Building AS4109 ACM Report.pdf

PDF 27 KB Posted

Attached to
Multiple Building Flooring Repairs
Solicitation number
N4008525R9019
Issued by

About this file

This is an Asbestos Inspection Report for Building #AS4109 at MCB Camp Lejeune, dated January 19, 2024. The report indicates that the building has a hazard ranking of 0-RI 06 and is marked for demolition. No friable or non-friable asbestos-containing materials (ACM) were found in the database for this building. The report emphasizes key health and safety guidelines, including that ACM only presents a health hazard when asbestos fibers are airborne and inhaled, and instructs personnel to avoid disturbing any materials. The Camp Lejeune Asbestos Program Manager (contact number: 910-451-5837) maintains a survey copy for the building and will conduct periodic inspections to evaluate the condition of any potential asbestos-containing materials.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS INSPECTION REPORT of:

Building # AS4109

MCB CAMP LEJEUNE

Friday, January 19, 2024

Print Date

Friday, January 19, 2024 Page 1 of 4Print Date:

INSPECTION SUMMARY

BLDG #:

OCCUPANT:

YEAR BUILT:

BUILDING COMMENTS:

AS4109

HAZARD RANKING 0- RI 06-BUILDING DEMOLISHED

ASBESTOS MANAGER: 910-451-5837

Friable ACM(s) identified

Non-friable ACM(s) identified

Tested Non ACM or REMOVED Materials

DESCRIPTION LOCATION Date

ACM only presents a health hazard when asbestos fibers are airborne and inhaled.

Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.

HEALTH ASPECTS:

Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.

CONDITIONS TO AVOID:

Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos

Program Manager.

REPORTS OF DAMAGE:

Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:

ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

RECORDKEEPING:

NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

No non friable ACM records found in database

No non ACM records found in database

NOTIFICATION OF ACM IN BUILDING

Friday, January 19, 2024 Page 2 of 4Print Date:

The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.

CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837

Friday, January 19, 2024 Page 3 of 4Print Date:

SAMPLES COLLECTED

NO RECORDS AVAILABLE

Friday, January 19, 2024 Page 4 of 4Print Date: