes, Fixtures, Furnishings1570SF$ - 0$ - 0
0003ABInterior Specialties (Toilet Accessories, Toilet Partitions & Stalls, Baby Changing Station, etc)1,570SF$ - 0$ - 0
0003ACFinishes (Wall, Flooring, Trim, Ceiling)1,570SF$ - 0$ - 0
0003ADPlumbing (Fixtures, Domestic Water Piping, Valves, Sanitary, Specialties)1570SF$ - 0$ - 0
0003AEHVAC (Ductwork, Insulation, Grilles/Registers/Diffusers, Supply/Exhaust Fans/Vents, Specialties, Airside testing/Balancing)1570SF$ - 0$ - 0
0003AFElectrical - Switches & Circuit Breakers1570SF$ - 0$ - 0
0003AGLighting & Branch Wiring1570SF$ - 0$ - 0
0003AHEquipment & Furnishings (cabinets, countertops)1570SF$ - 0$ - 0
0003AISitework - Building Connections to existing utilities1LS$ - 0$ - 0
TOTAL BASE ITEM 0003$ - 0
0004 Lower Loop A Bathhouse Interior and Exterior Renovations
0004AADemolition of Interior Finishes, Fixtures, Furnishings and Exterior Roofing, Siding615SF$ - 0$ - 0
0004ABExterior Walls (stone veneer, wood siding, column wrap)1110SF$ - 0$ - 0
0004ACExterior Doors2EA$ - 0$ - 0
0004ADRoofing1068SF$ - 0$ - 0
0004AEInterior Specialties (Toilet Accessories, Toilet & Shower Partitions, Baby Changing Station, etc)615SF$ - 0$ - 0
0004AFFinishes (Wall, Flooring, Base/Curb/Trim, Ceiling)615SF$ - 0$ - 0
0004AGPlumbing (Fixtures, Domestic Waste Piping, Valves, Sanitary, Specialties incl outside sink and bottle filler)615SF$ - 0$ - 0
0004AHHVAC (Ductwork, Insulation, Grilles/Registers/Diffusers, Supply/Exhaust Fans/Vents, Specialties, Airside testing/Balancing)615SF$ - 0$ - 0
0004AIElectrical - Switches and Circuit Breakers615SF$ - 0$ - 0
0004AJLighting & Branch Wiring615SF$ - 0$ - 0
0004AKEquipment & Furnishings (cabinets, countertops)615SF$ - 0$ - 0
0004ALSitework (Sidewalk, Grading, Conc Curb, Wood Fence, building utility connections)30SY$ - 0$ - 0
TOTAL BASE ITEM 0004$ - 0
0005 Upper Loop A Bathhouse Replacement
BUILDING:
0005AAFoundations634SF$ - 0$ - 0
0005ABSlab on Grade634SF$ - 0$ - 0
0005ACRoof Structure1315SF$ - 0$ - 0
0005ADExterior Walls1235SF$ - 0$ - 0
0005AEExterior Windows24SF$ - 0$ - 0
0005AFExterior Doors7EA$ - 0$ - 0
0005AGRoofing1424SF$ - 0$ - 0
0005AHInterior Partitions & Windows945SF$ - 0$ - 0
0005AIInterior Specialties (Toilet Accessories, Baby Changing Station, etc)634SF$ - 0$ - 0
0005AJFinishes (Wall, Flooring, Base/Curb/Trim, Ceiling)634SF$ - 0$ - 0
0005AKPlumbing (Fixtures, Domestic Waste Piping, Valves, Sanitary, Specialties incl outside sink and bottle filler)634SF$ - 0$ - 0
0005ALHVAC (Ductwork, Insulation, Grilles/Registers/Diffusers, Supply/Exhaust Fans/Vents, Specialties, Airside testing/Balancing)634SF$ - 0$ - 0
0005AMElectrical Service & Distribution634SF$ - 0$ - 0
0005ANLighting & Branch Wiring634SF$ - 0$ - 0
0005AOSpecial Electrical Systems634SF$ - 0$ - 0
SITEWORK:
0005APDemolition (Building, pavements, power, water, sewer incl septic tank)1LS$ - 0$ - 0
0005AQClearing & Grubbing1LS$ - 0$ - 0
0005ARSitework (Earthwork, paving, timber edging, wheelstops, markings, signs, sidewalk, building utility connections)1LS$ - 0$ - 0
0005ASWater Supply (2" pipe, gate valve)1LS$ - 0$ - 0
0005ATSanitary sewer (3"-8" PVC DWV, 1.25" Perf PVC, 6" Pipe Sleeves, 1.25" Septic Valve, 4" Cleanout, Trenching)1LS$ - 0$ - 0
0005AU1500gal Septic Tank with appurenances, installed2EA$ - 0$ - 0
0005AV760gal Dosing Tank with appurtenances, installed1EA$ - 0$ - 0
0005AWSite Electrical (Panelboard, NEMA enclosure, Reinstall CT/Meter Cabinet, Hardware, Conduit, Wire)1LS$ - 0$ - 0
TOTAL BASE ITEM 0005$ - 0

TOTAL BASE AMOUNT (Items 0000 through 0005) $ - 0

OPTION ITEMS

ITEM
NUMBERDESCRIPTIONEST QTYPAY UNITUNIT COSTTotal Cost
0006 Option Item #1: Day Use Pedestrian Walkways & Memorial Garden
0006AAMobilization1LS$ - 0$ - 0
0006ABConstruction Survey & Staking1LS$ - 0$ - 0
0006ACErosion & Sediment Control, Silt Fence720LF$ - 0$ - 0
0006ADSite Demolition1LS$ - 0$ - 0
0006AESite Prep: Grading & Compacted subgrade1LS$ - 0$ - 0
0006AFConcrete Sidewalk (4" w/Gravel Base)5730SF$ - 0$ - 0
0006AGTimber Fencing305LF$ - 0$ - 0
0006AHShower Tower4EA$ - 0$ - 0
0006AIBoulder Garden1LS$ - 0$ - 0
0006AJBench15EA$ - 0$ - 0
0006AKInfo Kiosk1EA$ - 0$ - 0
0006ALTrash Cans (Bear-proof)1EA$ - 0$ - 0
0006AMDrinking Fountain/Bottle Filler1EA$ - 0$ - 0
0006AN6" PVC Drain Line, Installed160LF$ - 0$ - 0
0006AO6" Cleanout Out w/plug1EA$ - 0$ - 0
0006APSitework, Landscaping, & Permanent Seeding1LS$ - 0$ - 0
CCC MEMORIAL GARDEN
0006AQRepair Flagstone surface40SF$ - 0$ - 0
0006ARStone Wall182SF$ - 0$ - 0
0006ASBoulder/Boulder Pedestals12EA$ - 0$ - 0
0006ATWood Bench12LF$ - 0$ - 0
0006AUInterpretive Panels, mounted on Boulders5EA$ - 0$ - 0
TOTAL OPTION ITEM 0006$ - 0
0007 Option Item #2: Boat Dock & Kayak Launch
0007AAMobilization1LS$ - 0$ - 0
0007ABConstruction Survey & Staking1LS$ - 0$ - 0
0007ACErosion & Sediment Control (Turbidity Curtain, silt fence)1LS$ - 0$ - 0
0007ADSite Demolition1LS$ - 0$ - 0
0007AEFieldstone Boatramp1070SF$ - 0$ - 0
0007AFConcrete Sidewalk (4" w/gravel base)1200SF$ - 0$ - 0
0007AGTimber Fencing200LF$ - 0$ - 0
0007AHStone Embankment30SY$ - 0$ - 0
0007AIFS Monument Entrance Signs, including Concrete Pad, stone veneer, signage1LS$ - 0$ - 0
0007AJBoulder w/Wayfinding Signage1LS$ - 0$ - 0
0007AKSitework, Landscaping, & Permanent Seeding1LS$ - 0$ - 0
TOTAL OPTION ITEM 0007$ - 0
0008 Option Item #3: Day Use Picnic Area Renovations
0008AAMobilization1LS$ - 0$ - 0
0008ABConstruction Survey & Staking1LS$ - 0$ - 0
0008ACErosion & Sediment Control, Silt Fence730LF$ - 0$ - 0
0008ADSite Demolition1LS$ - 0$ - 0
0008AESite Prep: Clear & Grub, Fine Grading, Compacted Subgrade1LS$ - 0$ - 0
0008AFConcrete Sidewalk (4" w/gravel base)8865SF$ - 0$ - 0
0008AGTimber Fencing50LF$ - 0$ - 0
0008AHPicnic pad site, including gravel and timber edging, single21EA$ - 0$ - 0
0008AIPicnic pad site, including gravel and timber edging, double8EA$ - 0$ - 0
0008AJPicnic pad site, including gravel and timber edging, triple7EA$ - 0$ - 0
0008AKInfo Kiosk1EA$ - 0$ - 0
0008ALPicnic Tables, Standard22EA$ - 0$ - 0
0008AMPicnic Tables, ABA36EA$ - 0$ - 0
0008ANPicnic Table Anchor2CY$ - 0$ - 0
0008AOBarbeque Pit (single)35EA$ - 0$ - 0
0008APTrash Can (Bear Proof)10EA$ - 0$ - 0
0008AQBoulder w/Wayfinding Signage1LS$ - 0$ - 0
0008ARSitework, Landscaping, & Permanent Seeding1LS$ - 0$ - 0
TOTAL OPTION ITEM 0008$ - 0
0009 Option Item #4: Conduit along Service Road for Pump Controls (btwn Reservoir & Williams Branch Well house)
0009AAConduit and pump control wiring, installed (btwn WB & Tank along service road)3200LF$ - 0$ - 0
TOTAL OPTION ITEM 0009$ - 0
0010 Option Item #5: Conduit in Casing for Pump Controls (btwn Reservoir & Williams Branch Well house)
0010AAConduit and pump control wiring, installed (btwn WB & Tank along service road)1200LF$ - 0$ - 0
TOTAL OPTION ITEM 0010$ - 0

TOTAL OPTIONS AMOUNT (ITEMS 0006 - 0010) $ - 0

TOTAL BASE AND OPTION ITEMS (ITEMS 0000 - 0010) $ - 0

NOTE 1: Contractor input Unit Prices
NOTE 2: Auto Calculated Values
NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations. The Government reserves the right to make award for quantities less than those stated on the Schedule of Items. The Government may award the Optional Items in any order.
NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data.