This statement of work and related solicitation describe a firm fixed-price construction contract to renovate the west wing of Building 6 at Camp Atterbury in Edinburgh, Indiana. The scope of work includes selective demolition of interior walls, floors, plumbing and electrical systems on the first and second floors. It also requires new construction of interior walls, installation of new plumbing fixtures and bathroom exhaust, tile flooring with epoxy grout in bathrooms, repair of concrete ceilings and floors, new hallway doors and flooring, preparation and finishing of all surfaces, and execution of refuse and recycling in accordance with environmental requirements. The contract duration is 270 days with a pre-bid conference scheduled for September 9, 2020 and bid opening on September 25, 2020. The North American Industry Classification System code is 236220 and the magnitude of construction is between $1,000,000 to $5,000,000. The solicitation sets this opportunity aside 100% for small businesses. The Department of the Army National Guard will award a single firm fixed-price contract.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLY TO

ATTENTION OF

NGIN-CAC-PW February 26, 2020

CAMP ATTERBURY

JOINT MANEUVER TRAINING CENTER

POST OFFICE BOX 5000

EDINBURGH, INDIANA 46124

Statement of Work

BUILDING 6 RENOVATION – PHASE IV

CAJMTC DPW #2020-001

INTRODUCTION

1. Project Number and Title: (DPW #2020-001) B6-RENO_PH-IV

2. Facility Function: This Bid Build project consists of improvements that are required for renovation to southernmost wing of the Regional Training Institute (RTI). Building 6 is located behind Building 5 which is south of Headquarters Road within the cantonment area at Camp Atterbury Joint Maneuver Training Center (CAJMTC). This project is situated in Johnson County, Nineveh Township, Camp Atterbury, Indiana (CAIN) and serves as billeting quarters for transient training.

The project duration period of performance is 270 calendar days. This is a lump sum lowest responsible bid contract, and award will be subject to availability of funds.

3. Scope: The purpose of this Statement of Work (SOW) is to provide Bid Build services for the scope of work and is provided to convey the OWNER’s intent, when used in conjunction with the Construction Drawings and Technical Specifications as well as applicable Code Compliance, which provides a comprehensive document to be used for contractual bidding, and construction operations. This project requires the CONTRACTOR to provide supervision, coordination, materials, tools, equipment, and labor required to complete the following work.

a. Phase 4: No exterior work is included in this phase. Interior work includes work on the first and second floor in the West wing of the building. Demolition work in the identified Room Groups Types “A”, includes selected walls, resilient floor tile, ceramic tile, ceilings, plumbing systems, selected fire protection systems and selected electrical systems, including replacement of the fire alarm system and all lighting fixtures. Demolition work in corridors 1-W and 2-W includes the flooring and wall base. New construction includes corridors 1-W and 2-W finishes as well as work in the identified Room Groups Type “A” . Work in Room Groups Type “A” includes selected walls, ceilings, flooring, doors, door frames, casework and signage. New mechanical and electrical work includes removal of selected plumbing fixtures, revision of bathroom exhaust system components and selected electrical system components, including replacement of lighting fixtures. See the drawings for additional Phase 4 work.

Note: Balance of the facility that is not part of Phase IV will remain occupied by the client for billeting purposes. The CONTRACTOR will be required to coordinate with the RTI

SOW – B6 RENO PH IV

26FEB2020

Facility Manager for agreed upon hours of construction operations, as well as prior contact with twenty-four notice to coordinate performance of work that will entail considerable noise levels.

4. Project Overview: The CONTRACTOR will supply all labor, materials and equipment to:

a. Notify Facility Manager of any remaining items considered Government Property left in vicinity of Phase IV prior to commencement of the Project.

b. Prepare Temporary Protection, and Maintain During Construction Sequences.

c. Perform Selective Demolition for Performance of Work applicable Disciplines.

d. Perform remediation in areas as identified in the Contract Documents.

e. Furnish and Install New Sanitary Piping.

f. Replace Portions of Concrete Slab on Grade.

g. Perform Interior Build-Out.

h. Furnish and Install New Plumbing.

i. Retrofit Existing and Provide New Exhaust.

j. Retrofit Existing and Provide New Electrical.

k. Prep Existing and Provide New Doors/ Hollow Metal Frames

l. Repair Existing Substrates and Prepare Interior Finishes.

m. Provide Final Finishes.

n. Install New Lighting.

o. Provide New Door Hardware.

p. Install Government Furnished Materials : Plaques as shown on Sheet A106 - Signage Plan

q. Perform Final Cleaning

r. Compile Final Close-out Documents

4A. Options: N/A

5. References: work shall be in accordance with (IAW) the most current edition of all applicable codes and standards including but not limited to:

a) Indiana Building Code (INBC)

b) National Electrical Code (NEC).

c) National Fire Protection Agency requirements (NFPA).

d) American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)

e) Sheet Metal and Air Conditioning Contractors National Association (SMACNA)

f) Indiana Plumbing Code (IPC)

g) American National Standards Institute (ANSI)

h) American Concrete Institute (ACI)

i) American Steel Institute (ASI)

j) Applicable sub-section listings as itemized in the Project Specifications

6. General Project Requirements: Unless otherwise indicated, this is to be designed in accordance with and adherence to the Project Specifications and Drawings, all Federal, State, local laws; regulations, rules and codes, to include OSHA, IOSHA, AFOSH, and to abide by all installation policies, guidelines and procedures including, but not limited to, the general contract provisions given below. In case of conflict between this SOW and references, the contractors bidding the work are to forward the conflict to the Contracting Officer for resolution.

7. Attachments: Work will be predicated upon government furnished information, provided to the CONTRACTOR for construction purposes. The CONTRACTOR shall receive the requisite information from the OWNER consisting of the following.

a. PDF Drawings:

A000 - Cover Page

1) G101 - Index, General Information

2) G102 - Work Phase Plan

3) AD101 - Existing Conditions & Demo: 1st Floor

4) AD102 - Existing Conditions & Demo: 2nd Floor

5) A101 - First Floor Plan

6) A102 - Second Floor Plan

7) A103 - Reflected Ceiling Plan; 1st Floor

8) A104 - Reflected Ceiling Plan; 2nd Floor

9) A105 - Roof Plan - Note : (Not Applicable on Phase IV)

10) A106 *- Signage Plan (Government Furnished Materials)

11) A201 - Building Exterior Elevations

12) A202 - Building Courtyard Elevations

13) A301 - Wall Sections & Details

14) A401 - Room Elevations and Enlarged Plans

15) A601 - Room Finish Schedules Phases 1-3

16) A602 - Rm Finish Phases 4-5

17) A603 - Door Schedule & Details

18) S101 - Structural Plan

19) M001 - Mechanical Symbols & General Notes

20) M101 - HVAC Demo Plan; 1st Floor - Demo Note 2 (Qty. 12) Phase IV

21) M102 - HVAC Demo Plan; 2nd Floor - Demo Note 2 (Qty. 12) Phase IV

22) M301 - HVAC Plan; 1st Floor - Plan Note 2 (Qty. 10) Plan Note 3 (Qty. 20) Phase IV

23) M302 - HVAC Plan; 2nd Floor - Plan Note 2 (Qty. 8) Plan Note 3 (Qty. 16) Phase IV

24) M303 - Roof Mechanical Plan - Note : (Not Applicable on Phase IV)

25) M501 - Mechanical Details - Note : (Not Applicable on Phase IV)

26) M601 - Mechanical Schedules - Exhaust Fan CEF-1 (Qty. 36) Phase IV

27) M701 - HVAC Controls Diagram - Toilet Exhaust Switch (Qty. 36) Phase IV

28) P-FP001 - Fire Protection & General Notes

29) P101 - Plumbing Demo Plan; 1st Floor - Demo Note 2 & 3 Phase IV

30) P102 - Plumbing Demo Plan; 2nd Floor - Demo Note 1 & 2 Phase IV

31) P301 - Plumbing Plan; Foundation - Plan Notes 1, 3-8 Phase IV

32) P302 - Plumbing Plan; 1st Floor - Plan Notes 1-5 Phase III

33) P303 - Plumbing Plan; 2nd Fl.- Plan Notes 1-5

34) P304 - Plumbing Plan; Roof - Note : (Not Applicable on Phase IV)

35) P501 - Plumbing Details

36) P601 - Plumbing Schedules

37) E001 - Electrical Symbols & General Notes

38) E101 - Electrical Demo Plan; 1st Floor

39) E102 - Electrical Demo Plan; 21nd Floor

40) E301 - Lighting Plan; 1st Floor - Plan Note 6 Phase IV

41) E302 - Lighting Plan; 21nd Floor - Plan Note 6 Phase IV

42) E303 - Power & System Plan; 1st Floor - Plan Note 11 Reference

Rooms 177 & 179, Sheet E301) Phase IV

43) E304 - Power & System Plan; 2nd Floor - Plan Note 11 Reference

Rooms 177 & 179, Sheet E301) Phase IV

44) E305 – Electrical Plan; Roof - Note : (Not Applicable on Phase IV)

45) E501 – Electrical Schedule & Details - Note : (Fire Alarm Riser Not Applicable

Phase IV)

(*) Indicates not released within RFP Set of Drawings

b. Technical Specification

c. AF 66 Form (Submittal Schedule)

d. Environmental Appendix A

e. Construction Debris Report Appendix B

8. Submittals: The CONTRACTOR shall prepare submittals using form AF 3000 in accordance with the AF 66 Form provided, as identified within the itemized subsections in the Statement of Work, and as required by specifications. Digital files of drawings to be electronically transmitted in .pdf or .dwg format, and product literature, technical specifications or supplemental data to be submitted in .pdf or MS Word format. Hard copies of submissions are acceptable providing three sets are transmitted with the AF3000. Digital drawing files in AutoCAD may be requested through DPW COR/COTR if required

9. General Contract Provisions: The CONTRACTOR shall be required to adhere to installation standard policies as described below:

Environmental/Cultural Issues:

a. The CONTRACTOR must comply with all cultural resource laws and regulations, including the National Historic Preservation Act and the Archaeological Resource Protection Act. If any discovery of an archaeological artifact or features such as but not limited to structure foundations, pier stones, old glassware and ceramic ware, old building remnants, Indian arrowheads, Indian axe heads (adzes), stone tools, crock ware, metal objects, etc. or human remains while performing the work outlined here the CONTRACTOR will immediately cease all work within 30 yards of the area of the discovery and contact the CA-DPW-ENV. Ground disturbance may only resume under the direction of the CA-DPW-ENV.

b. The CONTRACTOR shall be responsible for obtaining and complying with NPDES, Rule 5 Erosion control permits. The CONTRACTOR will obtain all required permits prior to the initiation of construction. All fees associated with permitting shall be at the CONTRACTOR's expense.

c. No open fires will be allowed without coordination with the CA-DPW-ENV.

Construction and Demolition:

a. Construction and Demolition: Excess material resulting from excavation, demolition, and construction which is not identified to remain or be salvaged, shall be removed from the installation and relocated by the CONTRACTOR. At a minimum, recyclable construction and demolition debris that are taken offsite shall be diverted from the non-hazardous solid waste stream (reused/recycled) IAW IC 13-20-25 and Executive Order 13514.

b. Environmental Requirements: The CONTRACTOR will be in compliance with all Federal, State, and Local laws, regulations, policies and procedures to include air, water, and solid waste requirements, and shall research and prepare necessary permit applications.

Effective 23MAR2016 Atterbury-Muscatatuck has adopted the requirements set forth in FAR 52.223-9 and 52.223-10. The CONTRACTOR shall perform demolition work that complies with this waste reduction initiative, maintain accurate logs related to construction debris, and assemble associated documentation required for close-out procedures on for this project.

All disposal weights shall be provided by the CONTRACTOR to DPW COR via tipping fees or disposition receipts throughout the course of the project. Copies are to be maintained by the CONTRACTOR and log to assemble final tabulation at the end of the project.

Reference Appendix B - C&D Report under separate cover

(812) 526-1499 x.62060

(812) 526-1499 x.61812

SOW – B6 RENO PH V

POINTS OF CONTACT:

IN ARNG COTR

IN ARNG COR

IN ARNG Owner

CIV Jeff Kernodle

CPT Gary Huffman

MAJ Chris Johanningsmeier (812) 526-1499 x.61252

Division 1 - General Conditions

Warranty: The CONTRACTOR shall guarantee the material and workmanship for a minimum of one (1) year following the date of substantial completion. (Substantial completion is defined as completed to a point where the OWNER is able to beneficially occupy the site.) Equipment warranties are limited to original OEM warranties.

MATOC References: The CONTRACTOR will abide by contract procedures for clauses such as the following

•52.236-1 -- Performance of Work by the Contractor.

•52.236-2 -- Differing Site Conditions.

•52.236-3 -- Site Investigation and Conditions Affecting the Work.

•52.236-4 -- Physical Data.

•52.236-5 -- Material and Workmanship.

•52.236-6 -- Superintendence by the Contractor.

•52.236-7 -- Permits and Responsibilities.

•52.236-8 -- Other Contracts.

•52.236-9 -- Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

•52.236-10 -- Operations and Storage Areas.

•52.236-11 -- Use and Possession Prior to Completion.

•52.236-12 -- Cleaning Up.

•52.236-13 -- Accident Prevention.

•52.236-14 -- Availability and Use of Utility Services.

•52.236-15 -- Schedules for Construction Contracts.

•52.236-16 -- Quantity Surveys.

•52.236-17 -- Layout of Work.

•52.236-18 -- Work Oversight in Cost-Reimbursement Construction Contracts.

•52.236-19 -- Organization and Direction of the Work.

•52.236-21 -- Specifications and Drawings for Construction.

•52.236-27 -- Site Visit (Construction)

Note: CONTRACTOR shall field verify all given information, if discrepancies are apparent please address through formal request for information process during pre-bid period.

Division 2 – Site Work: N/A

Construction Forms/Permits: The CONTRACTOR is responsible for the submission of all permit documentation, design requirements, and fees applicable to the construction of Phase IV.

Division 3 -- Concrete:

Refer to Specifications Manual Section 033000 – Cast in Place Concrete

Division 4 -- Masonry:

4.1 N/A

Division 5 -- Metals:

Refer to Specifications Manual Section 055000 – Metal Fabrications

5.1. All steel framing and supports shall be fabricated/installed in accordance with construction drawings.

Division 6 -- Wood & Plastic:

Refer to Specifications Manual Sections 061000 – Rough Carpentry 062023 – Interior Finish Carpentry 064116 – Plastic Laminate-Faced Architectural Cabinets.

Division 7 – Thermal and Moisture Protection:

Refer to Specifications Manual Sections 072100 – Thermal Insulation 079200 – Joint Sealants 079219 – Acoustical Joint Sealants

Division 8 - Openings:

Refer to Specifications Manual Sections 081113 – Hollow Metal Doors and Frames 081416 – Flush Wood Doors 083113 – Access Doors and Frames 087100 – Door Hardware 088000 – Glazing 088300 – Mirrors

Division 9 – Finishes:

Refer to Specifications Manual Sections 092216 – Non-Structural Metal Framing 092900 – Gypsum Board 093000 – Tiling 095113 – Acoustical Panel Ceilings 096513 – Resilient Base and Accessories 096519 – Resilient Tile Flooring 099123 – Interior Painting

SOW – B6 RENO PH IV

Division 10 – Specialties:

Refer to Specifications Manual Sections 102800 – Toilet, Bath, and Laundry Accessories

Division 11 – Equipment:

N/A

Division 12 – Furnishings:

Refer to Specifications Manual Sections 123661 – Simulated Stone Countertops

Division 13 – Special Construction:

13.1 N/A

Division 14 – Conveying Systems:

14.1 N/A

Division 21 – Fire Protection:

Refer to Specifications Manual Sections 210517 – Sleeves and Sleeve Seals for Fire-Suppression Piping 210518 – Escutcheons for Fire-Suppression Piping 210553 – Identification for Fire-Suppression Piping and Equipment 211313 – Wet-Pipe Sprinkler Systems

Division 22 – Plumbing:

Refer to Specifications Manual Sections 220513 – Common Motor Requirements for Plumbing Equipment 220517 – Sleeves and Sleeve Seals for Plumbing Piping 220518 – Escutcheons for Plumbing Piping 220519 – Meters and Gages for Plumbing Piping

220523.12 – Ball Valves for Plumbing Piping

220523.13 – Butterfly Valves for Plumbing Piping

220523.14 – Check Valves for Plumbing Piping 220529 – Hangers and Supports for Plumbing Piping and Equipment 220553 – Identification for Plumbing Piping and Equipment 220719 – Plumbing Piping Insulation 221116 – Domestic Water Piping 221119 – Domestic Water Piping Specialties

221123.21 – Inline, Domestic-Water Pumps 221316 – Sanitary Waste and Vent Piping 221319 – Domestic Water Piping Specialties

221319.13 – Sanitary

224213.13 – Commercial Water Closets

224216.13 – Commercial Lavatories 224223 – Commercial Showers

SOW – B6 RENO PH IV

Division 23 – Heating, Ventilation and Air Conditioning:

N/A

Division 26 – Electrical:

Refer to Specifications Manual Sections 260500 – Common Work Results – Electrical 260510 – Electrical Demolition 260519 – Low-Voltage Electrical Power Conductors & Cables 260526 – Grounding and Bonding for Electrical Systems 260529 – Hangers and Supports for Electrical Systems 260533 – Raceways and Boxes for Electrical Systems 260544 – Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260553 – Identification for Electrical Systems 260580 – Equipment Wiring Systems 260923 – Lighting Control Devices 262726 – Wiring Devices 262813 – Fuses 262816 – Switches and Circuit Breakers 262913 – Manual and Magnetic Motor Controllers 262923 – Variable Frequency Motor Controllers 265119 – LED Interior Lighting 265213 – Emergency and Exit Lighting

Division 28 – Electronic Safety and Security:

Refer to Specifications Manual Sections 283111 – Fire Alarm

Contractor Manpower Reporting The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau (NGB) via a secure data collection site. The contractor shall completely fill in all required data fields using the following web address: https://www.sam.gov Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at https://www.sam.gov .

File details come from the government source that posted it. Updated .