c.ATT 2 - SR20190008 ECRD IT Load Listing.xls
XLS spreadsheet 37 KB Posted
- Attached to
- Emigrant Creek Interagency Fire Facility Federal contract opportunity
- Solicitation number
- 1204M320R0001
About this file
This document contains a load listing for electrical equipment in an IT room and a related federal contract opportunity notice. The load listing provides specifications for various network, server, security and communication equipment located in the IT room of a Forest Service district office, including manufacturer, model, voltage requirements, amperage draw and heat output. The related federal contract opportunity is to replace two converted residences serving as fire offices in Hines, Oregon with a new 14,800 square foot premanufactured facility that may include demolition of existing structures, site work, utilities and landscaping. The solicitation was issued by the USDA Forest Service Pacific Northwest Region for the Emigrant Creek Interagency Fire Facility project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd002.docx | DOCX document | |
| Amd002_RFI_Responses.docx | DOCX document | |
| Amd001.docx | DOCX document | |
| Amd001_RFI_Responses.docx | DOCX document | |
| c.ATT 2 - 20180406 AE Submission-ECRD.docx | DOCX document | |
| c.ATT 2 - SR20190008 ECRD Equipment Load Listing.xls | XLS spreadsheet | |
| d.ATT 4 - Wage_Determination.docx | DOCX document | |
| c.ATT 2 - 041717_Bldg_Sec_Policy_FINAL.pdf | ||
| c.ATT 2 - TOC Section J 20200110.docx | DOCX document | |
| c.ATT 1 - CombinedSpecPackage.pdf | ||
| b.final_solicitation_package.doc | DOC document | |
| a.offerors_packet.doc | DOC document | |
| c.ATT 2 - Room Data Sheet-Emigrant Creek 20200116.pdf | ||
| c.ATT 3 - ECIFF 3.0 Drawings.pdf | ||
| c.ATT 2 - ITelectDesignGuide020160310.pdf | ||
| c.ATT 2 - AccessControlSystemDesignGuidelines-20180702.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IT Room Equipment Loads
| IT Room Network and Server Equipment Load Listing | |||||||||||||||||||||||
| Forest: | National Forest Name | NP = normal power | |||||||||||||||||||||
| Location: | XYZ District office | IG = isolated ground computer power | Dedicated = 1 outlet, 1 breaker | Individual Equipment Data | Totals Calculated Don’t enter | ||||||||||||||||||
| Date: | 12/12/06 | ||||||||||||||||||||||
| Submitter: | Person Name | single outlet | |||||||||||||||||||||
| AGENCY | Quan. | Equipment Type | Location - Workstation or Room # | Manufacturer | Make/Model # | Rack Mount/ Wall Y/N | L in. | W in. | H. in. | WT. Lbs. | Data Outlet at Equipment RJ45 CAT 6 QUANTITY | NP | IGP | Dedicated Circuit | Voltage 120, 208 or 240 | Phase 1 or 3 | Nameplate Current A | Watts Napeplate | Plug Type | Volt-Amps | Total Watts | Total Volt Amps | Total BTU |
| FS | 1 | router | MDF RACK | CISCO (router) | Rack | 14.7 | 17.1 | 3.5 | X | Y | 120 | 1 | 10.0 | 1,200 | 5-15P | 1,200 | 1,200 | 1,200 | 4,096 | ||||
| BLM | 1 | router | MDF RACK | CISCO (router) | Rack | X | Y | 120 | 1 | 10.0 | 1,200 | 5-15P | 1,200 | 1,200 | 1,200 | 4,096 | |||||||
| FS | 3 | switch | MDF RACK | Cisco (Switch) | Rack | X | Y | 120 | 1 | 5.0 | 600 | 5-15P | 600 | 1,800 | 1,800 | 6,143 | |||||||
| BLM | 3 | switch | MDF RACK | Cisco (Switch) | Rack | X | Y | 120 | 1 | 5.0 | 600 | 5-15P | 600 | 1,800 | 1,800 | 6,143 | |||||||
| FS | 120 | 1 | 0 | 0 | 0 | 0 | |||||||||||||||||
| FS | 120 | 1 | 0 | 0 | 0 | 0 | |||||||||||||||||
| FS | 120 | 1 | 0 | 0 | 0 | 0 | |||||||||||||||||
| FS | 1 | Access control system | IT Room | wall | 2 | X | Y | 120 | 1 | 5.0 | 600 | hard wire | 600 | 600 | 600 | 2,048 | |||||||
| FS | 1 | PA System | IT room | wall | X | Y | 120 | 1 | 6.0 | 720 | hard wire | 720 | 720 | 720 | 2,457 | ||||||||
| FS | 1 | FA Panel | IT room | wall | 2 | X | Y | 120 | 1 | 6.0 | 720 | hard wire | 720 | 720 | 720 | 2,457 | |||||||
| FS | 1 | intrusion detection system | IT room | wall | 1 | X | Y | 120 | 1 | 6.0 | 720 | hard wire | 720 | 720 | 720 | 2,457 | |||||||
| FS | 1 | VSS system | IT room | rack | X | Y | 120 | 1 | 12.0 | 1,440 | 5-15P | 1,440 | 1,440 | 1,440 | 4,915 | ||||||||
| 120 | 1 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 120 | 1 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 120 | 1 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 120 | 1 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| 120 | 1 | 0 | 0 | 0 | 0 | ||||||||||||||||||
| All above equipment is on one UPS with maintenance bypass switch feeding one IT room isolated ground power panel. | Total Watts | Total Volt-Amps | Total BTU | ||||||||||||||||||||
| * Note UPS in IT rom must be included in load as it rejects heat, add to total cooling load | 10,200 | 7,800 | 34,813 | ||||||||||||||||||||
| UPS size based on continuous load at maximum of 80% of nameplate rating | |||||||||||||||||||||||
| Select next standard size UPS larger than calculsted load, AFTER adding some future spare capacity | Minimum UPS Size VA @ Max 80% Load | 9,750 | |||||||||||||||||||||
| Updated 8/26/2008 SDS | Minimum Cooling Size BTU + any room gains | 34,813 | |||||||||||||||||||||
| Add 25% spre capacity when sizing UPS | |||||||||||||||||||||||
| FS | 1 | * UPS See note above | IT room | XYZ | X | Y | 203 | 3 | 20.0 | 1,000 | HW | 7,032 | 1,000 | 7,032 | 3,413 |
File details come from the government source that posted it. Updated .