About this file

This document outlines supplemental contract requirements for combatting COVID-19 for the Department of Veterans Affairs. Contractors performing work at VA facilities must ensure their employees comply with documentation requirements to show proof of vaccination or negative COVID-19 test results. Contractor employees are also subject to daily COVID-19 screening protocols and may be denied entry if they fail screening. Contractors must notify the contracting officer if contract performance is impacted due to denied facility entry. Additionally, the related federal contract opportunity is a solicitation for elevator repair services at multiple buildings in Biloxi, Mississippi under Solicitation Number 520-22-3-7072-0001.

View the file

Other files

File Type Posted
Bldg 19 - Floor Plan.pdf PDF
Bldg 30 - Crawl Space Piping Area A.pdf PDF
Bldg 17 - Basement Piping.pdf PDF
010000 GENERAL REQUIREMENTS.docx DOCX document
Bldg 2 - Crawlspace Piping.pdf PDF
Bldg 14 - 1st Floor Piping.pdf PDF
096800 CARPET and FLOORING.doc DOC document
260533 - Raceway and Boxes for Electrical Systems.doc DOC document
024100 Demolition.doc DOC document
36C25622R0089 EXHIBIT B R1.docx DOCX document
Bldg 3 - Basement Piping.pdf PDF
262726 WIRING DEVICES.doc DOC document
Bldg 2 - Floor Plan.pdf PDF
013323 Samples and Shop Drawings.doc DOC document
Bldg 25 - Sump Pump-Pit Detail.pdf PDF
Bldg 2 - Crawlspace Piping Original.pdf PDF
Bldg 53 - Floor Plan.pdf PDF
260511 - Requirements for Electrical Installations.doc DOC document
Bldg 14 - Sump Pump-Pit Detail.pdf PDF
Bldg 15 - Floor Plan.pdf PDF
Bldg 5 - Floor Plan.pdf PDF
36C25622R0089 Solicitation.pdf PDF
Bldg 28 - 1st Floor Piping.pdf PDF
P09 Final SOW 520-22-170 Repair Elevators Multiple Bldgs.docx DOCX document
Bldg 15 - Foundation Piping.pdf PDF
Bldg 1 - Basement Piping Area C.pdf PDF
Bldg 1 - Basement Piping Original.pdf PDF
36C25622R0089 EXHIBIT A R1.docx DOCX document
Bldg 30 - Sump Pump-Pit Detail.pdf PDF
Bldg 53 - Basement Piping.pdf PDF
Bldg 3 and 30 - Floor Plan.pdf PDF
078400 FIRE STOPPING.doc DOC document
Bldg 17 - Floor Plan.pdf PDF
Bldg 1 - Floor Plan.pdf PDF
220511 COMMON PLUMBING WORK RESULTS.doc DOC document
013526 Safety Requirements.doc DOC document
Bldg 30 - Crawl Space Piping Composite.pdf PDF
Bldg 30 - 1st Floor Piping Area A.pdf PDF
Bldg 30 - 1st Floor Piping Area B.pdf PDF
Bldg 1 - Basement Piping Area A-B.pdf PDF
260521 - Low Voltage Conductors and Cables.doc DOC document
Bldg 1 - 1st Floor Piping Area A-B.pdf PDF
Bldg 19 - 1st Floor Piping Original.pdf PDF
079200 JOINT SEALANTS.doc DOC document
Bldg 25 - 1st Floor Piping Area A.pdf PDF
Bldg 28 - Sump Pump-Pit Detail.pdf PDF
Bldg 5 - 1st Floor Piping.pdf PDF
ICRA - Contracting Only.pdf PDF
265100 INTERIOR LIGHTING.doc DOC document
Bldg 30 - 1st Floor Piping Composite.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, contractors shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

Last Updated on Friday, April 22, 2022

File details come from the government source that posted it. Updated .