Bid Results Summary: Burnett Library Energy Efficiency Upgrade Project
This document is a bid results summary for the City of Long Beach's rebid of project R-7234, the Burnett Library Energy Efficiency Upgrade Project (PW-24-454). The project encompasses seven line items across multiple construction divisions, including selective demolition of roofing (Division 2), wood work (Division 6), thermal and moisture protection with roofing and sheet metal flashing (Division 7), plumbing (Division 22), mechanical packaged roof top air-conditioning units (Division 23), electrical identification for electrical systems (Division 26), and mobilization/demobilization. All items are specified as lump sum (LS) contracts with a quantity of one unit each. Four contractors submitted bids in response to the July 1, 2024, 10:00 a.m. bid deadline.
The total bids submitted ranged significantly in cost among the four contractors: EA Design and Build, LLC submitted the lowest bid at $890,000.00, followed by Cornerstone Construction Group at $1,307,057.06, Archico Design Build Inc at $1,719,000.00, and SJD&B, Inc. at $1,745,000.10. Notable variations exist across individual line items, such as roofing demolition bids ranging from $47,000.00 to $511,608.06, and roofing and sheet metal flashing bids ranging from $362,250.00 to $920,818.72. Cornerstone Construction Group noted that plumbing costs were included in Item #5 (mechanical units). The mobilization/demobilization requirement was capped at no more than 5 percent of the subtotal of items 1-6.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R-7234 REBID: Burnett Library Energy Efficiency Upgrade Project
EA Design and Build, LLC
Cornerstone Construction Group
Archico Design Build Inc SJD&B, Inc.
Item # Print Sequence Description UOM Quantity Item Total Item Total Item Total Item Total
1 1 Division 2 - Existing Conditions. Selective Demolition - Roofing LS 1 47,000.00 511,608.06 100,267.36 245,224.69 2 2 Division 6 - Wood LS 1 61,699.80 45,150.00 171,000.00 71,815.80 3 3 Division 7 - Thermal and Moisture Protection. Roofing, Sheet Metal Flashing LS 1 493,040.71 362,250.00 659,680.00 920,818.72 4 4 Division 22 - Plumbing LS 1 43,759.29 Included in Item #5 132,615.00 27,325.14 5 5 Division 23 - Mechanical Packaged, Roof Top Air-Conditioning Units LS 1 159,000.00 313,950.00 437,704.90 351,196.79 6 6 Division 26 - Electrical Identification for Electrical Systems LS 1 41,000.20 26,250.00 143,224.20 45,540.34 7 7 Mobilization/Demobilization (No more than 5% of subtotal of 1-6 above) LS 1 44,500.00 47,849.00 74,508.54 83,078.62
Total Bid 890,000.00 1,307,057.06 1,719,000.00 1,745,000.10
City of Long Beach
Bid Due Date: 7/1/2024 10:00 a.m.
Bid Results for PW-24-454