Archico Design Build Burnett Library Bid Package SIGNED~1_Redacted.pdf

PDF 3 MB Posted

Attached to
R-7234 REBID: Burnett Library Energy Efficiency Upgrade Project 3005010123
Solicitation number
PW-24-454
Issued by
California

About this file

This is a bid package from the City of Long Beach Department of Public Works for the Burnett Library Energy Efficiency Upgrade project (R-7234). The project encompasses selective demolition of roofing, wood division work, thermal and moisture protection including roofing and sheet metal flashing, plumbing, mechanical packaged roof-top air-conditioning units, and electrical identification systems. The bid opening was scheduled for July 1, 2024, at 10:00 a.m. A mandatory pre-bid conference was conducted online via Microsoft Teams on June 13, 2024, at 9:30 a.m., with an in-person job-site walk-through at 560 E Hill Street, Long Beach, California at 11:30 a.m. that same date. The contract is for the City of Long Beach, a municipal corporation in Los Angeles County, California. The base bid total is $1,719,000.00, consisting of seven line items including mobilization/demobilization capped at 5% of the subtotal of items 1-6.

Archico Design Build Inc., a California corporation incorporated on October 13, 2016, submitted the bid as the prime contractor with a certified Small Business (SB) certification number 2011697. The bidder identified five subcontractors: ACCO Engineered Systems for HVAC and mechanical/plumbing work valued at $296,000; W.S. Klem Contractor for framing at $36,700; Best Contracting Services, Inc. for thermal moisture protection roofing at $347,200; Troy's Ornamental Iron Craft, Inc. for miscellaneous metal at $40,000; and Reyes & Sons Electric Co. for electrical work at $50,000. The bidder submitted standard certifications including workers' compensation insurance, non-collusion declaration, debarment and suspension certification, Equal Benefits Ordinance compliance, and Iran Contracting Act compliance. The contractor's average annual construction work value over the past five years was $48,192,157.00, with current work in progress valued at $8,388,888.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDER'S NAME: _Archico Design Build Inc.

ITEM

NO.

ITEM DESCRIPTION

ESTIMATED

QUANTITY

UNIT

UNIT PRICE

(IN

FIGURES)

ITEM

TOTAL

(IN

FIGURES)

1. Division 2 – Existing

Conditions

Selective Demolition -

Roofing

1 LS $100,267.36 $100,267.36

2. Division 6 – Wood 1 LS $171,000.00 $171,000.00

3. Division 7 – Thermal and

Moisture Protection

Roofing, Sheet Metal

Flashing

1 LS $659,680.00 $659,680.00

4. Division 22 - Plumbing 1 LS $132,615.00 $132,615.00

5. Division 23 – Mechanical

Packaged, Roof Top Air-

Conditioning Units

1 LS $437,704.90 $437,704.90

6. Division 26 – Electrical

Identification for Electrical

Systems

1 LS $143,224.20 $143,224.20

7. Mobilization/Demobilizati on (No more than 5% of subtotal of 1-6 above)

1 LS $74,508.54 $74,508.54

Department of Public Works R-7234

City of Long Beach

BID TO THE CITY OF LONG BEACH

BASE BID – BURNETT LIBRARY ENERGENCY EFFIENCY UPGRADE

BURNETT LIBRARY ENERGY EFFICIENCY UPGRADE

BASE BID TOTAL $1,719,000.00

DO NOT SUBMIT THIS FORM AS YOUR BID. BIDS ARE TO BE SUBMITTED

ELECTRONICALLY AS DESCRIBED IN DIVISION B.

In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to be opened on July 1st, 2024, at 10:00 a.m., we offer to furnish all necessary labor, tools, materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting

Bids, in full compliance with Plans (Drawings Set No. B-4803) and Specifications No.

3005010123 (R-7234) at the prices listed below.

We certify that we have examined the site and that the Bid is complete. By signing the Bid, we certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.

The base bid total shall be used for determining the lowest bidder.

Division C - Bid DocumentsC-1

ACCO Engineered Systems HVAC

215 McCormick Ave.

Costa Mesa, CA

(949)205-9511

Mechanical / Plumbing

296,000.00

1000000546

Framing

36,700.00

W.S. Klem Contractor

5405 E. La Palma Ave.

Anaheim, CA

(310)414-0455

735376 1000009829

Best Contracting Services, Inc. Thermal Moisture Protection Roofing

347,200.00

19027 Shamilton Ave.

Gardena, CA 90248

456263

(310)308-6969

120696

Troy's Ornamental Iron Craft, Inc.

Stanton, CA

(949)587-9604

945177

Misc. Metal

40,000.00

1000412581

8150 Eletric Ave.

Reyes & Sons Electric Co.

12939 Arroyo St.

Sylmar, CA 91342

817091

(8158)365-2030

Electrical

50,000.00

1000003506

3. FINANCIAL RESOURCES

3.1 In the past five years, has a bonding company completed a contract on your behalf, or paid for completion because your firm was terminated or found in default? ________________________________________________________

4. EXPERIENCE

4.1 List classifications of work your organization typically performs with its own forces.

4.2 Claims and Suits (If the answer to any of the questions below is yes, please attach specifics.)

4.2.1 Has your organization ever failed to complete any work awarded to it?

4.2.2 Are there any judgments, claims, suits or arbitration proceedings pending against your organization or its officers within the last five (5) years, or such actions related to labor compliance, prevailing wages, or the Department of Industrial Relations within said period?

4.2.3 Has your organization filed any law suits or requested arbitration related to construction within the last five (5) years?

4.3 Has your firm, or any firm with which any of your company’s owners, officers, partners, or employees was associated, been debarred from bidding on, accepting, or performing any government agency or public works project(s), either as a prime contractor or subcontractor? ___________________________________________________

4.4 On a separate sheet, list major construction projects your organization has in progress.

Indicate name of the project, project description, Contract amount, owner, architect/engineer, percent complete and scheduled completion.

4.4.1 Indicate total value of work in progress and under Contract:

4.5 On a separate sheet, list all projects your organization has completed in the past five years. Indicate name of project, project description, Contract amount, owner, owner's phone number, project manager, completion date, and percentage of the cost of the work performed with your own forces. (’None’, ‘N/A’ or its equivalent is not an acceptable response and will be a basis for disqualifying your bid as non-responsive.)

4.5.1 Indicate average annual value of construction work performed during the past five years:

No

No

No

No

No

Construction Management, Labor, Purchasing

Please see attached

Please see attached

$8,388,888

$48,192,157.00

Archico Design Build Inc In Progree Project List

Project Name

Project Description

Contract Amount Including

Change Orders

Owner Architect Engineer

Complete

Scheduled Completion

Collection Yard Relocation and Warehouse Demolition

New Collections Yard Building and Warehouse Demolition including utilities

6,500,000.00$ Orange County Sanitation District

(OCSAN)

Project Line Technical Services

60% 9/21/2024

El Segundo Unified School District District Office Site Work

Alterations to xisting parking lot walkways including sloped walks covered walkways and ramps and irectional signage

1,888,888.00$ El Segundo USD PBK Architects 1% 9/26/2024

Project References

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Liquidated Damages or Back Charges:

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

YesDSA Project:

General Contractor

2010 N Tustin Ave Santa Ana CA 92705

Katella Range Facility Upgrade

1900 W Katella Ave, Orange Ca 92867

County of Orange - Orange County Sheriff Department

Robert Bingham

949-251-0702 Rbingham@joagroup.com

Demolition of existing outdoor shooting range and build a new fully enclosed shooting range, relocate the existing kennel enclosure, and add new shooting range storage rooms along the North and South walls. Interior work in Existing building to include relocation of existing lobby counter, 2 storage access vestibules, conversion of storage to new weapons cleaning room and addition of small employee break room.

New Building

7,146,000.00

HMC Architects - Steven Kiss

630-730-8355 steven.kiss@hmcarchitects.com

18015

JOA Group - Bob Bingham

949-378-2014

8/22/2023

10,983,245.31 rbingham@joagroup.com

Djan Chandra

949-250-1421 dchandra@leightongroup.com

X

4/27/2022 adjusted to 8/28/2023 with added scopes

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

DSA Project:

General Contractor

2010 N Tustin Ave Santa Ana CA 92705

Lincoln Middle School HVAC Project

1501 California Ave Santa Monica CA 90403

Santa Monica Malibu Unified School District

7,844,000.00

Building Modernization School modernization including HVAC, electrical and plumbing improvements, replacement of campus wide fire alarm system & all other associated improvements per construction documents

Gafcon Inc - Eric Brooks

Rachlin Partners - Rudy Monico

310-204-3400 rmonico@rachlinpartners.com

21.05.SMS

9/17/2022

X Yes

Matt Rafi mattael2021@gmail.com

Final Contract Amount: 92%

Liquidated Damages or Back Charges:

310-980-2217

9,261,968.78

8/12/2022

Kevin Klaus

310-279-3008 kklaus@smmusd.org

818-749-5577 ebrooks06@gmail.com

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Original Final Completion Date:

Scope of Work:

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

Liquidated Damages or Back Charges:

C56872C1142

Josie Mellen

213-922-1105 mellenj@metro.net

818-484-4446 famelegacy@famelegacy.com

626-405-8001

435 E 208th Street Long Beach CA 90810 & 14724 Aviation Blvd Lawndale CA 90260

Robert Fahim

Design Build Roofing & HVAC Project - Provide the architectural, structural, electrical, and mechanical design and construction services for roof and HVAC replacement at LA Metro divisions 11 and divisions 22.The scope of work includes asbestos abatement, demolition, install new insulation underneath a new thermoplastic polyolefin roofing membrane (TPO) sheet roofing system. Also included Installation of all new mechanical, electrical, and plumbing items, and control system. Install new fall protection devices around all new replacement skylights, new permanent parapet guard railings and surface mounted access ladders.

8/14/2020 with added scope adjusted to 12/11/2021

Original Contract Amount Awarded: $6,381,000.00

Final Contract Amount: 8,390,744.00

213-922-4797

12/10/2021

X

XDSA Project: Yes

Metro Divisions 11 and 22 Roof Replacement

Los Angeles County Metropolitan Transportation Authority (LACMTA)

Onyx Architiect Steve Kuchenski

Raul Pedroza skuchenski@onyxarchitects.com

PedrozaR@metro.net

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Liquidated Damages or Back Charges:

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

DSA Project:

General Contractor

21.18.SMS

2010 N Tustin Ave Santa Ana CA 92705

Lincoln Middle School Building G & K Modernization

1501 California Ave Santa Monica CA 90403

Santa Monica Malibu Unified School District

Rachlin Partners - Rudy Monico

310-204-3400 rmonico@rachlinpartners.com

Tenant Improvement Building G - 1 story classroom building, replace, flooring window, paint walls, replace doors, replace ceiling tiles.

Building K - 2 story building renovation on 1st floor only, replace, flooring window, paint walls, replace doors, replace ceiling tiles, remove & replace gutters, remodel storage rooms 311B & 314A, remodel classroom 312 to add breakout room, remodel Janitor 314B to staff accessible toilet, additional special needs shower in room 314D

9/7/2021

8/7/2021

499,000.00

Yes

Chris Emmett cemmett@smmusd.org mattael2021@gmail.com

Matt Rafi

548,500.00

310-980-2217

310-450-8338

Kevin Klaus

310-279-3008 kklaus@smmusd.org

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Construction Manager :

Project Description:

Original Final Completion Date:

Scope of Work:

Liquidated Damages or Back Charges:

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

F793

Katella Avenue Widening Of the Fourth Eastbound Lane Adjacent to the Convention Center to Hotel Way

Katella Avenue, From 922' east of Disneyland Drive to Hotel Way in Anaheim, California

City of Anaheim

Joel Jordan

714-231-8368 jjordan@anaheim.net

Joel Jordan

714-231-8368 jjordan@anaheim.net

4/31/2021

Original Contract Amount Awarded:

Final Contract Amount:

2,149,649.00

Actual Final Completion Date: 4/31/2021

Tim Flint

X

949-254-7954 tflint@ghirardelliassoc.com

Road Expansion - Widening and constructing an additional travel lane and bus turnout along the convention center frontage removal and reconstruction of curb and gutter, fixed, lighted, and retractable bollards, landscaped parkway with trees, concrete sidewalk, concrete pavers, driveway, streetlights, replacement of traffic striping to accommodate the additional travel lane, two fiber optic connected changeable message signs in the median, modifications to a motorized gate and all additional work necessary to properly construct the proposed improvements

2,358,335.57

X

Joe Buckner

949-428-1500 jbuckner@ardurra.com

YesDSA Project:

4/30/2021

4/30/2021

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

04-119162

Walker Elementary School Interim Housing Project

811 E Bishop Street Santa Ana CA 92701

Santa Ana Unified School District

Jeremy Cogan

714-480-5359 jeremy.cogan@sausd.us

Morrissey Associates Inc / Tom Morrissey

714-836-6137 tmorrissey@morrisseyal.com

Tilden-Coil Constructors / David Joseph

909-376-1462 DJoseph@tilden-coil.com

7/24/2020

7/24/2020

823,625.00

Bill Priest

714-812-4859 wmpriest@att.net

Final Contract Amount:

Liquidated Damages or Back Charges:

DSA Project:

Site prep for installation of new modular classrooms & restroom, along with all associated utilities & related site work.

Site Improvements & Utility Relocation

864,015.69

Reference Letter Attached

Yes

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Liquidated Damages or Back Charges:

DSA Project:

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

$1,237,253.00

1,331,092.25

5/15/2020

6/2/2020

Steel Materials Storage Structure at Prima Deshecha Landfill

MA-299-19011462

949-728-3042

Ryan Wilson

909-655-3209 ryan.wilson@tetratech.com

562-243-2125 hal.arbogast@tetratech.com

The project is to design and install a new pre-engineered storage building (8,000 sq ft.). The scope of work includes clearing, grubbing, excavation, unclassified fill, asphalt concrete (AC) paving, striping, stenciling, signage, building permitting and construction including a building protection system, building foundations, pre-engineered metal storage building design, permitting and installation of a fire suppression system, electrical and firewater supply, drainage improvements.

New Pre-Fabricated Metal Building & Sitework Construction

909-860-7777

Tetra Tech - Hal Arbogast

Yes

X

X

32250 Avenida La Pata Ave San Juan Capistrano CA 92675

County of Orange

Tetra Tech Bas info@tetratech.com

Kevin Oxford kevin.oxford@ocwr.ocgov.com

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

Woodworth-Monroe TK5 Modular Classroom Project

10711 S 10th Ave Inglewood CA 90301

Inglewood Unified School District

Steven Ross

909-331-8258 sross@cordobacorp.com

Lionakis - Steven Kendrick

949-955-1919 steven.kendrick@lionakis.com

Steven Ross

909-331-8258 sross@cordobacorp.com

1/15/2020

1/5/2020

5,989,000.00

6,144,960.03

XLiquidated Damages or Back Charges:

DSA Project:

C18.19.046

Galil Tadros

818-486-7907 galilt@aol.com

Installation of concrete foundations for (4) modular that will house classrooms, resource rooms, workrooms, custodial room, restrooms, and IDF., new utility lines, new parking lot, hardscape and landscape. Work will also be coordinated with installation of PC approved shade structures and play structures.

Site Improvements & Underground Utilities

X Yes

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Liquidated Damages or Back Charges:

DSA Project:

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

1,738,000.00

9/19/2019 with CO to 1/5/2020

12/30/2019

X

X

Woodcrest Park Renovation

440 W Orangethorpe Ave Fullerton CA 92832

54023

City of Fullerton

David Grantham

714-738-6853 david.grantham@cityoffullerton.com

BGB Design Group - Art Guy

714-545-2898 art@bgb-inc.com

David Grantham

714-738-6853 david.grantham@cityoffullerton.com

Elias Capelle ecapelle@ci.fullerton.ca.us657-248-5141

1,976,795.88

Park Renovation - Various renovated and new park improvements, including demolition of existing restroom, total lot area, selected walkways and fencing, selected picnic tables and planters, clearing and grubbing of all specified turf and landscape material, and hauling and disposing of all demolished materials. New work shall include miscellaneous concrete installation, new restroom, exercise area and equipment installation, play areas and equipment installation, basketball courts, benches, picnic tables, shade structures, masonry planters and low walls, “urban street scene” [road pavement refurbishment, skateboard elements, painted street graphics, fencing, decomposed granite surfacing, landscaping, irrigation, lighting, and all related work shown on plans.

Yes

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Construction Manager :

Liquidated Damages or Back Charges:

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

TVUSD District Office Conference Center Renovation

31350 Rancho Vista Road Temecula, CA 92592

Temecula Valley Unified School District

Janet Dixon

951-676-2661 jdixon@tvusd.us

MGPA Architecture, Inc Fred Gualda

760-473-9809 fgualda@mgpaia.com

Janet Dixon

951-676-2661 jdixon@tvusd.us

$1,385,000.00

Actual Final Completion Date: 2/8/2019

2/8/2019

2018-19-101

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

KT Services _ Kevin Lastrapes

626-523-5574

1,523,498.34

DSA Project:

kls12inspect@yahoo.com

Renovations and Upgrades for the District Conference Center / Board Room at the main district offices including replacement of ceilings, flooring, miscellaneous architectural upgrades, HVAC upgrades, folding partition walls, electrical, audio/visual equipment, and new ADA flatwork path-of-travel from street.

Tenant Improvement

YesX

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Liquidated Damages or Back Charges:

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Palm Springs Fire Station #4 Remodel and Expansion

1300 S Laverne Way, Palm Springs CA 92264

City of Palm Springs

Marcus Fuller

Marcus.Fuller@palmspringsca.gov760-323-8202

Marcus Fuller

760-323-8202 Marcus.Fuller@palmspringsca.gov

Marcus.Fuller@palmspringsca.gov760-323-8202

Work includes the renovation of the existing building to the Gym, Lockers and contamination area and building approximately 3,000 SF of new Fire station and all new site work and landscaping.

New Building & Tenant Improvements

$4,149,446.78

3/28/2019

4/16/2019

$3,975,000.00

X

X

1835 W. Orangewood Ave. Orange, CA 92868

General Contractor

CP 15-25

DSA Project:

760-323-8202 Marcus.Fuller@palmspringsca.gov

Marcus Fuller

Marcus Fuller

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Liquidated Damages or Back Charges:

DSA Project:

GF339

General Contractor

2372 Morse Ave #307, Irvine, CA 92614

Fountain Valley Recreation Center Exterior Improvement

16400 Brookhurst St, Fountain Valley, CA 92708

City of Fountain Valley

Temo Galvez

Meyer and Associates

949-380-7016 None

John Wolitarsky 310-359-1203 949-339-9154 jwolitarsky@ardurra.com

Building Renovation

Remodel improvements to the exterior of the existing recreational center facility including replacement of the main entrance concrete slab and stucco, replacement of the doors, hardware, storefronts, curtain walls. Replacing sheet metal roof and painting the entire exterior of the building.

11/7/2018

11/7/2018

$ 599,599.00

$ 659,558.00

X

X temo.galvez@fountainvalley.org714-593-4517

Enedino Arroyos

760-792-8152 D-arroyos@hotmail.com

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

1133-18

General Contractor

1835 W. Orangewood Ave. Suite 325 Orange, CA 92868

Manhattan Beach Pier Utilities and Roundhouse Exterior Improvements

1 Manhattan Beach Blvd, Manhattan Beach, CA 90266

City of Manhattan Beach

Gilbert Gamboa

310-802-5356 ggamboa@citymb.info ggamboa@citymb.info

310-802-5356

Gilbert Gamboa

Nonzero Architecture - Peter Grueneisen peterg@nonzeroarch.com310-313-1000

Building and Utilities Renovation on a Landmark

Removal and replacement of pier utility runs. Installation of new life ring cabinets, emergency call box and fish cleaning sinks to pier deck. Rehabilitation and renovation of roundhouse building exterior.

05/29/2018

05/16/2018

$ 1,692,975.00

$ 1,862,431.41

X

X

Liquidated Damages or Back Charges:

DSA Project:

Fariba Yazdi

310-808-7409 fyazdi@thequantumconsulting.com

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Werle Building Tenant Improvement

CIP 55-15/16-02

General Contractor

2372 Morse Ave #307, Irvine, CA 92614

626 N. Robertson Blvd West Hollywood, CA 90069

City of West Hollywood

Helen Collins

323-848-6895 Hcollins@weho.org

IDS Group - John Silber

949-387-8500 john.silber@idsgi.com

Helen Collins

323-848-6895 hcollins@weho.org

Tenant improvement of a 6,000 SF two-story building with addition of two-story meeting room and office area. We have seismic reinforced the entire existing building while maintaining the historic façade of the building without any damages. We have added an elevator to the building to bring it up to ADA codes and requirement. The project also included replacing entire mechanical, electrical and plumbing system and adding a security access control system, replacing the roof to comply with new TITLE 24 requirement and remodeling the entire building interiors. The exterior hardscape has also been remodeled and an entry canopy and a building signage monument to the building has been added.

Tenant Improvement & Addition

$ 2,418,000.00

8/15/17 with CO to 10/5/2017

9/27/17

$3,332,240.26

X

X

Liquidated Damages or Back Charges:

DSA Project:

Murray Armstrong

323-848-6872 marmstrong@weho.org

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Chino II Desalter Phase 3 Expansion, Pre-Engineered metal Storage Building

CDAEXP3-13-12

General Contractor

2372 Morse Ave #307, Irvine, CA 92614

11251 Harrel St. Jurupa Valley, CA 91752

Chino Basin Desalter Authority

Vlad Burce

Vburce@butier.com949-375-1611

$ 949,000.00

$ 981,160.80

Tetra Tech - Ken Berard ken.berard@tetratech.com

Vlad Burce

949-375-1611 Vburce@butier.com

New Metal Building and Site Work

6/30/2017

6/30/2017

X

X

Design build a new metal storage building including earthwork, foundation and slab, new metal building, electrical, plumbing, HVAC, and underground utility.

Liquidated Damages or Back Charges:

DSA Project:

626-351-4664 909-305-2939

Kenneth Stiles

909-721-4865 kstiles@butier.com

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Euclid & Sunkist Branch Library Renovation

1340 Euclid St, Anaheim, CA 92802 & 901 S. Sunkist St, Anaheim, CA 92806

City of Anaheim

Tasneem Watts

714-765-3625

Group 4 Architecture Gary Ching

650-871-0709 gching@g4arch.com

Tasneem Watts

714-765-3625

9/16/2016

8/20/2016

$ 999,999.00

$1,099,434.00

X

X

15460-01

General Contractor

2372 Morse Ave #307, Irvine, CA 92614

Liquidated Damages or Back Charges:

DSA Project:

P. John

714-765-5153 None

Building Remodel - Sunkist Library: Paint, Carpet , Limited Door Upgrade Replacement of Luminous Ceiling Lense, Acoustic Ceiling Tiles Interior Book Return, Wayfinding Signes Partitions Relocating existing power poles and associated conduits structural mechanical plumbing lighting electrical.

Euclid Library: Interior Renovation of the Existing Euclid Branch Library includes the renovation of restrooms, drinking fountains code upgrades interior book return interior windows replacing luminous ceiling lenses acoustic celing tiles in the public areas interior finishes and metal shelving.

Site work to renovating the accessible parking spaces and walkways to meet current code.

twatts@anaheim.net twatts@anaheim.net

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Liquidated Damages or Back Charges:

DSA Project:

590-412-3131-9605

General Contractor

2372 Morse Ave, Ste 307 Irvine, CA 92614

400 E. Vermont Ave, Anaheim, CA 92804

Crew Quarters Rehabilitation for Public Work Operations

City of Anaheim

Dan Debassio

562-879-3602 ddebassio@anaheim.net

Border Architect

949-851-1317 info@bordersarchitects.com

Tim Flint

949-254-7954 tflint@ghirardelliassoc.com

City of Anaheim Crew Quarters Locker & Restroom complete renovation including demolition of the existing restroom lockers and building a new ADA bathroom and locker and painting the entire building interiors.

Tenant Improvement

$283,570.00

$310,156.90

08/31/2015

8/20/2015

X

X

Terry Alford

714-765-5153 talford@anaheim.net

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Scope of Work:

Liquidated Damages or Back Charges:

DSA Project:

Material Canopy at Garden Grove Municipal Service Center

5-1124-A

General Contractor

2372 Morse Ave, Ste 307 Irvine, CA 92614

13802 New hope St, Garden Grove, CA 92843

City of Garden Grove

Les Ruitenschild

714-741-5348 lesr@ci.garden-grove.ca.us

$294,600.00

$313,260.00

05/12/2015Original Final Completion Date:

Actual Final Completion Date: 5/5/2015

X

X

Building a new metal canopy over the existing material storage for the city operation yard including foundation and lighting.

New Pre-Fabricated Metal Canopy & Site Work

F Earl Mellot & Associates-Architects - Earl Mellot

714-741-5348 foremellott@sbcglobal.net

Les Ruitenschild

714-741-5348 lesr@ci.garden-grove.ca.us

Daniel Windham

714-741-5339 None

Project # :

Performed as:

Office Location:

Project Name:

Project Location:

Owner:

Phone: Email:

Phone: Email:

Phone: Email:

Phone: Email:

Yes No

No

Architect / Engineer:

Owner Contact Name:

Inspector Of Record:

Actual Final Completion Date:

Construction Manager :

Project Description:

Final Contract Amount:

Original Contract Amount Awarded:

Original Final Completion Date:

Scope of Work:

Fire Station #1 Training Tower Retrofit

General Contractor

2372 Morse Ave, Ste 307 Irvine, CA 92614

555 N. Berry Street, Brea, CA 92821

City of Brea

Michael Ho

714-990-7691 michaelh@ci.brea.ca.us

Pac Rim Engineering Gilbert Guevara

714-683-0470 gguevara@pacrimengineering.com

Michael Ho

714-990-7691 michaelh@ci.brea.ca.us

Retrofit Brea Fire station No.1 training tower including replacing the second-floor concrete slab and reinforcement. Replacing of the existing wood staircase with new stainless-steel stair way.

Tenant Improvement

$206,756.00

9/17/2014

08/17/2014

$184,025.00

X

X

Liquidated Damages or Back Charges:

DSA Project:

Jim Brodhag

714-671-4460 jimbr@cityofbrea.net

5. MINIMUM QUALIFICATIONS

5.1 The minimum acceptable experience to be qualified for this project is as follows:

5.1.1 The Contractor must have completed at least one (1) project of similar scope to this project with a minimum value of $500,000, within the last five calendar years (from the date of the bid opening) and for a public agency. For a project to be qualified as having a similar scope, it should include at least one major type of related improvements: HVAC replacement

5.2 List project(s) to satisfy minimum qualifications noted above. ’None’, ‘N/A’ or its equivalent is not an acceptable response and will be a basis for disqualifying your bid as non-responsive.:

Project Name:

Agency/Owner:

Project Manager:

Phone Number:

Contract Amount:

Scope of Work:

Name of Project:

Project Manager:

Phone Number:

Name of Project:

Project Manager:

Phone Number:

Katella Range Facility Upgrade County of Orange-Orange County Sheriff Dept.

Robert Bingham (949)251-0702

Demo of existing outdoor shooting range storage room along the north & south walls. Interior work in existing building- relocation of existing lobby counter, 2 storage access vestibules, conversion of storage to new weapons, cleaning room, and addition of small employee break room.

Lincoln Middle School HVAC Santa Monica Malibu Unified School District Kevin Klaus (310)279-3008

School modernization including HVAC, electrical, and plumbing improvements, replacement of campus wide fire alarm system & all other associated improvements per construction documents.

Metro Division 11 and 22 Roof Replacement

LACMTA

Josie Mellen (213)922-1105

Design build roofing & HVAC project - Provide the architectural, structural, electrical, and mechanical design and construction services for roof and HVAC replacement at LA Metro divisions 11 and 22.

$10,983,245.31

$9,261,968.78

$8,390,744.00

File details come from the government source that posted it. Updated .