Sherando Pre-bid Presentation.pdf

PDF 11 MB Posted

Attached to
GAOA Sherando Recreation Area Rehabilitation, George Washington-Jefferson National Forest
Solicitation number
1240LT26Q0089
Issued by

About this file

This is a pre-bid presentation document for the Sherando Recreation Area Rehabilitation project, Solicitation #1240LT26Q0089, issued by the U.S. Forest Service. The project is located at 96 Sherando Lake Drive, Lyndhurst, Virginia 22952, and involves comprehensive rehabilitation of a recreation facility in the George Washington & Jefferson National Forests.

The base scope of work (to be awarded) includes: replacement of water lines (1.5" to 6" HDPE piping with some directional boring), installation of in-ground vaults, valves, and frost-free hydrants, repair of an existing water storage tank and two well houses, installation of an automated well pump control system, interior renovation of the CCC Beach Bathhouse (original construction 1936), interior and exterior renovation of Lower Loop A Bathhouse (2004 construction), and demolition and replacement of the Upper Loop A toilet building (1963 construction) with a new bathhouse including a replacement septic drainfield. The optional scope (funding dependent) includes repairs and replacements of walkways, fences, shower towers, and related items in the beach area, renovation and creation of a kayak launch, installation of a memorial garden at the existing stone boat launch, and renovation of the picnic area including pads, tables, grills, walkways, and signage. A preferred period of performance of 12 months is stated, with campground and day-use closure limited to November 1 through May 21. The contractor must maintain water service to an on-site residence except for a maximum one-week shutdown and must obtain a Master Plumber tradesman license for utility work. Critical environmental considerations include bat conservation measures restricting tree cutting to November 15 through March 31, a limited 18-foot utility corridor for waterline installation to minimize tree clearing, equipment cleanup requirements to control noxious weeds, contractor responsibility for asbestos and lead-based paint testing, and restrictions on lake level lowering. Temporary facilities provided include limited electrical service (20, 30, or 50 amps depending on location) and anticipated but unguaranteed wifi; no water or sanitary sewer facilities will be provided. The contractor must obtain a Stormwater Management Linear Utility waiver from the Virginia Department of Environmental Quality, prepare a Stormwater Pollution Prevention Plan and Erosion & Sediment Control plans for Construction General Permit VAR10 coverage, and transfer the Construction General Permit to the contractor before construction begins; the septic system construction permit from the Virginia Department of Health has already been acquired by the Forest Service. The project organization utilizes two separate plan sets: one for the water system (30 pages with separate specifications) and one for bathhouse and day-use area work (85 pages with separate specifications). A pre-bid site visit is scheduled for August 12, 2026, at 12:00 PM at the CCC Beach Bathhouse, and formal questions must be submitted to the Contracting Officer by August 19, 2026.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Angela Parrish

Aug 11, 2026

Engineering Project Manager

Sherando Recreation Area Rehabilitation Pre-Bid Presentation, Solicitation # 1240LT26Q0089

Pre-Bid Agenda

• Introductions

• Project Location

• Description of Project

• Discuss Important Aspects of the Project

• Contracting Officer - highlights

• Site Walk-Through at Sherando Rec Area

• Questions

EmailName Kelly.shaw@usda.govKelly Shaw, Contracting Officer (CO) Judith.martin@usda.govJudith Martin, Contracting Specialist (CS)

Jimmy.shaw@usda.gov Jimmy Shaw, Contracting Officer’s Representative (COR) angela.parrish@usda.govAngela Parrish, Project Manager Lauren.stull@usda.govLauren Stull, District Ranger Jonathan.zimmerman@us da.govJonathan Zimmerman, Recreation Lead jason.osborne@usda.gov Jason Osborne, Developed Recreation Program Mgr.

Rory.mullenex@usda.govRory Mullenex, Facilities Engineer

Introductions: US Forest Service

Sherando Recreation Area 96 Sherando Lake Dr.

Lyndhurst, VA 22952

Lat/Long: N 37.929969, W 78.979343

Sherando Background

Project Description

• Base Scope (will be awarded):

• Replace water lines, repair water tank (cyan), repair well houses (cyan)

• Renovate interior of CCC Beach Bathhouse (yellow)

• Renovate interior and exterior of Lower Loop A bathhouse

(red)

• Replace toilet building in Upper Loop A with a new bathhouse

(purple)

• Optional Scope (not guaranteed, funding dependent):

• Repair or replace walkways, fences, shower towers, and related items in beach area

• Renovate and create an established kayak launch

• Install a new memorial garden at existing stone boat launch

• Renovate picnic area, including picnic pad sites, tables, grills, walkways and signage

Images of the Water System plan set, 30 pages; separate specs for water system.

Project Organization – Uses (2) plan sets

Images of the Bathhouse and Day Use Area plan set, 85 pages. Separate specs for Bathhouses and Day Use Area work.

Project Organization – Uses (2) plan sets

Project Organization - Permits

• Water system has a single plan set with associated specifications

• Additional work is required by the contractor to obtain a Stormwater Management Linear Utility waiver from VA Dept. of Env. Quality (VDEQ).

Note FS has briefly reviewed the project w/VDEQ and was told it should qualify.

• Additional work is required by the contractor to prepare a Stormwater Pollution Prevention Plan (SWPPP) and E&SC plans for the water system to support applying for coverage under the Construction General Permit VAR10 with VDEQ.

• No VDH permit req’d for this replacement water system (no change in capacity or function).

• Bathhouse and Day Use area renovations are together on a second plan set, with associated specifications

• All permits from DEQ for stormwater management and erosion & sediment control, including the Construction General Permit are acquired. This permit will need to be transferred to the contractor before construction begins.

• Septic system (drainfield) construction permit from VA Dept of Health (VDH) for Upper Loop A bathhouse has been acquired by the FS.

Sherando Water System Replacement (base scope)

• Abandon or remove existing waterline to support installation of replacement waterlines, including 1.5” up to 6” HDPE. Some length of waterline will be directionally bored.

• Install replacement in-ground vaults, valves, frost-free hydrants

• Perform repairs to the existing water storage tank and (2) existing well houses

• Install a new automated well pump control system (for both wells) including conduit for wiring

CCC Beach Bathhouse – Interior Renovations (base scope)

• Original construction = 1936

• Remodeled in 1990,

• Floors refinished in 2018,

• Roof replaced 2019,

• Structural (rafter) repairs and window refurbishment 2026

• Replace interior furnishings, fixtures (sinks, toilets, stalls, showers), and finishes (floor and wall tile)

• Replace all MEP and update exterior building water/sewer connections

Lower Loop A Bathhouse – Interior & Exterior Renovations (base scope)

• Original construction = 2004

• Replace all interior furnishings, fixtures, and finishes

• Replace all MEP

• Replace the exterior siding and roofing, add gutters

• Remove the skylight

• Add/renovate sidewalk and exterior drainage

• Add exterior sink and water fountain

Upper Loop A Bathhouse Replacement (base scope)

• Original construction = 1963

• Demolish existing restroom structure

• Construct replacement bathhouse, including site improvements

• Construct replacement septic drainfield

Day Use Pedestrian Walkways & Memorial Garden (optional scope)

• Replace walkways

• Replace day use features including timber fencing, shower towers, kiosk, benches, trashcans

• Install new boulder garden area

• Install new CCC Memorial

Garden

Boat Dock Station and Kayak Launch (optional scope)

• Replace walkways

• Replace features including timber fencing, trash receptacles, fee tube

• Demolish some features (trees, fountain, kiosk, stone embankment)

• Install new walkway access to the shoreline for kayak launch

• Install new entry signage, trees, and stone bank protection

Day Use Picnic Area Renovations (optional scope)

• Remove picnic furnishings (grills, tables)

• Install picnic pads including new tables and grills

• Replace walkways, fencing, drainage features

• Remove trees

• Salvage existing trash cans

• Install new kiosk

Important Project Considerations:

• Other optional scope – conduit and wire installation for well pump control system

• Excluded – repairs referenced on S-101, A-201, A-202 for Building 001 repairs (roof, timber members , dormer framing and windows)

• Preferred period of performance: 12 months

• Permits – review the statement of work closely

• Requiring a “Master Plumber” tradesman license for one individual involved any utility work, including water system replacement

• Project Site Closure – campground/day use closure limited to Nov 1 – May 21. Maintain water service to a residence on site except for a maximum one-week shutdown.

• Temporary facilities: No water, no sanitary sewer. Some power (20, 30 or 50A service depending on location) in campground loops. Wifi is anticipated but no guarantee when it will become available.

• Environmental considerations:

• Clean off equipment prior to arrival to control spread of noxious weeds.

• Bat Conservation measures – tree cutting only allowed from Nov 15 – Mar 31

• Utility corridor for waterline install is limited to minimize tree clearing (18’)

• No asbestos or LBP testing has been performed; successful bidder will be responsible for this.

• Restrictions on lake level lowering, see statement of work.

Contracting Officer - highlights

Site Visit – Scheduled for Aug 12, 2026 at 12pm

• Meet up at the CCC Beach Bathhouse with Forest Service Staff

• Make sure you fill out the sign in sheet

• FS staff will host and walk with the attendees to visit:

• Beach Bathhouse

• Day Use Area,

• including the beach,

• New memorial garden and boulder garden areas

• Kayak launch

• Picnic area

• Loop A – Upper & Lower Bathhouses

• Well houses (both)

• Limited visits to the water tank

Note: Formal questions will need to be submitted to the CO by August 19.