Building AS4109 ACM Report.pdf
PDF 27 KB Posted
- Attached to
- Multiple Building Flooring Repairs
- Solicitation number
- N4008525R9019
About this file
This is an Asbestos Inspection Report for Building #AS4109 at MCB Camp Lejeune, dated January 19, 2024. The report indicates that the building has a hazard ranking of 0-RI 06 and is marked for demolition. No friable or non-friable asbestos-containing materials (ACM) were found in the database for this building. The report emphasizes key health and safety guidelines, including that ACM only presents a health hazard when asbestos fibers are airborne and inhaled, and instructs personnel to avoid disturbing any materials. The Camp Lejeune Asbestos Program Manager (contact number: 910-451-5837) maintains a survey copy for the building and will conduct periodic inspections to evaluate the condition of any potential asbestos-containing materials.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS INSPECTION REPORT of:
Building # AS4109
MCB CAMP LEJEUNE
Friday, January 19, 2024
Print Date
Friday, January 19, 2024 Page 1 of 4Print Date:
INSPECTION SUMMARY
BLDG #:
OCCUPANT:
YEAR BUILT:
BUILDING COMMENTS:
AS4109
HAZARD RANKING 0- RI 06-BUILDING DEMOLISHED
ASBESTOS MANAGER: 910-451-5837
Friable ACM(s) identified
Non-friable ACM(s) identified
Tested Non ACM or REMOVED Materials
DESCRIPTION LOCATION Date
ACM only presents a health hazard when asbestos fibers are airborne and inhaled.
Avoid disturbance which will release fibers. The presence of asbestos does not constitute a health hazard.
HEALTH ASPECTS:
Do not disturb or cause damage to ACM. Do not sand, grind or abrade materials or cause damage with any type of equipment.
CONDITIONS TO AVOID:
Report any damage, dust or debris that may come from ACM or suspect ACM, or any change in the condition of materials, or accidental disturbance to the Asbestos
Program Manager.
REPORTS OF DAMAGE:
Corrective action initiated to minimize fiber release and protect personnel. RESPONSE ACTION:
ACM will be inspected periodically to evaluate any changes in condition.INSPECTION:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
RECORDKEEPING:
NOTICE: The following asbestos-containing materials have been identified in this structure. Refer to survey findings for additional information or contact the Asbestos Program Manager. Please note ACM that is intact and undisturbed is not considered a significant health hazard to building occupants.
DESCRIPTION LOCATION Date Quantity
DESCRIPTION LOCATION Date Quantity
No friable ACM records found in database
No non friable ACM records found in database
No non ACM records found in database
NOTIFICATION OF ACM IN BUILDING
Friday, January 19, 2024 Page 2 of 4Print Date:
The Camp Lejeune Asbestos Program Manager maintains a copy of the survey for the building.
CAMP LEJEUNE Asbestos Program Manager: Phone: (910) 451-5837
Friday, January 19, 2024 Page 3 of 4Print Date:
SAMPLES COLLECTED
NO RECORDS AVAILABLE
Friday, January 19, 2024 Page 4 of 4Print Date:
File details come from the government source that posted it. Updated .