Bristol_HVAC_LayOut.pdf
PDF 423 KB Posted
- Attached to
- RIARNG Bristol Armory HVAC
- Solicitation number
- RFQ26006658
- Issued by
- Bristol County, Rhode Island
About this file
This is an HVAC mechanical systems layout drawing for the Bristol Armory located at 470 Metacom Avenue, Bristol, Rhode Island, prepared for the Rhode Island Army National Guard (RIARNG) Construction and Facilities Management Office. The drawing, dated June 2, 2025, depicts the first floor plan for new HVAC work associated with Project #44190 and illustrates the installation of a cooling-dominant, inverter-driven, air-source heat pump system throughout the facility. The plan indicates multiple demand-controlled outdoor air systems (DOAS-1 through DOAS-4) serving the main hall, west, north, and south zones, along with variable air volume (VAV) boxes, supply air (SA) and return air (RA) ductwork, and various sized ducts ranging from 6x6 inches to 56x34 inches. Equipment tonnages specified across the layout range from 0.25 ton to 6 ton outdoor units, with a non-mandatory pre-bid conference scheduled for Friday, May 29, 2026, at 10:00 am at the project site. The drawing was prepared by H.F. Lenz Company consulting firm and issued for bidding as of June 2, 2025, with bid alternates #1 and #2 identified on the plan.
The design coordinates new mechanical systems with existing building systems and utilities while providing electrical code-required access in front of electrical power feeds to VAV boxes and adjusting ductwork routes to avoid significant existing utility rerouting. The project encompasses HVAC upgrades across multiple building spaces including offices, classrooms, weight room, assembly hall, kitchen, recreation areas, latrines, storage, maintenance areas, and locker rooms. Complete specifications, technical requirements, and bidding documents are available through the state's WebProcure system, with vendors able to access the full solicitation through their accounts or by downloading materials from the public bid board.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VendorChangeDetailsReport_RFQ26006658_v4_Jul_22_26.pdf | ||
| RFQ26006658 Questions and Answers - final 07-22-2026.xlsx | XLSX spreadsheet | |
| RFQ26006658 Amendment 4 dated 07-22-2026.docx | DOCX document | |
| RFQ26006658_Bristol_HVAC.pdf | ||
| RFQ26006658_May_22_26_solicitation_doc.pdf | ||
| RFQ26006658_Aug_3_26_solicitation_doc.pdf | ||
| RFQ26006658 Amendment 2 dated 06-17-2026.docx | DOCX document | |
| Screenshot 2026-07-17_BristolArmory_480_277_MSB1.png | PNG image | |
| RFQ26006658_May_29_26_solicitation_doc.pdf | ||
| RFQ26006658 Amendment 3 dated 07-03-2026.docx | DOCX document | |
| RFQ26006658 Amendment 1 dated 05-29-2026.docx | DOCX document | |
| RFQ26006658_Jul_20_26_solicitation_doc.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6
DOAS-1
MAIN HALL
DOAS-2
WEST
DOAS-3
NORTH
DOAS-4
SOUTH
LOCKER
VAULT
STORAGE
STORAGE
OFFICE
OFFICE
OFFICE
COMPUTER
WEIGHT
ROOM
OFFICE
LOCKER
LOCKER
LOCKER
1011 MAINT
MAINT
ASSEMBLY
HALL
OFFICE
CONFERENCE
CLASSROOM
RECREATION
KITCHEN
OFFICE
STORAGE
MECH
WOMENS'
LATRINE
MENS'
LATRINE
LATRINE
STORAGE
ENTRY
ENTRY
CORRIDOR
56 x 34 SA
V12
1310 CFM
V8
550 CFM
V12
990 CFM
V14
1465 CFM
V5
255 CFM
V8
500 CFM
V5
165 CFM
V12
1050 CFM
V10
875 CFM
V10
875 CFM
V10
825 CFM
V10
780 CFM
V8
620 CFM
26 x 10 RA
12 x 8 RA
20 x 10 RA
20 x 10 SA x
S
A
12 x 8 SA 8 x 8 SA
8 x 8 SA x
S
A
18 x 8 SA
12 x 8 SA
8 x 8 SA 14 x 8 SA
10 x 8 SA
6 x 6 SA
14 x 8 SA x
S
A
20 x 10 SA
8 x 8 SA x
SA
SD-7
1605 CFM
SD-7
1605 CFM
SD-7
1605 CFM
SD-7
1610 CFM
SD-7
1610 CFM
SD-7
1610 CFM
x
SA
T 26 x
SA
T T TT
T
T
T
T
T
T
T
TT
x
R A
V6
370 CFM
V12
970 CFM
SD-2
210 CFM
SD-2
210 CFM
SD-2
215 CFM
SD-2
145 CFM
SD-1
90 CFM
SD-5
530 CFM
SD-5
525 CFM
SD-5
525 CFM
SD-6
875 CFM
SD-6
875 CFM
SD-6
825 CFM
SD-6
990 CFM
SD-5
550 CFM
SD-1
130 CFM
SD-6
840 CFM
SD-4
370 CFM
SD-2
165 CFM
SD-5
500 CFM
SD-3
255 CFM
SD-5
440 CFM
SD-5
435 CFM
SD-4
335 CFM
RG-4
530 CFM
RG-1
90 CFM
RG-2
210 CFM
RG-2
210 CFM
RG-2
215 CFM
RG-1
145 CFM
RG-4
525 CFM
RG-4
525 CFM
RG-2
165 CFM
RG-4
500 CFM
RG-2
255 CFM
RG-7
975 CFM
RG-3
335 CFM
RG-7
990 CFM
RG-4
550 CFM
RG-7
825 CFM
RG-7
875 CFM
RG-7
875 CFM
RG-1
130 CFM
RG-7
840 CFM
RG-3
370 CFM
14 x 8 SA x
S
A x
SA
x
SA
x
SA
12 x 8 SA
SG-1
RG-2
165 CFM
14 x 8 SA
RG-8
RG-8
RG-8
RG-8
RG-8
x
SA
x
SA
x
SA
DSDDSD
1 2
1 2
1 2
1 2 1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2 1 2
NEW WORK NOTES THIS DRAWING:
COORDINATE NEW MECHANICAL SYSTEMS WITH EXISTING-TO-REMAIN BUILDING
SYSTEMS AND UTILITIES. PROVIDE COORDINATED AND COMPLETE BUILDING SYSTEMS
READY FOR THE BENEFICIAL USE OF THE OWNER.
PROVIDE ELECTRICAL CODE-REQUIRED ACCESS IN FRONT OF ELECTRICAL POWER
FEED TO VAV BOX. ADJUST DUCTWORK ROUTE TO AVOID SIGNIFICANT EXISTING
UTILITY RE-ROUTING.
06/02/2025
As Indicated
2024-1907.01
Date
Scale
Proj. Number
Drawing Number
54321
A
B
C
D
E
3"
1/
2"
1"
3/ 4"
1/ 2"
3/ 8"
1/ 4"
1/ 8"
1/
3/
3/
Drawn
Checked
KEYPLAN
Number Date Issued For
RHODE ISLAND ARMY
NATIONAL GUARD
CONSTRUCTION AND
FACILITIES MANAGEMENT
OFFICE
2841 SOUTH COUNTY TRAIL
EAST GREENWICH, RI
02818-1728
0 06/02/2025 ISSUED FOR BIDDING
Consultants:
H.F. Lenz Company 101 Centerpoint Drive, Suite 237 Middletown, CT 06457
P: 203.316.2124 www.hflenz.com
BRISTOL ARMORY
470 METACOM AVE,
BRISTOL, RI
HVAC UPGRADES
PROJECT # 44190
FIRST FLOOR PLAN
NEW WORK
M201
FIRST FLOOR PLAN - HVAC - NEW WORK
SCALE: 1/8" = 1'-0"
BID ALTERNATE #2
BID ALTERNATE #1
pfiejdasz Text Box
1 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.5 TON
OUTDOOR
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
3 TON
OUTDOOR
pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Text Box
1 TON
pfiejdasz Text Box
1 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Line pfiejdasz Text Box
2.5 TON
OUTDOOR
pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Text Box
1 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.25 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.25 TON
pfiejdasz Text Box
0.25 TON
pfiejdasz Text Box
0.75 TON
pfiejdasz Line pfiejdasz Text Box
1 TON
OUTDOOR
pfiejdasz Line pfiejdasz Text Box
2.5 TON
OUTDOOR
pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Text Box
0.75 TON
pfiejdasz Text Box
1 TON
pfiejdasz Text Box
1 TON
pfiejdasz Text Box
2 TON
pfiejdasz Text Box
2 TON
pfiejdasz Text Box
1.5 TON
pfiejdasz Text Box
4 TON
OUTDOOR
pfiejdasz Text Box
3 TON
OUTDOOR
pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Text Box
0.75 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
0.5 TON
pfiejdasz Text Box
6 TON
OUTDOOR
pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Text Box
1 TON
pfiejdasz Text Box
1 TON
pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Line pfiejdasz Text Box
0.25 TON
pfiejdasz Text Box
1 TON
pfiejdasz Text Box
1 TON
pfiejdasz Text Box
2.5 TON
OUTDOOR
pfiejdasz Line pfiejdasz Line pfiejdasz Line
File details come from the government source that posted it. Updated .