Bldg 2 - 1st Floor Piping.pdf
PDF 1 MB Posted
- Solicitation number
- 520-22-3-7072-0001
About this file
This document includes a federal solicitation for repair services on elevators in multiple buildings at the Biloxi, Mississippi Veterans Affairs Medical Center. The solicitation seeks all labor, tools, materials, equipment, and supervision necessary to perform repair work associated with Project No. 520-22-170. The work will involve elevators located in various buildings at the facility. Interested parties should respond to Solicitation Number 520-22-3-7072-0001 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16. The response due date and anticipated award date are not provided in the document.
View the file
Other files
Show 40 more
Latest 50 of 79 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S SS S
S SS S
S SS
S S
S S
S
S
S S
S
S SS
S S
S
S
S
S S
S
S S
S S
S
S SS S S
S SS
S SS
S S
S S
S S
S S
S S
S S
S S
S S
S SS
S S
S S
S SS
S SS
S SS
SS
S SS S S
S SS S S
S S
S S
S SS
S SS
S S
S S
S SS S
S SS S
S SS
S S
S S
S
S
S S
S
S SS
S S
S
S
S
S S
S
S S
S S
S
S SS S S
S SS
S SS
S S
S S
S S
S S
S S
S S
S S
S S
S SS
S S
S S
S SS
S SS
S SS
SS
S SS S S
S SS S S
S S
S S
S SS
S SS
S S
S S
P-528
P-103 P-103
P-104P-204
P-420
3"
FD-C
3"
FD-C
P-502
3"
FD-C
P-528
P-103
P-104
3"
FD-C
P-420
P-420
P-604
P-420
P-420 3"
FD-C
P-204
P-103
P-604
3"
FD-C
3” SS DN..
2 1/2" SV DN..
2 1/2" SV DN..
2 1/2" SV DN..
1" SS DN..
3” SV
UP/DN..
4” SV UP/DN..
4” SV UP/DN..
3” SV
UP/DN..
3” SV
UP/DN..
4” SV UP/DN..
3" SS
UP/DN..
3" SS
UP/DN..
4" SS DN..
4" SS UP.
4" SS UP/DN..4" SS UP/DN..
3" SS UP/DN..
EXISTING
4" FD
EXISTING
4" FD
EXISTING
4" FD
EXISTING
4" FD
EXISTING
2" FD
4” SS DN..
4” SS UP..
HR - OFFICE OF CHIEF
1B109
HR OFCR
1B109B
ASST HR OFCR
1B109A
HR - WORK FORCE
DEVELOPMENT
1B108
WF DEV SUPR
1B108C
STORAGE/FILE
1B108A
CONSULT
1B107
HR - PROCESSING & RECORDS
1B105
CONSULT
1B106 CONSULT
1B104
CONSULT
1B103
MECH
1B119
CONSULT
1B118
CORRIDOR F
C1-6
CONSULT
1B117
CONSULT
1B116
SUPR HR SPECIALIST
1B115A
HR - PIV
1B114
STORAGE/FILE
1B113
CORRIDOR E
C1-7
BREAK ROOM
1B111
EXIST WEST VESTIBULE
1B110
WEST STAIR
S1-3
HR - RECRUITMENT &
PLACEMENT
1B115
HR - ER/LR
1B102
LOBBY
1B100
STORAGE/FILE
1B102A
HAC
1B101
CORRIDOR A
C1-1
VESTIBULE
1A100
OFFICE
1A101A
OFFICE
1A101B
WOMEN
1B121
MEN
1B120
EXIST MECH
1B123
CORRIDOR D
C1-5
EXIST MECH
1B122
EXIST ELEC
1A123
CENTRAL STAIR
S1-1
ELEC GEAR
1A122C
EXIST ELEC
1A122
ELEC
1A122B SECURITY
1A122A
COMM
1A120
FAMILY RESTROOM
1A121
SUPPLY
1A117
SUPERVISOR EMS
1A115A
E N
G
IN
E E
R
IN
G S
T O
R A
G E
A
EMS WORKROOM
1A115
EMS EQUIPMENT
1A114
SOILED UTILITY
1A113
OFFICE
1A110E
COMPLIANCE OFFICER
1A110D
PRIVACY/ COMPLIANCE/ ISO
1A110
PRIVACY/FOIA
1A110C
EAST STAIR
S1-2
CORRIDOR C
C1-3 BREAK ROOM
1A109
STORAGE/FILE
1A110B
INFO SECURITY OFFICER
1A110A
CONSULT
1A111
EXIST EAST VESTIBULE
1A108
EEO OFFICE
1A107WAITING
1A106
EQUIPMENT STORAGE
1A105
ICE MACHINE
1A101E
MEDICINE
1A101D
IMD SUPPLY
1A101C
CONFERENCE
1A103
CONSULT
1A102
MEN
1A119
WOMEN
1A118
CORRIDOR G
C1-4
MECH
1A112
HBPC OFFICE
1A101
STORAGE
1A104A
MANAGER
1A107A
FILE/COPY
1A107B
CONFERENCE
1A104
STORAGE
1A107C
CORRIDOR B
C1-2
UNASSIGNED OFFICE
1B112
HR SPEC (SUPV)
1B102B
2 1/2" SV2 1/2" SV
2 1/2" SV
3" SS
3"
FD-M
3” SS UP.
2” SV UP.
2" SV
2" SV
3" SS
C.O.C.O.
C.O.
4" SS
4" SS
KEYED NOTES:
1. COORDINATE FINAL LOCATION OF FD WITH LOCATION OF
ICE MACHINE.
Architect Project No.
DESIGN BUILD TEAM:CONSULTANTS:
Drawing Title:
Approved: Project Director
Project Title:
Location:
Date Checked Drawn
Drawing Number
Building Number
Project Number
Revisions: Date Dwg. of
Office of Construction and Facilities ManagementVAMC BILOXI, MISSISSIPPI
8 97654321
F
E
D
C
B
A
8 97654321
VA FORM 08-6231, OCT 1978
o n e e ig h t in c h o n e fo o t o n e q u a r te r in c h o n e fo o t th r e e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th r e e q u a r te r s in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th r e e in c h e s o n e fo o t
520.317U
1 - STRUCTURAL UPGRADES 2017 03 16
RECORD
DRAW
IN
GS
224ADPDHWNovember 2, 2021
1409 / 14-021
BUILDING 1 & 2 RENOVATIONS1ST FLOOR - SANITARY
PL251
1/8" = 1'-0"PL251
1 1ST FLOOR - SANITARY
N O
R T
H
GENERAL NOTES:
A. SEE PLUMBING CONTRACTOR "AS BUILTS"
DATED 07/09/21 FOR MORE DETAILED
INFORMATION ON SANITARY LAYOUT.
| Sheets |
| PL151 - 1ST FLOOR - PLUMBING |
| PL250 - CRAWLSPACE - SANITARY |
| PL251 - 1ST FLOOR - SANITARY |
| PL254 - ATTIC - SANITARY |
| PL555 - OVERALL SANITARY RISER |
| PL557 - OVERALL WATER RISER |
File details come from the government source that posted it. Updated .