BIR_9500-052P-2019.pdf
PDF 2 MB Posted
- Attached to
- WA NPS BP OLYM 2019(2) Olym Bridge Preservation
- Solicitation number
- 69056722B000002
About this file
This document contains a bridge inspection report and related federal contract opportunity for bridge preservation work. The bridge inspection report provides details on the existing conditions of Structure No. 9500-052P, the New Barnes Creek Bridge in Olympic National Park, including photos and assessments of the deck, superstructure, substructure, channel, and approaches. Recommended maintenance and rehabilitation work includes debris removal, concrete repairs, and addressing erosion issues. The related federal contract opportunity is solicitation number 69056722B000002 for bridge preservation projects in Olympic National Park, with an opportunity type of sealed bid. The work includes unspecified preservation tasks on bridges within Clallam, Grays Harbor, and Jefferson Counties in Washington State, to be completed on a firm fixed price basis. The Department of Transportation Federal Highway Administration is the contracting agency.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
john.davis Sticky Note Marked set by john.davis
STRUCTURE SUMMARY STRUCTURE NO. 9500-052P
NEW BARNES CREEK BRIDGE (LAKE CRESCENT) INSPECTION DATE: 8/28/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER
# OF BEAMS, MAIN SPAN: .. 4
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE
WEARING SURFACE: .......... NONE
ABUT. FOUNDATIONS: ........ UNKNOWN
PIER FOUNDATION(S): ........ N/A
ABUTMENT / PIER MAT'L: ... CONCRETE
PROJ./PLAN REF. NO:
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2013 - APPROACHES RESURFACED.
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
80.5 FT (24.5 M)
80.5 FT (24.5 M)
35.1 FT (10.7 M)
30.6 FT (9.3 M)
N/A
0 °
NO
LOCATION
OLYMPIC NATIONAL PARK MILE POINT: ..................... 227.90 (KM PT 366.76)
STATE: ................................. WASHINGTON LOCATION: 19.5 mi W of Port Angeles on Hwy 101 (MP
227.9).FACILITY CARRIED: ............ U.S. ROUTE 101
FEATURE INTERSECTED: .. BARNES CREEK
STRUCTURE EVALUATION SUMMARY
This prestressed concrete multi-girder bridge is in good condition overall and has only minor structural problems at this time. However, the channel flow has continued to migrate toward the west abutment, resulting in moderate channel bank erosion downstream. The slope has been protected with riprap, but the riprap has moved toward the east bank as the channel has shifted.
Other problems include flood debris in the upstream and downstream channel, debris in the expansion joints, damage to the guard angle at the west deck joint, and moss/vegetation growth throughout the structure.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. HENSLEY, D. LEHMANN
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/25/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-052P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.2,5,6,7 REMOVE DEBRIS FROM DECK EXPANSION JOINTS AND ALONG CURBLINES.
REMOVE MOSS AND VEGETATION GROWTH FROM STRUCTURE.
1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
61.4 REMOVE FLOOD DEBRIS FROM UPSTREAM AND DOWNSTREAM
CHANNEL.
1 LS
58.2, 222.4 REPAIR SPALLED CONCRETE AT LOCATION OF MISSING JOINT
ANGLE AT WEST END OF DECK.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis
FIELD INSPECTION REPORT STRUCTURE NO. 9500-052P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(VEGETATION)
G G N N N G N N G
N G
G N G G N G N G G G G N
N N N N N N N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1,10 MINOR ABRASION OF DECK SURFACE; SEVERAL MINOR SPALLS AND
POPOUTS THROUGHOUT. HEAVY MOSS GROWTH ON DECK FACES.
MINOR CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF
SOUTH OVERHANG BELOW CURB JOINT AND NORTH OVERHANG
NEAR EAST ABUTMENT.
SMALL TREES GROWING AGAINST SOUTHWEST AND NORTHEAST
CORNERS.
58.2 HEAVY DEBRIS ACCUMULATION IN DECK EXPANSION JOINTS.
JOINT ANGLE BROKEN OFF AT WHEEL LINE OF WESTBOUND LANE
AND ALL OF EASTBOUND LANE, WEST END OF DECK; MINOR
SPALLING OF EXPOSED CONCRETE. MINOR DAMAGE TO
BACKWALL ANGLE.
58.5,6 MODERATE ACCUMULATION OF DEBRIS WITH MOSS AND
VEGETATION GROWTH ON CURBS, RAILINGS, AND IN CURB JOINTS.
58.7 DROP INLETS IN SHOULDERS AT WEST APPROACH. MINOR DEBRIS
WITH VEGETATION GROWTH ALONG CURBLINES.
59.2 GIRDERS #1 AND #2 AT WEST ABUTMENT BEAR ON FRONT CORNER
OF BEARING SEAT; SEE 60.3.
MINOR STAINING AND EFFLORESCENCE OF GIRDER WEBS AT
ISOLATED LOCATIONS. BIRD NESTS ON BOTTOM FLANGE OF
GIRDERS AT INTERMEDIATE DIAPHRAGMS.
59.6 ABUTMENT DIAPHRAGM AT EAST ABUTMENT ONLY.
60.1,6 HEAVY MOSS GROWTH ON WINGWALLS AND SIDE OF ABUTMENTS.
60.3 MINOR SPALL BELOW GIRDER #1 AT WEST ABUTMENT WHERE
GIRDER TOUCHES BEARING SEAT.
N G G G G N
G
F
G
G
FIELD INSPECTION REPORT STRUCTURE NO. 9500-052P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
F F G F N
HIGH
SUFF
6 FT.
SAND, STONES
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N F G G G G F N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
60.4 MINOR VERTICAL, HORIZONTAL, AND DIAGONAL CRACKING OF
BACKWALLS WITH EFFLORESCENCE. MINOR HORIZONTAL
CRACKING OF TOP SURFACE OF BACKWALLS.
60.9 MINOR EROSION ALONG WEST ABUTMENT WINGWALLS.
60.11, 61.1,2,3
RIPRAP PRESENT AT WEST ABUTMENT; STREAM FLOWS AGAINST
BOTTOM OF ABUTMENT SLOPE AND WEST DOWNSTREAM CHANNEL
BANK. MODERATE SLOUGHING OF BANK AT BOTTOM OF WEST
ABUTMENT SLOPE. SEVERE SLOUGHING ALONG WEST
DOWNSTREAM CHANNEL BANK WITH UNDERMINING OF TREES.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.4 HEAVY FLOOD DEBRIS ACCUMULATION IN DOWNSTREAM CHANNEL;
MODERATE IN UPSTREAM CHANNEL.
222.7 OBJECT MARKERS AT BRIDGE CORNERS. "BARNES CREEK" SIGN AT
WEST APPROACH; MISSING AT EAST APPROACH.
222.8 MODERATE CURVE AT WEST APPROACH.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 9500-052P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 26 24 33 30
HS 36 33 44 40
TYPE 3 34 31 57 52
TYPE 3S2 43 39 72 65
TYPE 3-3 49 44 81 73
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 3/16
LOAD RATING CONTROLLED BY: ENGINEERING JUDGMENT
REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE
EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-052P
STRUCTURE IDENTIFICATION
(201) PARK: OLYMPIC NATIONAL PARK
(202) STRUCTURE NAME: .......... NEW BARNES CREEK BRIDGE (LAKE CR
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 9500-052P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ...
(207) ROAD SECTION NO: ..........052P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......NO
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:
(21) MAINTAINED BY: ................. 01 - STATE HIGHWAY AGENCY
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
530 - WASHINGTON (WA)
009 - CLALLAM
121001010
BARNES CREEK
U.S. ROUTE 101
9500052P0000000
19.5 mi W of Port Angeles
99.99 FT (99.99 M)
227.90 (KM PT 366.76)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
02 - STRINGER/MULTI-BEAM or GIRDER
80.5 FT (24.5 M)
80.5 FT (24.5 M)
0 - UNKNOWN
0 - UNKNOWN
6 - N/A
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 44.0 TONS (39.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE:
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-052P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 48°03'18.10"
(17) LONGITUDE: ......................... 123°47'37.80"
(19) DETOUR LENGTH: ............... 0 MI (0 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
30.6 FT (9.3 M)
35.1 FT (10.7 M)
32.0 FT (9.8 M)
24.0 FT (7.3 M)
4.0 FT (1.2 M)
4.0 FT (1.2 M)
0 - NO MEDIAN
0 °
NO
30.6 FT (9.3 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
2.33 FT (0.71 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
D - MINOR
TBD
TBD
TBD
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2013 - APPROACHES RESURFACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://123�47'37.80 https://48�03'18.10 john.davis
APPENDIX STRUCTURE NO. 9500-052P
PHOTOGRAPHS STRUCTURE NO. 9500-052P
PHOTO #1 - LOOKING WEST (AHEAD) TOWARD FORKS
FLOW
PHOTO #2 - NORTH (DOWNSTREAM) SIDE
PHOTO #3 - LOOKING EAST (BACK) TOWARD PORT ANGELES
PHOTO #4 - SOUTH (UPSTREAM) SIDE
PHOTO #5 - GENERAL VIEW OF DECK LOOKING EAST
PHOTO #6 - GENERAL VIEW OF DECK LOOKING WEST
PHOTO #7 - TYPICAL SCALING OF DECK WITH EXPOSED AGGREGATE
PHOTO #8 - GENERAL VIEW ABUTMENT #1 EXPANSION JOINT LOOKING
NORTH; NOTE DEBRIS IN JOINT
PHOTO #9 - GENERAL CONDITION ABUTMENT #2; NOTE BROKEN JOINT
HEADER LOOKING SOUTH
PHOTO #10 - GENERAL UNDERSIDE VIEW LOOKING WEST
PHOTO #11 - TYPICAL MAP CRACKING IN UNDERSIDE OF DECK; SOUTH
BAY NEAR ABUTMENT #1 SHOWN
PHOTO #12 - GENERAL UNDERSIDE VIEW OF SOUTH OVERHANG
LOOKING WEST
PHOTO #13 - GENERAL UNDERSIDE VIEW OF NORTH OVERHANG
LOOKING WEST
PHOTO #14 - TYPICAL GIRDERS BEARING ON ABUTMENT SEAT AT
ABUTMENT #2
PHOTO #15 - GENERAL VIEW ABUTMENT #1
PHOTO #16 - TYPICAL CRACKING WITH EFFLORESCENCE IN
ABUTMENT #1 BACKWALL, BETWEEN GIRDERS #2 AND #3 SHOWN;
NOTE DEBRIS ACCUMULATION AT BEARING SEAT AREA
PHOTO #17 - CRACKING WITH EFFLORESCENCE IN ABUTMENT #1
BACKWALL; BETWEEN GIRDERS #2 AND #3 SHOWN
PHOTO #18 - GENERAL VIEW ABUTMENT #2
PHOTO #19 - TYPICAL CRACKING WITH EFFLORESCENCE IN
BACKWALL ABUTMENT #2, BETWEEN GIRDERS #1 AND #2
PHOTO #20 - SPALL ON ABUTMENT #2 BEARING SEAT BELOW GIRDER
#1; NOTE GIRDER BEARS ON FRONT CORNER OF BEARING SEAT
PHOTO #21 - GENERAL CONDITION OF CONCRETE CURB AND
PARAPET; SOUTH PARAPET SHOWN, LOOKING WEST; NOTE TYPICAL
MOSS GROWTH
PHOTO #22 - APPROACH LOOKING EAST (BACK) TOWARD PORT
ANGELES
PHOTO #23 - APPROACH LOOKING WEST (AHEAD) TOWARD FORKS
PHOTO #24 - TYPICAL APPROACH GUARDRAIL WITH RUBBER
BLOCKOUTS; SOUTHEAST APPROACH GUARDRAIL SHOWN
PHOTO #25 - VIEW FROM BRIDGE LOOKING SOUTH (UPSTREAM)
PHOTO #26 - VIEW FROM BRIDGE LOOKING NORTH (DOWNSTREAM);
NOTE LARGE TREE DEBRIS IN DOWNSTREAM CHANNEL
PHOTO #27 - LOOKING SOUTH (UPSTREAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #28 - LOOKING NORTH (DOWNSTREAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #29 - EROSION OF NORTHWEST EMBANKMENT ADJACENT TO
DOWNSTREAM CHANNEL