Bldg 6 Phase 4_drawings.pdf
PDF 22 MB Posted
- Attached to
- Building Six Phase Four Renovation - Solicitation Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-00007
- Issued by
- Department of the Army National Guard
About this file
This solicitation notice seeks proposals for renovation services at Building Six at Camp Atterbury in Edinburgh, Indiana. The firm fixed-price contract will provide all labor, materials, equipment, and supervision to complete renovations to the West wing on the first and second floors. Scope of work includes selective demolition, new interior walls, plumbing fixtures and piping, bathroom exhaust systems, ceramic and vinyl flooring, door and hardware installation, and surface preparation and finishing. The pre-bid conference is September 9th and the bid opening is September 25th. The contract duration is 270 days from notice to proceed. The project is set aside for small businesses under NAICS code 236220 with a $1-5 million magnitude. Proposals must be submitted through the beta.SAM website and offerors must register with SAM which takes approximately 15 business days.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed bid abstract W912L920B0007.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| Davis Bacon Wages Building Johnson County.pdf | ||
| Solicitation Amendment 2 W912L920B00070002.pdf | ||
| 20200909 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES W912L920B0007.docx | DOCX document | |
| Building 6-PH4 Addendum Questions and responses-Etica.docx | DOCX document | |
| A602 updated - Addendum01.pdf | ||
| Pre-Bid Slides BLDG 6 PH 4 W912L9-20-B-0007 20200909.pdf | ||
| Agenda for Preproposal Conference BLDG 6 PHASE 4 B0007 20200909.pdf | ||
| eCMRAMemo.pdf | ||
| SOLICITATION Amendment 1 W912L9-20-B-0007 BUILDING 6 PHASE 4.pdf | ||
| 006_APNDX-B_CD-REPORT.pdf | ||
| SOLICITATION W912L9-20-B-0007 BUILDING 6 PHASE 4.pdf | ||
| 005_PH 4_AF-66 Submittals_26Feb20.pdf | ||
| 002_Bldg 6 Phase 4_Specifications.pdf | ||
| 004_SOW_B006_PH-IV_26Feb20.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A000
Architect:MEP Engineers:
Enlarged Site Map
Regional Training Institute Building 6, Camp Atterbury Joint Maneuver Training Center (CAJMTC) Edinburgh, IN 46124-5000
(PROJECT SITE)
Vicinity Map - Indiana
Project Title:
Regional Training Institute Building 6 - Phase 4
NN
Camp Atterbury
Northern Indiana Office 409 Broadway St.
New Haven, Indiana 46774 Tel: 260.437.4404 Fax: 317.536.3930
Corporate Office 7172 N. Keystone Ave., Suite G
Indianapolis, Indiana 46240 Tel: 317.466.9520 Fax: 317.536.3930
Camp Atterbury Joint Maneuver Training Center (CAJMTC) Edinburgh, Indiana 46124-5000
April 16, 2020 Construction Documents for Construction
Governor Eric Holcomb, State of Indiana BG R. Dale Lyles, Adjutant General of State of Indiana
COL Felicia Browkaw, Post Commander MAJ Chris Johanningsmeier, Director of Public Works
Mrs. Sheri Herrin, Contracting Specialist
Primary Entrance
Camp Atterbury Map N
COVER
Mr. Jeff Kernodle, Senior Project Manager CPT Gary Huffman, Contracting Officer's Representative
FIRST FLOOR CODE COMPLIANCE PLAN
ARCHITECTURAL SYMBOLS
ARCHITECTURAL ABBREVIATIONS:
MATERIAL INDICATIONS
FLOOR PLAN
ARCHITECTURAL SYMBOLS
GENERAL NOTES:
SHEET INDEX:
EXIT
EXITEXIT
EXIT EXIT
EXIT
EXITEXIT
EXIT
CODE COMPLIANCE NOTES:
GENERAL NOTES:
EXIT
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
G101
INDEX, GENERAL
INFORMATION AND
CODE COMPLIANCE
ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
G102
WORK PHASE PLANS
FIRST FLOOR PHASING PLAN - PHASE 1
BARRACKS BUILDING 6
PHASE 1
PHASE 1 PHASE 1
PHASE 1PHASE 1
PHASE 1
PHASE 5
PHASE 4
PHASE 2
PHASE 3
PHASE 3
PHASES 2, 3, 4 AND 5
SECOND FLOOR PHASING PLAN - PHASE 1
BARRACKS BUILDING 6
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
PHASE 1
SECOND FLOOR PHASING PLAN - PHASES 2, 3, 4 AND 5
BARRACKS BUILDING 6
PHASE 1
FIRST FLOOR PHASING PLAN - PHASES 2, 3, 4 AND 5
BARRACKS BUILDING 6
PHASE 4
PHASE 2
PHASE 3
PHASE 3
PHASE 1
PHASE 5
PHASE 3 PHASE 4PHASE 4
PHASE 2
PHASE 5
PHASE 5 PHASE 3
PHASE 2
PHASE 3
PHASE 4
PHASES 2, 3, 4 AND 5
FIRST FLOOR DEMOLITION AND EXISTING CONDITIONS PLAN LEGEND:
GENERAL NOTES:
KEY NOTES:
ROOM GROUP TYPE A DEMOLITION PLAN
ROOM GROUP TYPE B DEMOLITION PLAN ROOM GROUP TYPE C DEMOLITION PLAN
KEY NOTES:KEY NOTES:
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
AD101
FIRST FLOOR
DEMOLITION AND
EXISTING
CONDITIONS PLAN
SECOND FLOOR DEMOLITION AND EXISTING CONDITIONS PLAN LEGEND:
GENERAL NOTES: KEY NOTES:
ADDITION TO CORRIDOR 1-ND
DEMOLITION RELATED TO
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
AD102
SECOND FLOOR
DEMOLITION AND
EXISTING
CONDITIONS PLAN
FIRST FLOOR PROPOSED FLOOR PLAN
LEGEND:
GENERAL NOTES:
KEY NOTES:
ROOM GROUP TYPE B ENLARGED FLOOR PLAN
ROOM GROUP TYPE A ENLARGED FLOOR PLAN
KEY NOTES:
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A101
FIRST FLOOR
PROPOSED
FLOOR PLAN
SECOND FLOOR PROPOSED FLOOR PLAN LEGEND:
KEY NOTES:
ADDITION TO CORRIDOR 1-ND
KEY NOTES:
ROOM GROUP TYPE C ENLARGED FLOOR PLAN
KEY NOTES:KEY NOTES:
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A102
PROPOSED
FLOOR PLAN
SECOND FLOOR
FIRST FLOOR REFLECTED CEILING PLAN
ROOM GROUP TYPE B REFLECTED CEILING PLAN
ROOM GROUP TYPE A REFLECTED CEILING PLAN
ROOM GROUP TYPE C REFLECTED CEILING PLAN
LEGEND:
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A103
FIRST FLOOR
REFLECTIVE CEILING
PLAN
SECOND FLOOR REFLECTED CEILING PLAN
LEGEND:
ADDITION TO CORRIDOR 1-NDCEILING DETAILCEILING DETAIL
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A104
SECOND FLOOR
REFLECTIVE CEILING
PLAN
ROOF PLAN
LEGEND
KEY NOTES:KEY NOTES:
W/ TIE IN TO EXISTING MODIFIED
TYPICAL EQUIPMENT CURB
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A105
ROOF PLAN
BUILDING 6 SOUTH ELEVATION
KEY NOTES:
BUILDING 6 EAST ELEVATION
BUILDING 6 NORTH ELEVATION
BUILDING 6 WEST ELEVATION
KEY PLAN
GENERAL NOTES:
A201
EXTERIOR
ELEVATIONS
BUILDING
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
BUILDING 6 COURTYARD NORTH ELEVATION
KEY NOTES
BUILDING 6 COURTYARD EAST ELEVATION
BUILDING 6 COURTYARD SOUTH ELEVATION
BUILDING 6 COURTYARD WEST ELEVATION
KEY PLAN
GENERAL NOTES:
A202
COURTYARD
BUILDING
ELEVATIONS
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
TYPICAL WALL SECTION
TYPICAL WALL SECTION AT CORRIDORTYPICAL WALL SECTIONWALL SECTION AT LOBBY 1NA & 2NA
GENERAL NOTES:
PARAPET DETAIL
HEAD DETAIL
SILL DETAIL
HEAD DETAIL
EXISTING
PROPOSED
SILL DETAIL
PROPOSEDEXISTING
KEY NOTES - CONTINUED:
ROOF FLASHING DETAIL
PATCHING DETAIL
TYPICAL JAMB
PATCHING DETAIL
TYPICAL SILL
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A301
AND
WALL SECTIONS
DETAILS
TYP. WALL ELEVATION - RM GROUP ATYP. WALL ELEVATION - RM GROUP BTYP. WALL ELEVATION - RM GROUP CTYP. WALL ELEVATION - RM GROUP C
TYP. WALL ELEVATIONS - ROOM GROUPS A & B
BATHROOM
ABCD
TYP. WALL ELEVATIONS - ROOM GROUP C - ROOMS 185, 187, 101, 103, 102 AND 104
BATHROOMS
ABC
TYPICAL REQUIREMENTS FOR ROOM GROUP C ACCESSORIES
D
TYP. WALL ELEVATIONS - ROOM GROUP C - ROOMS 181 AND 183
BATHROOM
ABCD
ENLARGED PLAN
ROOM GROUP B
ENLARGED PLAN
ROOM GROUP A
ENLARGED PLAN
ROOM GROUP C
MIRRORED ENLARGED PLAN
ROOM GROUP C
ROOM GROUP TYPES "A" & "B"
BATHROOM WALL WITH DOOR AT
TYPICAL:
GENERAL NOTES:
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A401
ELEVATIONS,
RESTROOM
ROOM ELEVATIONS
AND ENLARGED
FLOOR PLANS
GENERAL NOTES:KEY NOTES:
PHASE 1 ROOM FINISH SCHEDULE
B
WALL TYPE SCHEDULE:
ROOM FINISH SCHEDULE
MATERIALS
PHASE 2 ROOM FINISH SCHEDULEPHASE 3 ROOM FINISH SCHEDULE
KEY NOTES:
A
WALL TYPE SCHEDULE:
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A601
SCHEDULES FOR
ROOM FINISH
PHASES 1, 2 AND 3
GENERAL NOTES:KEY NOTES:
ROOM FINISH SCHEDULE
MATERIALS
PHASE 4 ROOM FINISH SCHEDULEPHASE 5 ROOM FINISH SCHEDULE
KEY NOTES:KEY NOTES:KEY NOTES:
HEAD DETAIL
GYPSUM BOARD
JAMB DETAIL
GYPSUM BOARD
SILL DETAIL
GYPSUM BOARD
TYPICAL WINDOW
BULKHEAD DETAIL
CEILING
CASEWORK DETAIL
CASEWORK DETAIL
ROOM GROUPS TYPE A & B
ROOM GROUP TYPE C
WAINSCOT DETAIL
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A602
SCHEDULE FOR
ROOM FINISH
PHASES 4 AND 5
PHASE 1 DOOR SCHEDULE
GLAZING SCHEDULE
DOOR HARDWARE SETS
PHASE 2 DOOR SCHEDULE
PHASE 3 DOOR SCHEDULE
PHASE 4 DOOR SCHEDULE
PHASE 5 DOOR SCHEDULE
DOOR ELEVATIONSDOOR FRAME ELEVATIONS
ABCF-1F-2 DE
DOOR HEAD / JAMB DETAILDOOR SILL DETAIL DOOR SILL DETAILNOT USED
HEAD DETAIL
JAMB DETAILJAMB DETAIL
DOOR SILL WITH PORCH SLAB CONNECTION DETAIL
DOOR HEAD / JAMB DETAILDOOR HEAD / JAMB DETAILDOOR SILL DETAIL
EAST ELEVATION - NEW WALL
WALL EXPANSION JOINT DETAIL
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
2020-001
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
TJW TJW
Ph as e
A603
AND DETAILS
DOOR SCHEDULES
FOR ALL PHASES
ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M001
MECHANICAL
SYMBOLS,
ABBREVIATIONS,
GENERAL NOTES
DAM DSJ
GENERAL SYMBOLS:
DEMOLITION NOTE
POINT OF REMOVAL
POINT OF CONNECTION
PLAN NOTE
NOTE: ALL SYMBOL DESCRIPTIONS ARE SUBJECT TO MODIFICATION ON THE DRAWINGS. ALL SYMBOLS NOT NECESSARILY USED ON THIS PROJECT.
DUAL DUCT TERMINAL BOX:
FD
VERTICAL FIRE DAMPER
HORIZONTAL FIRE DAMPER
VOLUME BALANCE DAMPER
FLEXIBLE DUCT
DUCT TURN 90°
DUCT DEPTH
DUCT WIDTH
16x14
FILTER (INLINE)
PIPE ELBOW UP (RISER)
PIPE ELBOW DOWN
UNION
PIPE TEE DOWN
PIPE TURN 90°
CAP OR PLUG
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC
PIPE GUIDE
PIPE ANCHOR
FLANGES
LINE BREAK
Y-STRAINER
FLEXIBLE CONNECTION
STEAM TRAP
PRESSURE SENSOR
BALL VALVE
VALVES & FITTINGS:
GLOBE VALVE
GATE VALVE
PLUG VALVE
NEEDLE VALVE
THERMAL EXPANSION VALVE
BUTTERFLY VALVE
BALANCING VALVE
CHECK VALVE
CONTROL VALVE
PRESSURE REDUCING,
PRESSURE REDUCING,
SOLENOID VALVE
SELF CONTAINED VALVE
RELIEF, PILOT OPERATED
THREE WAY BALL VALVE
THREE WAY GLOBE VALVE
THREE WAY PLUG VALVE
PILOT OPERATED VALVE
VALVE
AUTOMATIC FLOW CONTROL
VALVE
THREE WAY CONTROL VALVE
ANGLE GLOBE VALVE
PRESSURE RELIEF,
ANGLE TYPE VALVE
BACK FLOW PREVENTER
DUCTWORK:
SUPPLY ARROW
GAUGE
VOLUME DAMPER
RETURN/EXHAUST ARROW
SUPPLY UP
SUPPLY UP
SUPPLY DOWN
SUPPLY DOWN
RETURN/EXHAUST UP
RETURN/EXHAUST UP
RETURN/EXHAUST DOWN
RETURN/EXHAUST DOWN
ROUND UP
ROUND UP
ROUND DOWN
ROUND DOWN
OVAL SUPPLY UP
OVAL SUPPLY UP
OVAL SUPPLY DOWN
OVAL SUPPLY DOWN
SINGLE LINE REPRESENTATION:
90° MITERED ELBOW WITH
DUCT END CAP
ELBOW
w
(r=w) r
HORIZONTAL FIRE DAMPER
FD
FD VERTICAL FIRE DAMPER
ACCESS DOORAD
DUCT END CAP
FLEXIBLE DUCT
SUPPLY DIFFUSER:
RETURN/EXHAUST GRILLE:
LINEAR BAR & SLOT DIFFUSER:
FD
THERMOSTAT
DUCTWORK:
TURNING VANES
MECHANICAL ABBREVIATIONS:
SANITARY
PIPE SLOPES IN DIRECTION OF ARROW
HOT WATER RETURN
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
POTABLE COLD WATER
POTABLE HOT WATER (TEMPERATURE AS NOTED)
SANITARY VENT
INLINE PUMP
REVISION
MOTORIZED DAMPER
THERMOMETER
PIPING DESIGNATIONS:
NEW PIPING
DETAIL BUBBLE
SECTION BUBBLE
M
SD-4
SHADING INDICATES BLANKED-OFF
QUADRANT OF DIFFUSION PATTERN
DIFFUSER TYPE
DIFFUSER SIZE
DIFFUSER CFM
RG-3
GRILLE TYPE
GRILLE SIZE
GRILLE CFM
LD-6
DIFFUSER TYPE
DIFFUSER SIZE
DIFFUSER CFM
SEE SCHEDULE FOR
RUNOUT SIZE
SEE SCHEDULE FOR
RUNOUT SIZE
SEE SCHEDULE FOR
RUNOUT SIZE
ARROW INDICATES
DIRECTION OF AIR FLOW
MOTORIZED DAMPER
M
BACKDRAFT DAMPER
BDD
VAV-1
TYPE OF TERMINAL BOX
TERMINAL BOX SIZE
SEE SCHEDULE
FOR RUNOUT SIZE
VAV-1
TYPE OF TERMINAL BOX
TERMINAL BOX SIZE
SUPPLY DIFFUSER:
RETURN/EXHAUST GRILLE:
LINEAR BAR & SLOT DIFFUSER:
SD-4
DIFFUSER TYPE
DIFFUSER SIZE
DIFFUSER CFM
RG-3
GRILLE TYPE
GRILLE SIZE
GRILLE CFM
LD-6
DIFFUSER TYPE
DIFFUSER SIZE
DIFFUSER CFM
SEE SCHEDULE FOR
RUNOUT SIZE
SEE SCHEDULE FOR
RUNOUT SIZE
SEE SCHEDULE FOR
RUNOUT SIZE
ARROW INDICATES
DIRECTION OF AIR FLOW
BACKDRAFT DAMPERBDD
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AD ACCESS DOOR
BDD BACK DRAFT DAMPER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOD BOTTOM OF DUCT
BOS BOTTOM OF STEEL
BTU BRITISH THERMAL UNIT
CA COMPRESSED AIR
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEANOUT
CR CONDENSATE RETURN
CS CAST SINK
CSS CLINIC SERVICE SINK
CW DOMESTIC COLD WATER
DB DRY BULB
DCV DOUBLE CHECK VALVE
DIA DIAMETER
DN DOWN
DW DEIONIZED WATER
EES EMERGENCY EYE AND SHOWER WASH
EEW EMERGENCY EYE WASH
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ES EMERGENCY SHOWER
EXIST EXISTING
GL GLYCOL
FCU FAN COIL UNIT
FD FIRE DAMPER OR FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FLA FULL LOAD AMPS
HB HOSE BIBB
HKSP HOUSEKEEPING
HNDCP HANDICAPPED
HPR HIGH PRESSURE STEAM RETURN
HPS HIGH PRESSURE STEAM SUPPLY
HW DOMESTIC HOT WATER
HWR DOMESTIC HOT WATER RETURN
HWRP HOT WATER RECIRCULATION PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
IE INVERT ELEVATION
JS JANITOR SINK
JT JOINT
LAV LAVATORY
LPSR LOW PRESSURE STEAM RETURN
LPSS LOW PRESSURE STEAM SUPPLY
MB MOP BASIN
MF MIXING FAUCET
MPR MEDIUM PRESSURE STEAM RETURN
MPS MEDIUM PRESSURE STEAM SUPPLY
NC NORMALLY CLOSED
NO NORMALLY OPEN
PIV POST INDICATING VALVE
PRV PRESSURE RELIEF VALVE
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
RF RETURN FAN
RG RETURN GRILLE
RO REVERSE OSMOSIS
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
SAN SANITARY
SD SUPPLY DIFFUSER
SF SUPPLY FAN
SG SUPPLY GRILLE
SH SHOWER
SI SEDIMENT INTERCEPTOR
SK SINK
STM STEAM
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TSP TOTAL STATIC PRESSURE
V SANITARY VENT
VD VOLUME DAMPER
VTR VENT THROUGH ROOF
WB WET BULB
WC WATER CLOSET
WH WALL HYDRANT
DIFFUSERS & REGISTERS
TERMINAL BOXES
SINGLE-DUCT TERMINAL BOX
HUMIDISTAT
SENSOR
DUCT TRANSITION -
SLOPED ON BOTH SIDES
DUCT TRANSITION -
FLAT ON ONE SIDE
DUCT TRANSITION -
SQUARE TO ROUND
DUCT TRANSITION -
SQUARE TO ROUND
DUCT TRANSITION -
SLOPED BOTH SIDES
DUCT TRANSITION -
FLAT ON ONE SIDE
15° MAX
15° MAX
CONTROL PANEL
SEE SCHEDULE
FOR RUNOUT SIZE
CONTROL PANEL(S)
SHADING INDICATES BLANKED-OFF
QUADRANT OF DIFFUSION PATTERN
S
H
A M-501
T
T
S
P
1. PROVIDE AND INSTALL ALL EQUIPMENT, PIPING, DUCTWORK AND
APPURTENANCES AS DESCRIBED BY THESE DRAWINGS AND AS REQUIRED
TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS TO THE OWNER
UNDER THIS CONTRACT.
2. REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS
RELATING TO THE QUALITY, CONSTRUCTION AND FINISH OF MATERIALS.
3. THESE DRAWINGS INDICATE REQUIRED SIZE AND POINTS OF TERMINATION
FOR PIPING, DUCTWORK, CONDUIT, ETC. THE EQUIPMENT SHOWN
ILLUSTRATES SUGGESTED ROUTING, BUT ALL NECESSARY OFFSETS MAY
NOT BE SHOWN. INSTALL WORK IN A MANNER THAT WILL CONFORM WITH
THE STRUCTURE. AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND
MAINTAIN MAXIMUM CLEARANCE WITHOUT FURTHER INSTRUCTION FROM
THE ARCHITECT/ENGINEER OR ADDITIONAL COST TO THE OWNER.
4. THE DRAWINGS ARE A COMPLIMENTARY PART OF THE CONTRACT
DOCUMENTS. THE PROVISIONS OF ANY CONTRACT DOCUMENT ARE
BINDING AS IF BY ALL. IF INFORMATION ON A DRAWING CONFLICTS WITH
ANOTHER CONTRACT DOCUMENT, THE PROVISIONS GRANTING GREATER
RIGHTS TO THE OWNER, IMPOSING GREATER RESPONSIBILITY TO THE
CONTRACTOR OR REQUIRING GREATER QUANTITY OR HIGHER QUALITY
SHALL GOVERN.
5. ALL VALVES, COILS, DAMPERS, TRAPS ETC. SHALL BE INSTALLED
ALLOWING EASY ACCESS FOR OPERATION AND MAINTENANCE. AREA
ADJACENT TO THE ACCESS PANELS SHALL BE CLEAR OF ANY
OBSTRUCTIONS.
6. ARROWS ON THE CHILLED WATER MAINS INDICATE THE DIRECTION OF
FLOW; PITCH MAINS UPWARD A MINIMUM OF 1" PER 60' IN THE DIRECTION
OF FLOW. ARROWS ON STEAM AND CONDENSATE PIPING AND DRAIN LINE
INDICATE THE DOWNWARD PITCH OF THE PIPING; PITCH PIPING
DOWNWARD A MINIMUM OF 1” PER 40'.
7. INSTALL AIR VENTS AT ALL HIGH POINTS AND DRAINS AT ALL LOW POINTS
OF WATER PIPING SYSTEM(S).
8. PIPING BRANCHES TO EQUIPMENT SHALL HAVE SAME SIZE VALVES AND
FITTINGS AS THAT OF THE LINE SIZE WITH THE EXCEPTION OF THE
TEMPERATURE CONTROL VALVES AND STEAM TRAPS.
9. DUCT OR PIPING PENETRATING FLOOR SLABS AND/OR WALLS SHALL BE
SEALED WEATHERTIGHT AND MATCH EXISTING CONSTRUCTION. DUCTS
OR PIPING PENETRATING FIRE RATED WALL AND/OR FLOOR SHALL BE
SEALED PER FIRE CODE. OPENINGS AROUND DUCT OR PIPES SHALL BE
SEALED WITH A MATERIAL HAVING THE SAME FIRE RATING AS THE WALL
OR FLOOR.
10. SHEET METAL DUCT SIZES ARE INSIDE DIMENSIONS. WHERE DUCT LINER
SPECIFIED, SHEET METAL DUCT SIZES INDICATE INSIDE DUCT LINER
DIMENSIONS.
11. INSTALL VOLUME DAMPER AT EACH BRANCH TAKE-OFF FROM MAIN
SUPPLY DUCTS.
12. ALL WALL THERMOSTATS, TEMPERATURE SENSORS, AND/OR HUMIDISTATS
SHALL BE LINED UP VERTICALLY WITH LIGHT SWITCHES UNLESS
OTHERWISE NOTED OR DIRECTED BY THE ARCHITECT/ENGINEER.
13. NO PLASTIC WATER LINES SHALL BE USED.
14. COORDINATE ALL WORK TO BE INSTALLED WITH ANY AND ALL OTHER
CONTRACTORS TO BE AFFECTED BY SUCH WORK, PRIOR TO ORDERING
ANY OF THE EQUIPMENT. THIS SHALL INCLUDE BUT NOT LIMITED TO
ELECTRICAL CHARACTERISTICS, CONNECTIONS REQUIRED, PENETRATION
SIZES AND LOCATIONS, PHYSICAL SIZE, COLOR AND FIT. ALSO REFER TO
SPECIFICATIONS.
15. ALL EQUIPMENT SHALL BE OF, AND CONSIST OF, AT LEAST MINIMUM SIZES
SELECTED, AND SHALL PERFORM TO OR SURPASS THE MINIMUM
REQUIREMENTS, SCHEDULES, NOTED AND SPECIFIED.
16. THE CONTRACTOR SHALL PROVIDE MISCELLANEOUS STEEL, PIPE
SUPPORTS, HANGERS, AND ADDITIONAL BRACING TO SUPPORT THE PIPE
AND EQUIPMENT. SEE STRUCTURAL DRAWINGS AND SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
17. MAINTAIN PROPER CLEARANCES AROUND TELECOMMUNICATIONS
SKELETAL AND INFRASTRUCTURE DURING AND AFTER CONSTRUCTION
18. WORK IS TO BE PERFORMED IN PHASES SEE ARCHITECTURAL DRAWINGS
FOR PHASING OF WORK.
19. REFER TO GENERAL NOTES ON DRAWING G101 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES:
1. REPAIR AND PATCH ANY DAMAGE TO EXISTING OR NEW FACILITIES,
INCLUDING SURFACES, SIDEWALKS, STREETS, FLOORS, WALLS, ROOFS,
CEILING AND PAVEMENT. REPAIRS SHALL MATCH EXISTING
INSTALLATION.
2. ALL EXISTING EQUIPMENT (HVAC & PLUMBING), DUCTWORK, AND PIPING
(HVAC & PLUMBING) LOCATIONS, ROUTINGS, CLEARANCES AND SIZES OF
ITEMS TO BE REMOVED OR REUSED SHALL BE FIELD VERIFIED AT THE JOB
SITE. THIS ALSO INCLUDES ITEMS THAT MAY BE IN CONFLICT WITH NEW
WORK. ALL DISCREPANCIES BETWEEN THE DRAWINGS AND FIELD
SURVEY SHALL BE DOCUMENTED FOR REVIEW BY THE
ARCHITECT/ENGINEER.
3. ON DEMOLITION DRAWINGS, DASHED LINE ITEMS ARE ITEMS THAT SHALL
BE REMOVED.
4. ALL EQUIPMENT, PIPING, DUCTWORK, ETC MARKED FOR DEMOLITION
SHALL BE REMOVED COMPLETE, UNLESS OTHERWISE NOTED.
CONTRACTORS SHALL VERIFY EXACT DEMOLITION REQUIREMENTS PRIOR
TO BID AS ALL ITEMS MAY NOT BE SHOWN THAT MUST BE REMOVED. ALL
DEMOLISHED MATERIALS SHALL BECOME THE PROPERTY OF THE
CONTRACTOR. ALL DEMOLISHED MATERIALS ARE TO BE REMOVED FROM
THE OWNER'S SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PROPER DISPOSAL OF ALL DEMOLISHED MATERIALS.
5. ALL PNEUMATIC CONTROL LINES SHALL BE REMOVED BACK TO THE
PNEUMATIC CONTROL AIR MAIN AND CAPPED.
6. REFER TO "SELECTIVE DEMOLITION" SPECIFICATION FOR ADDITIONAL
INFORMATION INCLUDING DISPOSAL AND RECYCLING.
GENERAL DEMOLITION NOTES:
AI ANALOG INPUT
AO ANALOG OUTPUT
BI BINARY INPUT
BO BINARY OUTPUT
CO2 CARBON DIOXIDE SENSOR
CS CURRENT SENSOR
P DIFFERENTIAL PRESSURE SENSOR
S DUCT SMOKE DETECTOR
ES END SWITCH
H HUMIDITY SENSOR
LL LOW LIMIT TEMPERATURE SENSOR
P PRESSURE SENSOR
T TEMPERATURE SENSOR
VARIABLE FREQUENCY DRIVEVFD
AIR HANDLER FAN
AIR FLOW MEASURING STATION
CONTROL VALVE
HYDRONIC PUMP
MOTOR STARTER
FLOW/CONTROL SYMBOLS:
MS
EP ELECTRO-PNEUMATIC SWITCH
FS FLOAT SWITCH
DUCT LINER
1 1
3 3
M
3 1
M
T
PHASE 4
WORK SHOWN IS TYPICAL
FOR STAFF ROOM PAIR.
WORK SHOWN IS TYPICAL
FOR STUDENT ROOM PAIR.
WORK SHOWN IS TYPICAL
FOR STUDENT ADA ROOM PAIR.
1 2
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M101
FIRST FLOOR
HVAC DEMOLITION
PLAN
SCALE:
FIRST FLOOR HVAC DEMOLITION PLAN
1/8" =1'-0"
1. ALL WORK MUST COMPLY WITH CURRENT MECHANICAL
CODE.
2. REPORT ALL MAINTENANCE CONCERNS TO OWNER AND
ENGINEER.
3. BUILDING TO REMAIN OCCUPIED AND OPERATIONAL
DURING CONSTRUCTION. COORDINATE ALL
SHUTDOWNS AND OUTAGES WITH OWNER MIN. 10 DAYS
IN ADVANCE.
4. CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND
SECURITY PROCEDURES AND PROTOCOLS AS
DESIGNATED BY THE OWNER.
5. REFER TO GENERAL NOTES ON DRAWING G101 FOR
ADDITIONAL INFORMATION.
6. REFER TO "SELECTIVE DEMOLITION" SPECIFICATION
SECTION FOR ADDITIONAL INFORMATION INCLUDING
DISPOSAL AND RECYCLING REQUIREMENTS.
7. WORK TO BE COMPLETED IN PHASES REFER TO
ARCHITECTURAL DOCUMENTS FOR PHASING OF WORK.
GENERAL NOTES:
1. ALL WORK RELATED TO PTAC UNITS TO BE
COMPLETED IN PHASE 1. REMOVE EXISTING PTAC
UNIT INCLUDING WALL SLEEVE AND LOUVER.
PROTECT OPENING PRIOR TO INSTALLATION OF NEW
UNIT - REPORT MAINTENANCE CONCERNS TO GC AND
OWNER.
2. ALL WORK RELATED TO TOILET ROOM EXHAUST FANS
TO BE COMPLETED IN PHASE ASSOCIATED WITH
ROOM. REMOVE EXISTING CEILING EXHAUST FAN
AND DUCTWORK BACK TO EXHAUST RISER
COMPLETE.
3. REMOVE EXISTING ELECTRIC CABINET HEATER
COMPLETE INCLUDING WIRING AND CONTROLS.
4. REMOVE EXISTING FAN COIL UNIT - CAP HEATING
WATER PIPING FOR EXTENSION IN NEW WORK.
5. REMOVE EXISTING FLUE COMPLETE. PATCH
OPENINGS TO MATCH EXISTING SURFACES.
6. REMOVE EXISTING MOTORIZED DAMPER AND
ASSOCIATED CONTROLS. COORDINATE WITH NEW
WORK FOR EXTENT OF DEMOLITION.
7. EXISTING EXHAUST DUCT AND GRILLE TO REMAIN.
8. EXISTING TRANSFER DUCT AND GRILLE(S) TO
REMAIN. CLEAN AND PAINT CEILING AND WALL
GRILLES TO MATCH ADJACENT SURFACES.
9. REMOVE EXISTING PTAC UNIT COMPLETE INCLUDING
WALL SLEEVE, LOUVER, CONTROLS, AND WIRING.
10. REMOVE EXISTING EXHAUST FAN THERMOSTAT.
11. MECHANICAL WORK ASSOCIATED WITH THESE
ROOMS TO BE COMPLETED IN PHASE 1 WORK.
DEMOLITION NOTES:#
DAM DSJ
20039
M
T
7 7
M T
M M
WORK SHOWN IS TYPICAL
FOR STUDENT ROOM PAIR.
1 1
WORK SHOWN IS TYPICAL
FOR STAFF ROOM PAIR.
11 11
WORK SHOWN IS TYPICAL
FOR VISITOR'S QUARTERS
COORDINATE WORK IN THESE
ROOMS WITH OWNER. ANY
FINISHES DISTURBED BY THIS
WORK TO BE RESTORED TO
MATCH EXISTING FINISHES.
T
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M102
SECOND FLOOR
HVAC DEMOLITION
PLANSCALE:
SECOND FLOOR HVAC DEMOLITION PLAN
1/8" =1'-0"
DAM DSJ
1. ALL WORK MUST COMPLY WITH CURRENT MECHANICAL
CODE.
2. REPORT ALL MAINTENANCE CONCERNS TO OWNER AND
ENGINEER.
3. BUILDING TO REMAIN OCCUPIED AND OPERATIONAL
DURING CONSTRUCTION. COORDINATE ALL
SHUTDOWNS AND OUTAGES WITH OWNER MIN. 10 DAYS
IN ADVANCE.
4. CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND
SECURITY PROCEDURES AND PROTOCOLS AS
DESIGNATED BY THE OWNER.
5. REFER TO GENERAL NOTES ON DRAWING G101 FOR
ADDITIONAL INFORMATION.
6. REFER TO "SELECTIVE DEMOLITION" SPECIFICATION
SECTION FOR ADDITIONAL INFORMATION INCLUDING
DISPOSAL AND RECYCLING REQUIREMENTS.
7. WORK TO BE COMPLETED IN PHASES REFER TO
ARCHITECTURAL DOCUMENTS FOR PHASING OF WORK.
GENERAL NOTES:
1. ALL WORK RELATED TO PTAC UNITS TO BE
COMPLETED IN PHASE 1. REMOVE EXISTING PTAC
UNIT INCLUDING WALL SLEEVE AND LOUVER.
PROTECT OPENING PRIOR TO INSTALLATION OF NEW
UNIT - REPORT MAINTENANCE CONCERNS TO GC AND
OWNER.
2. ALL WORK RELATED TO TOILET ROOM EXHAUST FANS
TO BE COMPLETED IN PHASE ASSOCIATED WITH
ROOM. REMOVE EXISTING CEILING EXHAUST FAN
AND DUCTWORK BACK TO EXHAUST RISER
COMPLETE.
3. REMOVE EXISTING ELECTRIC CABINET HEATER
COMPLETE INCLUDING WIRING AND CONTROLS.
4. EXISTING EXHAUST DUCT DOWN TO FIRST FLOOR TO
REMAIN.
5. REMOVE EXISTING FLUE COMPLETE. PATCH
OPENINGS TO MATCH EXISTING SURFACES.
6. REMOVE EXISTING MOTORIZED DAMPER AND
ASSOCIATED CONTROLS. COORDINATE WITH NEW
WORK FOR EXTENT OF DEMOLITION.
7. EXISTING EXHAUST DUCT AND GRILLE TO REMAIN.
8. EXISTING TRANSFER DUCT AND GRILLE(S) TO
REMAIN. CLEAN AND PAINT CEILING AND WALL
GRILLES TO MATCH ADJACENT SURFACES.
9. NOT USED.
10. REMOVE EXISTING EXHAUST FAN THERMOSTAT .
11. MECHANICAL WORK ASSOCIATED WITH THESE
ROOMS TO BE COMPLETED IN PHASE 1 WORK.
DEMOLITION NOTES:#
20x10 UP TO SECOND FLOOR TRANSITION TO 20x20 BELOW 2ND FLOOR
ECUH-2
ECUH-3
ECUH-2
ECUH-2
18x16
CEF-1
PTAC-11 PTAC-1 1
4"Ø
ECUH-1
FCU-1
PTAC-11 PTAC-1 1
CEF-13
4"Ø
ECUH-2
20x10 UP TO SECOND FLOOR TRANSITION TO 20x20 BELOW
2ND FLOOR
18x30
PTAC-21
ECUH-2
4"Ø
CEF-1 3CEF-13
T
PTAC-1 1PTAC-11
T
T
20x10 UP TO SECOND FLOOR TRANSITION TO 20x20 BELOW 2ND FLOOR 6
18x16
ECUH-1
ECUH-2
20x10 UP TO SECOND FLOOR TRANSITION TO 20x20 BELOW 2ND FLOOR
18x16
ECUH-1
ECUH-2
ECUH-3
PTAC-2 1
T
T
T
PTAC-11
FCU-211
WORK IN PHASE 4
PTAC-2 1
PTAC-2 1
T
M
RGA RGA
SEE ARCHITECTURAL PHASING
PLAN FOR THIS AREA.
WORK SHOWN IS TYPICAL
FOR STAFF ROOM PAIR.
WORK SHOWN IS TYPICAL
FOR STUDENT ADA ROOM PAIR.
4"Ø
CEF-1
CEF-1
PTAC-1
PTAC-1
T
T
WORK SHOWN IS TYPICAL
FOR STUDENT ROOM PAIR.
T
T
EGA 500
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M301
FIRST FLOOR
HVAC PLAN
SCALE:
FIRST FLOOR HVAC PLAN
1/8" =1'-0"
1. ALL WORK MUST COMPLY WITH CURRENT MECHANICAL
CODE.
2. RIGID AND FLEXIBLE DUCTWORK FABRICATION SHALL
CONFORM TO THE LATEST EDITION OF SMACNA "HVAC
DUCT CONSTRUCTION STANDARDS - METAL AND
FLEXIBLE". MINIMUM ALLOWABLE SHEETMETAL GAUGE
SHALL BE 22 GAUGE.
3. DUCTWORK SHALL BE CONSTRUCTED, AT MIN., TO THE
FOLLOWING CLASSES:
a. SUPPLY: PRESSURE 0-4"WC, LEAK 12 VELOCITY 2000
FPM.
b. RETURN AND EXHAUST: PRESSURE -1" TO +1"WC, LEAK
24, VELOCITY 1500 FPM.
4. ALL SUPPLY DUCTWORK TO BE EXTERNALLY INSULATED,
UNLESS OTHERWISE NOTED. OUTDOOR DUCTWORK TO
HAVE DOUBLE LAYER OF CLOSED CELL ELASTOMERIC
INSULATION WITH BONDED ALUMINUM CLADDING.
5. ALL NEW AIR SYSTEMS TO BE TESTED, ADJUSTED AND
BALANCED BY LICENSED TAB AGENCY.
6. ALL EXPOSED DUCTWORK, TO BE PREPARED AND
PRIMED FOR PAINTING.
7. CONTRACTOR TO COORDINATE INSTALLATION OF NEW
WORK WITH ALL OTHER TRADES TO MAINTAIN PROPER
ACCESS AND CLEARANCES FOR SERVICE AND
MAINTENANCE.
8. PROPERLY SUSPEND ALL EQUIPMENT, DUCTWORK,
DIFFUSERS AND GRILLES, ETC. FROM STRUCTURE.
9. PROVIDE 3 SETS OF FILTERS FOR EACH RTU. 1 SET FOR
CONSTRUCTION, 1 SET FOR TAB AND 1 SET TO BE
INSTALLED AT SUBSTANTIAL COMPLETION OF PROJECT
PHASE.
10. BUILDING TO REMAIN OCCUPIED AND OPERATIONAL
DURING CONSTRUCTION. COORDINATE ALL
SHUTDOWNS AND OUTAGES WITH OWNER MIN. 10 DAYS
IN ADVANCE.
11. CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND
SECURITY PROCEDURES AND PROTOCOLS AS
DESIGNATED BY THE OWNER.
12. REFER TO GENERAL NOTES ON DRAWING G101 FOR
ADDITIONAL INFORMATION.
13. WORK TO BE COMPLETED IN PHASES REFER TO
ARCHITECTURAL DOCUMENTS FOR PHASING OF WORK.
GENERAL NOTES:
1. ALL WORK RELATED TO PTAC UNITS TO BE
COMPLETED IN PHASE 1. INSTALL NEW PTAC UNIT
WITH NEW WALL SLEEVE AND LOUVER. PROVIDE
EXTERNAL DRAIN TUBE EXTENDED 4" BEYOND FACE
OF WALL.
2. ALL WORK RELATED TO TOILET ROOM EXHAUST FANS
TO BE COMPLETED IN PHASE ASSOCIATED WITH
ROOM. CONNECT NEW 4" EXHAUST DUCTS TO
EXISTING 10x3 WALL STACK. NEW EXHAUST TO BE
RIGID METAL DUCTWORK WITH MAXIMUM 12" OF
FLEXIBLE DUCT AT CONNECTION TO FAN-SECURE FLEX
DUCT WITH METAL DRAW BAND CLAMPS.
3. NEW CEILING EXHAUST FAN WITH INTEGRAL CEILING
GRILLE. FAN TO HAVE INTEGRAL BACKDRAFT DAMPER.
4. REMOTE TEMPERATURE AND HUMIDITY SENSOR -TIE
INTO NEW BMS. ROUTE WIRING DOWN IN STUD WALL
AND AROUND TO UNIT IN SURFACE MOUNTED
RACEWAY ON WALL JUST ABOVE BASE MOLDING.
5. HEAVY DUTY WALL SUPPLY GRILLE, 18x16 DOUBLE
DEFLECTION LIKE "TITUS" 300RL-HD. INSTALL WITH
TAMPER PROOF HARDWARE BOTTOM OF GRILLE AT 12"
ABOVE FINISHED FLOOR.
6. PROVIDE REMOTE CABLE OPERATED DAMPER IN DUCT
BELOW 2ND FLOOR. BALANCE TO 1250 CFM FOR EVEN
DISTRIBUTION BETWEEN FLOORS. MOUNT OPERATOR
IN ACCESSIBLE LOCATION ON CHASE WALL.
7. HEAVY DUTY WALL SUPPLY GRILLE, 18x30 DOUBLE
DEFLECTION LIKE "TITUS" 300RS-HD. INSTALL WITH
TAMPER PROOF HARDWARE BOTTOM OF GRILLE AT 12"
ABOVE FINISHED FLOOR.
8. CONNECT EXISTING HEATING WATER PIPING TO NEW
UNIT. PROVIDE NEW SPECIALTIES PER DETAIL.
9. REBALANCE EXISTING GRILLE TO 500 CFM.
10. REBALANCE EXISTING WALL GRILLE TO 300 CFM.
11. WORK IN PHASE 4 COORDINATED WITH NEW
CONSTRUCTION - FCU-2: WALL MOUNTED DUCTLESS
UNIT, MOUNTED WITH BOTTOM AT 6' 0" A.F.F. ROUTE
REFRIGERANT PIPING AND WIRING PER
MANUFACTURER'S RECOMMENDATIONS. ENCLOSE IN
METAL PIPE ENCLOSURE PAINTED TO MATCH WALL.
ROUTE DRAIN OVER AND DOWN IN NEW WALL TO SPILL
ON GRADE AT APPROX. 18" ABOVE FINISHED GRADE.
PROVIDE REMOTE CONTROLLER FOR WALL MOUNTING.
REMOVE PTAC UNIT IN THIS ROOM COMPLETE
INCLUDING WIRING, HARDWARE, CONTROLS ETC.
PROTECT UNIT AND TURN OVER TO OWNER IN GOOD
CONDITION.
12. PROVIDE NEW 24x12 MOTORIZED DAMPER IN EXISTING
DUCT - FIELD VERIFY PRIOR TO ORDERING. PROVIDE
LINE VOLTAGE THERMOSTAT AND INTERLOCK WITH
REF-7 AND DAMPER.
13. MODIFY OPENING THROUGH 2ND FLOOR AS REQUIRED
TO ROUTE 10x10 EXHAUST UP. PROVIDE TYPE "EGA"
GRILLE AT BOTTOM OF DUCT AND BALANCE TO 500
CFM.
14. WORK IN THIS SPACE TO BE COMPLETED UNDER
PHASE 1 WORK.
PLAN NOTES:#
A M501
E M501
PTAC-2
ECUH-1
ECUH-1
518x16
PTAC-1 1
18x16
PTAC-21
ECUH-1
CEF-13
CEF-13
T
T
PTAC-1
PTAC-1
T
CEF-1 3CEF-13
PTAC-1
T
T
20x10 UP TO SECOND FLOOR TRANSITION TO 20x20 BELOW 2ND FLOOR 6
518x16
ECUH-1
20x20 UP TO UNIT ON ROOF 20x10 DN TO FIRST FLOOR
18x16
ECUH-1
ECUH-1
PTAC-2 1
ECUH-1
T
20x20 UP TO UNIT ON ROOF 20x10 DN TO FIRST FLOOR
BALANCE SUPPLY AIR AT UNIT TO SCHEDULED CFM
USE BALANCING DEVICE ABOVE 2ND FLOOR TO
EVENLY DISTRIBUTE AIR BETWEEN FLOORS.
20x20 UP TO UNIT ON ROOF 20x10 DN TO FIRST FLOOR
T
7T
M
BALANCE SUPPLY AIR AT UNIT TO SCHEDULED CFM
USE BALANCING DEVICE ABOVE 2ND FLOOR TO
EVENLY DISTRIBUTE AIR BETWEEN FLOORS.
PTAC-2 1
T
T
PTAC-2 1
FCU-312
WORK IN PHASE 4
PTAC-1 1
PTAC-1 1
PTAC-1 1
PTAC-1 1
T
T
T
T
3" PVC VENT FOR WATER HEATERS WH-1 ,2,3,4
COORDINATE WITH WATER HEATERS TERMINATE WITH CONCENTRIC
VENTING KIT PROVIDED WITH WATER HEATERS. PROVIDE NEW ROOF
PENETRATIONS AND FLASH WEATHERTIGHT. WORK TO BE COMPLETED
IN PHASE 4 TO MATCH INSTALLATION OF WATER HEATERS.
EGA-500
PTAC-11
14 14
WORK SHOWN IS TYPICAL
FOR STAFF ROOM PAIR.
WORK SHOWN IS TYPICAL
FOR STUDENT ROOM PAIR.
UP TO
REF-9
UP TO REF-10 UP TO REF-12 UP TO REF-11
UP TO REF-6
UP TO REF-7
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M302
SECOND FLOOR
HVAC PLANSCALE:
SECOND FLOOR HVAC PLAN
1/8" =1'-0"
1. ALL WORK MUST COMPLY WITH CURRENT MECHANICAL
CODE.
2. RIGID AND FLEXIBLE DUCTWORK FABRICATION SHALL
CONFORM TO THE LATEST EDITION OF SMACNA "HVAC
DUCT CONSTRUCTION STANDARDS - METAL AND
FLEXIBLE". MINIMUM ALLOWABLE SHEETMETAL GAUGE
SHALL BE 22 GAUGE.
3. DUCTWORK SHALL BE CONSTRUCTED, AT MIN., TO THE
FOLLOWING CLASSES:
a. SUPPLY: PRESSURE 0-4"WC, LEAK 12 VELOCITY 2000
FPM.
b. RETURN AND EXHAUST: PRESSURE -1" TO +1"WC, LEAK
24, VELOCITY 1500 FPM.
4. ALL SUPPLY DUCTWORK TO BE EXTERNALLY INSULATED,
UNLESS OTHERWISE NOTED. OUTDOOR DUCTWORK TO
HAVE DOUBLE LAYER OF CLOSED CELL ELASTOMERIC
INSULATION WITH BONDED ALUMINUM CLADDING.
5. ALL NEW AIR SYSTEMS TO BE TESTED, ADJUSTED AND
BALANCED BY LICENSED TAB AGENCY.
6. ALL EXPOSED DUCTWORK, TO BE PREPARED AND
PRIMED FOR PAINTING.
7. CONTRACTOR TO COORDINATE INSTALLATION OF NEW
WORK WITH ALL OTHER TRADES TO MAINTAIN PROPER
ACCESS AND CLEARANCES FOR SERVICE AND
MAINTENANCE.
8. PROPERLY SUSPEND ALL EQUIPMENT, DUCTWORK,
DIFFUSERS AND GRILLES, ETC. FROM STRUCTURE.
9. PROVIDE 3 SETS OF FILTERS FOR EACH RTU. 1 SET FOR
CONSTRUCTION, 1 SET FOR TAB AND 1 SET TO BE
INSTALLED AT SUBSTANTIAL COMPLETION OF PROJECT
PHASE.
10. BUILDING TO REMAIN OCCUPIED AND OPERATIONAL
DURING CONSTRUCTION. COORDINATE ALL
SHUTDOWNS AND OUTAGES WITH OWNER MIN. 10 DAYS
IN ADVANCE.
11. CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND
SECURITY PROCEDURES AND PROTOCOLS AS
DESIGNATED BY THE OWNER.
12. REFER TO GENERAL NOTES ON DRAWING G101 FOR
ADDITIONAL INFORMATION.
13. WORK TO BE COMPLETED IN PHASES REFER TO
ARCHITECTURAL DOCUMENTS FOR PHASING OF WORK.
GENERAL NOTES:
1. ALL WORK RELATED TO PTAC UNITS TO BE
COMPLETED IN PHASE 1.INSTALL NEW PTAC UNIT WITH
NEW INSULATED WALL SLEEVE AND LOUVER. PROVIDE
EXTERNAL DRAIN TUBE EXTENDED 4" BEYOND FACE
OF WALL WITH ELBOW.
2. ALL WORK RELATED TO TOILET ROOM EXHAUST FANS
TO BE COMPLETED IN PHASE ASSOCIATED WITH
ROOM.EXTEND EXISTING 10x3 WALL STACK TO NEW 12x12 EXHAUST UP THROUGH ROOF. CONNECT 4"
EXHAUST FROM SECOND FLOOR EXHAUST FANS TO
12x12 VERTICAL RISER. MAXIMUM 12" OF FLEXIBLE
DUCTWORK AT CONNECTION TO FAN MAKE
CONNECTIONS WITH METAL DRAW BAND CLAMP.
3. NEW CEILING EXHAUST FAN WITH INTEGRAL CEILING
GRILLE. FAN TO HAVE INTEGRAL BACKDRAFT DAMPER.
4. REMOTE TEMPERATURE AND HUMIDITY SENSOR -TIE
INTO NEW BMS. ROUTE WIRING DOWN IN STUD WALL
AND AROUND TO UNIT IN SURFACE MOUNTED
RACEWAY ON WALL JUST ABOVE BASE MOLDING.
5. HEAVY DUTY WALL SUPPLY GRILLE, 18x16 DOUBLE
DEFLECTION LIKE "TITUS" 300RL-HD. INSTALL WITH
TAMPER PROOF HARDWARE BOTTOM OF GRILLE AT 12"
ABOVE FINISHED FLOOR.
6. REMOTE CABLE OPERATED DAMPER IN DUCT BELOW
2ND FLOOR - BALANCE FOR EVEN DISTRIBUTION
BETWEEN FLOORS.
7. COORDINATE LOCATION WITH EXISTING EQUIPMENT.
8. PROVIDE NEW LINE VOLTAGE THERMOSTAT, AND
CONTROL DAMPER. INTERLOCK EXHAUST FAN, AND
DAMPER WITH THERMOSTAT.
9. EXTEND 12x12 EXHAUST DUCT TO NEW LOCATION AND
MAKE NEW PENETRATION OF ROOF. REFER TO
DRAWING M303
10. BALANCE EXISTING GRILLE TO 500 CFM.
11. BALANCE EXISTING WALL GRILLE TO 300 CFM.
12. WORK IN PHASE 4 COORDINATED WITH NEW
CONSTRUCTION - FCU-3: WALL MOUNTED DUCTLESS
UNIT, MOUNTED WITH BOTTOM AT 6' 0" A.F.F. ROUTE
REFRIGERANT PIPING AND WIRING PER
MANUFACTURER'S RECOMMENDATIONS. ROUTE
DRAIN LINE DOWN ON WALL. ENCLOSE PIPING AND
WIRING IN METAL PIPE ENCLOSURE PAINTED TO
MATCH WALL. ROUTE DRAIN DOWN IN NEW WALL TO
SPILL ON GRADE AT APPROX. 18" ABOVE FINISHED
GRADE. PROVIDE REMOTE CONTROLLER FOR WALL
MOUNTING. CAREFULLY REMOVE PTAC UNIT IN THIS
ROOM COMPLETE INCLUDING WIRING, HARDWARE,
CONTROLS ETC. PROTECT UNIT AND TURN OVER TO
OWNER IN GOOD CONDITION.
13. CREATE ACCESS OPENINGS IN EXISTING CHASE AS
NEEDED TO ROUTE 12x12 EXHAUST UP TO REF-6 AND 10x10 DOWN TO FIRST FLOOR. ROUTE 10x10 THROUGH
CHASE AND PROVIDE TYPE "EGA" GRILLE BALANCED
TO 500 CFM. COORDINATE WITH WALL MOUNTED
EQUIPMENT.
14. WORK IN THIS SPACE TO BE COMPLETED UNDER
PHASE 1 WORK.
PLAN NOTES:# A
M501
UP TO REF-8
20x20
MUA-1
20x20
MUA-2
MUA-320x20
20x20 ROUTED
ABOVE ROOF
MUA-4
1 4
1 4
1 4
1 4
REF-10 5
REF-85
REF-7
REF-65
REF-115
ACCU-1 7
WORK IN PHASE 4
REF-9 5
REF-125
CONCENTRIC VENTS FOR NEW WATER HEATERS
TERMINATE WITH CONCENTRIC VENT CAPS PROVIDED
WITH EQUIPMENT. FLASH NEW ROOF PENETRATIONS
WEATHERTIGHT. WORK TO BE COMPLETED IN PHASE
4 TO MATCH INSTALLATION OF WATER HEATERS.
8 8
SOLAR/WIND COLLECTORS - RELOCATED BY GC.
RH-1
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M303
ROOF
MECHANICAL
PLANSCALE:
ROOF MECHANICAL PLAN
1/8" =1'-0"
1. ALL WORK MUST COMPLY WITH CURRENT MECHANICAL
CODE.
2. RIGID AND FLEXIBLE DUCTWORK FABRICATION SHALL
CONFORM TO THE LATEST EDITION OF SMACNA "HVAC
DUCT CONSTRUCTION STANDARDS - METAL AND
FLEXIBLE". MINIMUM ALLOWABLE SHEETMETAL GAUGE
SHALL BE 22 GAUGE.
3. DUCTWORK SHALL BE CONSTRUCTED, AT MIN., TO THE
FOLLOWING CLASSES:
a. SUPPLY: PRESSURE 0-4"WC, LEAK 12 VELOCITY 2000
FPM.
b. RETURN AND EXHAUST: PRESSURE -1" TO +1"WC, LEAK
24, VELOCITY 1500 FPM.
4. ALL SUPPLY DUCTWORK TO BE EXTERNALLY INSULATED,
UNLESS OTHERWISE NOTED. OUTDOOR DUCTWORK TO
HAVE DOUBLE LAYER OF CLOSED CELL ELASTOMERIC
INSULATION WITH BONDED ALUMINUM CLADDING.
5. ALL NEW AIR SYSTEMS TO BE TESTED, ADJUSTED AND
BALANCED BY LICENSED TAB AGENCY.
6. ALL EXPOSED DUCTWORK, TO BE PREPARED AND
PRIMED FOR PAINTING.
7. CONTRACTOR TO COORDINATE INSTALLATION OF NEW
WORK WITH ALL OTHER TRADES TO MAINTAIN PROPER
ACCESS AND CLEARANCES FOR SERVICE AND
MAINTENANCE.
8. PROPERLY SUSPEND ALL EQUIPMENT, DUCTWORK,
DIFFUSERS AND GRILLES, ETC. FROM STRUCTURE.
9. PROVIDE 3 SETS OF FILTERS FOR EACH RTU. 1 SET FOR
CONSTRUCTION, 1 SET FOR TAB AND 1 SET TO BE
INSTALLED AT SUBSTANTIAL COMPLETION OF PROJECT
PHASE.
10. BUILDING TO REMAIN OCCUPIED AND OPERATIONAL
DURING CONSTRUCTION. COORDINATE ALL
SHUTDOWNS AND OUTAGES WITH OWNER MIN. 10 DAYS
IN ADVANCE.
11. CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND
SECURITY PROCEDURES AND PROTOCOLS AS
DESIGNATED BY THE OWNER.
12. REFER TO GENERAL NOTES ON DRAWING G101 FOR
ADDITIONAL INFORMATION.
GENERAL NOTES:
1. MAKEUP AIR UNIT ON 30" TALL INSULATED
PRESSURE CURB IF REQUIRED FOR SIDE
DISCHARGE. REFER TO ARCHITECTURAL
DRAWINGS FOR EXACT PLACEMENT AND
FLASHING DETAILS.
2. 20x20 SUPPLY DUCT ROUTED AT 24" ABOVE ROOF
DECK. SUPPORT MIN. 5' 0" O.C WITH SURFACE
MOUNTED DUCT SUPPORTS LIKE "MIRO
INDUSTRIES 6DS" TRANSITION AS REQUIRED TO
UNIT DISCHARGE OPENING.
3. 20x20 SUPPLY DUCT DOWN THROUGH NEW ROOF
CURB. REFER TO ARCHITECTURAL DRAWINGS
FOR FLASHING DETAILS.
4. POWER AND CONTROL WIRING TO BE ROUTED UP
INSIDE UNIT CURB. FOR ANY ROOF
PENETRATIONS OUTSIDE OF CURB, PROVIDE
PIPING PENETRATION CURB AND COLLAR.
5. NEW EXHAUST FAN ON NEW 14" TALL ROOF CURB.
REFER TO ARCHITECTURAL DRAWINGS FOR
FLASHING DETAILS.
6. CAP EXISTING EXHAUST FAN CURB WITH
INSULATED METAL CURB AND SEAL WEATHER
TIGHT. NEW ROOF PENETRATION MIN 15' 0" FROM
INTAKE OF MUA.
7. WORK IN PHASE 4. ACCU-1: HEAT PUMP
CONDENSING UNIT PROVIDED WITH FCU-2, AND
FCU-3. MOUNT ON EQUIPMENT RAILS ON NEW
ROOF OVER CONNECTOR ADDITION. COORDINATE
WITH NEW CONSTRUCTION. ROUTE WIRING,
REFRIGERANT PIPING, AND CONTROLS PER
MANUFACTURER'S RECOMMENDATIONS. ROUTE
EXPOSED PORTIONS IN METAL ENCLOSURE
FINISHED TO MATCH ADJACENT SURFACES.
8. ORIENT AIR INTAKE AWAY FROM EXHAUST FANS.
MAINTAIN MINIMUM 10' FROM EXHAUST FANS OR
PLUMBING VENTS.
PLAN NOTES:#
B M501
DAM DSJ
D M501
F M501
G M501
PTAC-1/PTAC-2
HARDWIRED CONNECTION
TO 265V 1PH POWER, SEE
ELECTRICAL DRAWINGS
WALL SLEEVE 13-3/4" DEEP
WITH INSULATION KIT
ALUMINUM
ARCHITECTURAL
GRILLE
EXTEND EXISTING
JUNCTION BOX, NEW WALL
FACE IN FUTURE PHASE,
SEE ELECTRICAL DRAWINGS
PROVIDE 30" TALL INSULATED
PRESSURE CURB IF REQUIRED FOR
SIDE DISCHARGEREFER TO "A"
SERIES DRAWINGS FOR FLASHING
REQUIREMENTS
ROOF DECK
18x28 SA
20x20 SA
DUCT ROOF SUPPORTS
LIKE "MIRRA" S6
2' -0
MUA
Ed inb ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M501
MECHANICAL
DETAILS
1. PROVIDE NEW WALL SLEEVE AND INSULATION KIT. SEAL
CASE TO WALL CONSTRUCTION PER MANUFACTURER
REQUIREMENTS.
2. PROVIDE EXTENDED DRAIN KIT WITH 3" HOSE
EXTENSION AND TURN-DOWN ELBOW.
3. PROVIDE TERMINAL STRIP FOR REMOTE THERMOSTAT
AND COVERPLATE FOR UNIT CONTROLS.
NOTES#
SCALE:
PTAC INSTALLATION SECTION
3/4" = 1'-0" A
INSULATED CURB
BY M.C.
NAILER BY M.C.
CURB COVER &
COUNTER FLASHING
BY M.C.
CANT BY G.C.
ROOFING BY G.C.
RUBBER CAP
FOR 2" TO 6"
SIZE LINES
RUBBER
BOOTS
STAINLESS STEEL
CLAMP FOR EACH BOOT
RUBBER CAP FOR
3/8" TO 2" SIZE
LINES
WEATHERTIGHT
SEAL
RUBBER
CURB COVER
CURB WITH
12"x12" I.D.
SCALE:
PIPE PENETRATION DETAIL
NONE
B
SECTION THRU CURB
DUCT PENETRATION THROUGH ROOF
RISER THROUGH ROOF
CONTINUOUS WELD
STORM COLLAR
SECURED TO DUCT
SECURE COUNTER
FLASHING
TO DUCT AND CAULK
2"X14" FRAME & NAILER
HOLE THROUGH ROOF
1" LARGER (BOTH
WAYS) THAN DUCTS
SEE PLAN FOR
DUCT CONTINUATION
ROOF LINE
FLEXIBLE SEALANT
HOT WATER FLUE
CONTINUOUS WELD
STAINLESS STEEL HOOD
WOOD NAILER
SQUARE CURB
BASE FLASHING
4"CANT STRIP
(IF REQUIRED)
ROOF DECK
PACKED INSULATION
SCALE:
ROOF PENETRATION DETAILS
NONE
C
SEE PLANS
FOR DUCT SIZE
PROVIDED HOLE
THROUGH ROOF
PRE-FAB CURB
FLASH AND
COUNTERFLASH
ALUMINUM
HOUSING
BACKDRAFT
DAMPER PROVIDED
WITH FAN
VERIFY ROOF
CONSTRUCTION
ALUMINUM
WIRE POST
BY UNIT
MANUFACTURER
1. MC SHALL VERIFY ACTUAL SIZES OF ROOF CURB, ROOF OPENING, AND
BACKDRAFT DAMPER FOR THE PARTICULAR FAN MANUFACTURER
SELECTED. COORDINATE THESE SIZES WITH ROOFING AND
STRUCTURAL CONTRACTORS.
2. FAN TO BE INSTALLED LEVEL.
3. DAMPER AND LINER ARE SAME SIZE (NOMINAL).
NOTES:
SCALE:
EXHAUST FAN INSTALLATION DETAIL
NONE
D
AIR FLOW
A
1/2" BALL VALVE & MANUAL AIR
VENT EXTENDED THROUGH INSULATION
OFFSET PIPE FOR COIL REMOVAL
BALL VALVE (TYP)
UNION (TYP)
P&T TAP (TYP)
STRAINER WITH BLOW DOWN
SUPPLY
RETURN
AUTOMATIC CONTROL VALVE
REDUCER AS REQUIRED (TYP)
CALIBRATED BALANCING VALVE
1/2" BALL VALVE MANUAL DRAIN
EXTENDED THROUGH INSULATION
FIRST UNION TO BE 12"
MINIMUM FROM HEADER
SCALE:
HYDRONIC COIL PIPING DIAGRAM - 2-WAY VALVE
NONE
E
DISCONNECT
BY UNIT
MANUFACTURER
SCALE:
EQUIPMENT ROOF SUPPORT DETAIL
NO SCALE
F
M
IN
0"
6" MIN
1/
2"
1. FOLLOW MANUFACTURERS RECOMMENDATIONS FOR
RIGGING, SUPPORT, AND INSTALLATION.
2. ARRANGE UNIT AND ACCESSORIES FOR MAINTENANCE
AND OPERATION CLEARANCE AND ACCESSIBILITY.
3. ORIENT UNIT TO MAINTAIN MIN. 10'-0" FROM ALL
EXHAUSTS, FLUES, PLUMBING VENTS ETC.
4. EXTEND ANY PLUMBING VENTS THAT ARE WITHIN 10' OF
INTAKE TO 10'-0" ABOVE ROOF. SUPPORT AT ROOF AND
STABILIZE WITH GUY WIRES.
5. ROUTE CONDENSATE DRAIN LINE(S) TO DIRECT
CONDENSATE TOWARDS ROOF DRAINS.
6. MOUNT REMOTE CONTROLS PANEL AT 5'-0" ABOVE
FINISHED FLOOR IN 2ND FLOOR MECHANICAL ROOM
BELOW UNIT.
NOTES#
SCALE:
ROOFTOP MUA INSTALLATION
None G
FLUE CAP FOR CONCENTRIC
VENT PROVIDED WITH DOMESTIC
WATER HEATERS - FOLLOW MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION
ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M601
MECHANICAL
SCHEDULES
ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
M701
HVAC
CONTROLS
DIAGRAMS
DAM DSJ
EA
SCALE:
GENERAL EXHAUST
NONE
ROOF
EF-1
MS CS BI-41
BO-41
1. GENERAL:
1.1. EXHAUST FAN SHALL BE CONTROLLED BY SPACE TEMPERATURE SENSOR.
1.1.1. ABOVE SETPOINT TEMPERATURE, FAN SHALL BE INDEXED ON.
1.1.2. WHERE SHOWN ON DRAWINGS, ASSOCIATED MOTORIZED DAMPER SHALL OPEN.
1.1.3. BELOW SETPOINT TEMPERATUER, FAN SHALL BE INDEXED OFF AND ASSOCIATED DAMPER (WHERE APPLICABLE
WILL CLOSE.
SEQUENCE OF OPERATIONS:
BINARY INPUT (BI)
BI: SPACE TEMPERATURE
BINARY OUTPUT (BO)
BO: MOTOR STARTER START/STOP
BDD
SEQUENCE OF OPERATIONS:
1. UNIT VENTILATOR TO HAVE INTERNAL CONTROLLER
WITH TERMINAL STRIP FOR REMOTE THERMOSTAT.
2. TERMINAL STRIP TO HAVE CAPABILITY FOR
OCCUPIED/UNOCCUPIED CONTROL, SETPOINT
CONTROL, OUTDOOR AIR DAMPER CONTROL,
STATUS AND ALARM OUTPUT.
3. INTERNAL CONTROLS TO MANAGE REVERSING
VALVE, REFRIGERANT CYCLE, AND FAN OPERATION.
SCALE:
PACKAGED TERMINAL AIR CONDITIONER/HEAT PUMP
NONE
EXTERIOR
WALL
PTAC
T
NEW LAY IN CEILING IN
CORRIDORS
NOTES
1. NEW WALL MOUNTED COMBINATION THERMOSTAT/HUMIDISTAT WITH CAPABILITY
FOR NETWORK CONNECTION TO NEW BAS. THERMOSTAT TO BE HARDWIRED TO
PTAC TERMINAL STRIP. BAS TO COMMUNICATE WITH PTAC THROUGH NETWORKED
THERMOSTAT TO CONTROL OCCUPIED/UNOCCUPIED MODE, SETPOINT ADJUSTMENT.
THERMOSTAT TO BE PROGRAMMABLE FOR LOCAL SETPOINT ADJUSTMENT WITHIN
OWNER SPECIFIED RANGE. THERMOSTAT TO REPORT TO BAS WITH UNIT STATUS,
SPACE TEMPERATURE AND HUMIDITY.
2. CONTROLS WIRING SHALL BE RUN FROM THERMOSTAT DOWN IN EXISTING STUD
WALL. ROUTE IN SURFACE MOUNTED RACEWAY AROUND TO PTAC UNIT. ROUTE
JUST ABOVE BASEBOARD AND COORDINATE WITH EXISTING SERVICES.
3. PROVIDE BLANKOFF PLATE FOR UNIT CONTROLS WITH LABEL STATING UNIT IS
CONTROLLED REMOTELY FROM THERMOSTAT.
TYPICAL
GUEST
ROOM
CORRIDOR
DDC POINTS LIST
TERMINAL STRIP
1. GENERAL:
1.1.1. EXHAUST FAN SHALL BE CONTROLLED BY A LINE VOLTAGE TIMER SWITCH - PROVIDED BY DIVISION 26.
1.1.2. EXHAUST FAN SHALL BE ON WHEN ACTIVATED BY TIMER SWITCH AND OFF AT END OF TIMER DURATION.
1.1.3. EXHAUST FAN CONTROLS ARE LOCAL AND ARE NOT TIED INTO BAS.
SEQUENCE OF OPERATIONS:
SCALE:
TOILET EXHAUST
NONE
BDD
CEILING EXHAUST FAN
TO BAS
ur gh
, In dia na
7 G atl ing S tre et
APRIL 16,
20039
Ca m p At te rb ur y J oin t M an eu ve r T ra ini ng C en te r (
CA
JM
TC
Re gio na l T ra ini ng
In sti tu te
B uil din g
Re no va tio n
Ph as e
P-FP001
PLUMBING & FIRE
PROTECTION
SYMBOLS,
ABBREVIATIONS, &
GENERAL NOTES
GENERAL SYMBOLS:
DEMOLITION NOTE
POINT OF REMOVAL
POINT OF CONNECTION
PLAN NOTE
NOTE: ALL SYMBOL DESCRIPTIONS ARE SUBJECT TO MODIFICATION ON THE DRAWINGS. ALL SYMBOLS NOT NECESSARILY USED ON THIS PROJECT.
PIPE ELBOW UP (RISER)
PIPE ELBOW DOWN
UNION
PIPE TEE DOWN
PIPE TURN 90°
CAP OR PLUG
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC
FLANGES
LINE BREAK
STEAM TRAP
PRESSURE SENSOR
BALL VALVE
VALVES & FITTINGS:
GLOBE VALVE
GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
REDUCED PRESSURE BACK FLOW PREVENTER
GAUGE
PLUMBING ABBREVIATIONS:
PIPE SLOPES IN DIRECTION OF ARROW
DOMESTIC HOT WATER RETURN
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE REMOVED
DOMESTIC COLD WATER
DOMESTIC HOT WATER
SANITARY VENT
INLINE PUMP
REVISION
THERMOMETER
PIPING DESIGNATIONS:
NEW PIPING
DETAIL BUBBLE
SECTION BUBBLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
AD ACCESS DOOR
AV ACID VENT
AW ACID WASTE
BDD BACK DRAFT DAMPER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BOS BOTTOM OF STEEL
BTU BRITISH THERMAL UNIT
CO CLEANOUT
CS CUP SINK
CSS CLINIC SERVICE SINK
CW DOMESTIC COLD WATER
D CONDENSATE/DRAIN
DB DRY BULB
DCV DOUBLE CHECK VALVE
DIA DIAMETER
DN DOWN
DWH DOMESTIC WATER HEATER
FD FLOOR DRAIN
ESEW EMERGENCY SHOWER AND FACE/EYE WASH
EW EMERGENCY EYE/FACE WASH
EL ELEVATION
ES EMERGENCY SHOWER
EXIST EXISTING
FCO FLOOR CLEANOUT
FLA FULL LOAD AMPS
HB HOSE BIBB
HKSP HOUSEKEEPING
HW DOMESTIC HOT WATER
HWR DOMESTIC HOT WATER RETURN
HWCP HOT WATER RECIRCULATION PUMP
IE INVERT ELEVATION
JS JANITOR SINK
LAV LAVATORY
MB MOP BASIN
NC NORMALLY CLOSED
NO NORMALLY OPEN
PIV POST INDICATING VALVE
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
RO REVERSE OSMOSIS
RPBP REDUCED PRESSURE BACKFLOW PREVENTER
SAN SANITARY
SH SHOWER
SI SEDIMENT INTERCEPTOR
SK SINK
SS STAINLESS STEEL
ST STORM WATER
TD TRENCH DRAIN
V SANITARY VENT
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WH WALL HYDRANT
A M-501
T
P
DOMESTIC HOT WATER 140°F RETURN
DOMESTIC HOT WATER 140°F
140°F
140°F
STORM PIPINGST
INDIRECT DRAIND
ACID WASTEAW
ACID VENTAV
DEIONIZED WATERDE
DISTILLED WATERDI
REVERSE OSMOSIS DEIONIZED WATERRODI
LAWN SPRINKLERLS
GASG
FUEL OIL SUPPLYFOS
FUEL OIL RETURNFOR
FUEL OIL VENTFOV
VACUUMVAC
COMPRESSED AIRA
SURGICAL VACUUM
SPECIALTY PIPING
MEDICAL VACUUMMV
SV
LAB VACUUMVAC
NITROGENN
NITROUS OXIDEN2O
CARBON DIOXIDECO2
ARGONAG
MEDICAL AIRMA
LAB AIRA
PRE-ACTION
FIRE PROTECTION PIPING SYMBOLS
FIRE PROTECTIONF
PA
FIRE DRY PIPEFDP
FIRE DEPARTMENT SIAMESE CONNECTION (FREE STANDING)
FIRE DEPARTMENT SIAMESE CONNECTION (WALL MOUNTED)
METER
FLOOR DRAINFD
VALVE IN VERTICAL PIPE
CONTROL VALVE
INDICATED FLOW DIRECTION
FLOW SWITCH
ZONE CONTROL VALVE WITH TAMPER SWITCH
TS
PENDENT SPRINKLER HEAD
CONCEALED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
M
WASTE PIPINGW
GENERAL NOTES:
1. CONTRACTOR TO VERIFY EXISTING CONDITIONS PRIOR TO BID AND
INCLUDE ALL COSTS IN BID.
2. REVIEW THE WORK OF OTHER TRADES, COORDINATE AND PLAN
WORK WITH THE OTHER TRADES AND OWNER. ADJUST AS A
RESULT OF COORDINATION.
3. STORE EQUIPMENT AND COMPONENTS IN A CLEAN, DRY LOCATION
UNTIL READY FOR INSTALLATION. PROTECT FROM WEATHER, DIRT,
WATER, AND CONSTRUCTION DEBRIS, ETC. AT ALL TIMES. ANY
DAMAGED EQUIPMENT OR COMPONENTS SHALL BE RESTORED AS
NEW OR REPLACED.
4. ALL MATERIALS REMOVED AND NOT RELOCATED BECOME THE
PROPERTY OF THE CONTRACTOR. REMOVE MATERIALS FROM THE
PROJECT SITE UNLESS NOTED OTHERWISE.
5. PATCH WALLS, FLOORS, CEILINGS, COLUMNS, ROOF
PENETRATIONS, ETC. WHERE ITEMS ARE REMOVED TO MATCH
ADJACENT SURFACES.
6. DRAWINGS SHOW THE INTENDED ARRANGEMENT AND ROUTING OF
ALL PIPING, EQUIPMENT, AND APPURTENANCES. THEY SHALL BE
FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION
AND WORK OF OTHER TRADES WILL PERMIT.
7. CLEAN ALL EQUIPMENT TO PRESENT A "LIKE NEW" CONDITION AT
PROJECT COMPLETION.
8. OFFSET PIPING AROUND ELECTRICAL PANELS TO PROVIDE
CLEARANCES AS REQUIRED BY THE NATIONAL ELECTRICAL CODE.
9. CONTRACTOR SHALL INCLUDE IN BID ALL CUTTING AND PATCHING
REQUIRED FOR INSTALLATION OF NEW WORK. CONCRETE WORK
TO BE PERFORMED BY THE GC AND PAID FOR BY THE
PLUMBING/MECHANICAL CONTRACTOR.
10. PIPING SHOWN IS FOR REFERENCE ONLY, CONTRACTOR SHALL
FIELD VERIFY ALL EXISTING PIPE LOCATIONS, ROUTING, SIZES AND
ETC.
11. CONTRACTOR SHALL MAKE REPAIRS TO SPRAY-ON FIRE PROOFING
AFTER MAKING HANGER ATTACHMENTS TO BUILDING STRUCTURE.
12. WORK IS TO BE PERFORMED IN PHASES SEE ARCHITECTURAL
DRAWINGS FOR PHASING OF WORK.
1. SYSTEM DESIGN IS PER NFPA 13, STANDARD FOR THE
INSTALLATION OF SPRINKLER SYSTEMS.
2. ALL WORK AND MATERIALS SHALL CONFORM TO NFPA 13, AND
STATE RULES AND REGULATIONS.
3. ALL MATERIALS, WHERE APPLICABLE SHALL BE U.L. LISTED AND
FACTORY MUTUAL APPROVED FOR THE USE IN AUTOMATIC
SPRINKLER SYSTEMS.
4. PROVIDE A MINIMUM OF 72 HOUR NOTICE TO THE OWNER PRIOR
TO SPRINKLER PIPE TESTING OR LINE PRESSURIZATION.
5. FIRE PROTECTION CONTRACTOR SHALL PREPARE ALL DRAWINGS
AND APPLICATIONS REQUIRED TO OBTAIN APPROVAL OF THE
SYSTEM BY OWNERS INSURANCE UNDERWRITER, STATE AND
LOCAL AUTHORITIES HAVING JURISDICTION. ALL DRAWINGS TO BE
SUBMITTED DURING CONSTRUCTION.
6. FIRE PROTECTION CONTRACTOR SHALL SUBMIT DRAWINGS WITH
ALL SPRINKLER HEAD LOCATIONS. ALL SPRINKLER HEADS TO BE
LAID OUT NEATLY WITHIN THE CEILING SYSTEMS AND BE
COORDINATED WITH ALL BULKHEADS, CEILINGS AND STRUCTURE.
7. CONTRACTOR TO VERIFY EXISTING CONDITION PRIOR TO BID.
8. REVIEW WORK OF OTHER TRADES, COORDINATE AND PLAN WORK
WITH THE OTHER TRADES AND OWNER. ADJUST AS A RESULT OF
COORDINATION.
9. STORE EQUIPMENT AND COMPONENTS IN A CLEAN, DRY LOCATION
UNTIL READY FOR INSTALLATION. PROTECT FROM WEATHER, DIRT,
WATER AND CONSTRUCTION DEBRIS, ETC. AT ALL TIMES. ANY
DAMAGED EQUIPMENT OR COMPONENTS SHALL BE RESTORED AS
NEW OR REPLACED.
10. ALL MATERIALS REMOVED AND NOT RELOCATED BECOME THE
PROPERTY OF THE CONTRACTOR. REMOVE MATERIALS FROM THE
PROJECT SITE UNLESS NOTED OTHERWISE.
11. DRAWINGS SHOW THE INTENDED ARRANGEMENT AND ROUTING OF
ALL PIPING AND EQUIPMENT. THEY SHALL BE FOLLOWED AS
CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND WORK OF
OTHER TRADES WILL PERMIT.
12. OFFSET PIPING AROUND ELECTRICAL PANELS TO PROVIDE
CLEARANCES AS REQUIRED BY THE NATIONAL ELECTRICAL CODE.
13. CONTRACTOR SHALL INCLUDE IN BID ALL CUTTING AND PATCHING
REQUIRED FOR INSTALLATION OF NEW WORK.
14. PIPING SHOWN IS FOR REFERENCE ONLY, CONTRACTOR SHALL
FIELD VERIFY ALL EXISTING PIPE LOCATIONS, ROUTING, SIZES AND
ETC.
15. WORK IS TO BE PERFORMED IN PHASES SEE ARCHITECTURAL
DRAWINGS FOR PHASING OF WORK.
16. REFER TO GENERAL NOTES ON DRAWING G101 FOR ADDITIONAL
INFORMATION.
17. REFER TO "SELECTIVE DEMOLITION" SPECIFICATION FOR
ADDITIONAL INFORMATION INCLUDING DISPOSAL AND RECYCLING.
FIRE PROTECTION GENERAL NOTES:
GENERAL USE COLD WATERGCW
GENERAL USE HOT WATERGHW
NON POTABLE WATERNP
DEIONIZED WATERDIW
EFD EXISTING FLOOR DRAIN
ECO EXISTING CLEAN OUT
1. REPLACE ALL SPRINKLER HEADS THROUGH OUT THE ENTIRE BUILDING.
2. MOVE SPRINKLER HEAD LOCATIONS IN CORRIDORS AND COMMONS AREAS AND ALL
DEFINED WORK AREAS TO AVOID CONFLICT WITH NEW CEILING GRID. PHASE I
3. ADJUST HEADS IN CORRIDOR AND COMMONS AREAS TO FINAL CEILING HEIGHT.
PHASE I
4. ADD SPRINKLERS TO THE ADA ENTRY CONNECTOR CORRIDOR. PHASE I
5. INSPECT THE ENTIRE SPRINKLER SYSTEM INCLUDING PRESSURE TESTING, MAKE
NECESSARY REPAIRS AND RECERTIFY THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .