This solicitation package seeks proposals for bridge preservation work in Olympic National Park. The scope of work includes repairs and maintenance of bridges located in Clallam, Grays Harbor, and Jefferson counties in Washington state. The fixed price contract will be awarded by the Department of Transportation Federal Highway Administration. The solicitation includes plans, specifications, and inspection data files for bridges requiring work. Proposals are due by the date listed on the Standard Form 1442 included in the package. The work must be completed within the performance period defined in the contract.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
john.davis Sticky Note Marked set by john.davis
STRUCTURE SUMMARY STRUCTURE NO. 9500-019P
BIG CREEK BRIDGE (QUINAULT) INSPECTION DATE: 8/22/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
CONCRETE CONTINUOUS
BOX GIRDER - SINGLE or SPREAD
CONCRETE CAST-IN-PLACE
NONE
N/A
SPREAD FOOTING ON PILES
N/A / CONCRETE
104(2) / RG2519
2 - CONNECTOR ROAD
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
135.0 FT (41.1 M)
87.0 FT (26.5 M)
23.5 FT (7.2 M)
20.0 FT (6.1 M)
N/A
15 °
NO
LOCATION
OLYMPIC NATIONAL PARK MILE POINT: ..................... 9.92 (KM PT 15.96)
STATE: ................................. WASHINGTON LOCATION: 10.7 MI. NE OF JCT. HWY. 101 (MP
128.7) AND NORTH SHORE ROAD. FACILITY CARRIED: ............ NORTH SHORE ROAD
FEATURE INTERSECTED: .. BIG CREEK
STRUCTURE EVALUATION SUMMARY
This concrete box girder "bobtail" cantilever bridge is in good condition overall. The main structural problem at this time is cracking with efflorescence on the sides of the box girder at the piers. This cracking is not considered a serious matter at this time, and no repairs are deemed necessary. However, this condition will continue to be monitored during future inspection cycles.
Corrective measures for other problems should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. HENSLEY, D. LEHMANN
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/25/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-019P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.9 PERIODICALLY REMOVE VEGETATION / TREES FROM ALONG ALL BRIDGE
CORNERS.
1 LS
58.7 PERIODICALLY REMOVE DEBRIS ACCUMULATION FROM ALONG CURBLINES. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis
FIELD INSPECTION REPORT STRUCTURE NO. 9500-019P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N G N N N G N N G
N G
N G G G F N
N
N
G
G
58.1 MINOR ABRASION OF DECK SURFACE WITH EXPOSED AGGREGATE.
SHALLOW SPALL ON DECK SURFACE NEAR MIDSPAN OF CENTER
SPAN.
MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF DECK OVERHANGS, MAINLY AT PIERS. MINOR
VERTICAL CRACKING WITH EFFLORESCENCE ON EXTERIOR FACES
OF DECK, MAINLY AT PIERS, ABUTMENTS, AND DECK DRAINS.
58.5 MINOR MOSS GROWTH ON CURBS AND RAILINGS.
58.6 MINOR SPALLING ON NORTHEAST PARAPET END. MINOR
COLLISION SCRAPES ON NORTHWEST PARAPET. SOUTHWEST
CORNER BENCHMARK MISSING.
58.7 BOX GIRDER DRAINS ARE CLEAR; MINOR LEAKAGE AT DRAIN IN
EAST SPAN NEAR EAST PIER.
59.2 MINOR VERTICAL, DIAGONAL, AND HORIZONTAL CRACKING WITH
EFFLORESCENCE ON EXTERIOR FACE OF BOX GIRDER WEBS IN
VICINITY OF PIERS, ESPECIALLY SOUTH WEB AT EAST PIER.
MINOR HONEYCOMBING OF BOX GIRDER UNDERSIDE IN SEVERAL
LOCATIONS; MINOR EFFLORESCENCE ON CENTER SPAN NEAR
EAST PIER. PATCHING ON BOX GIRDER UNDERSIDE IN SEVERAL
LOCATIONS. MINOR LONGITUDINAL CRACKING WITH
EFFLORESCENCE ON BOX GIRDER UNDERSIDE IN EAST SPAN.
60.4 MINOR HORIZONTAL CRACKING OF EAST ENDWALL, BOTH SIDES.
60.6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON
WINGWALLS. MINOR TO MODERATE VEGETATION GROWTH ALONG
NORTHWEST WINGWALL.
1. BREASTWALLS OR COLUMNS N
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION N
11. SLOPE PROTECTION G
12. OTHER (DEBRIS) F
PIER(S)
G13. WALLS AND/OR COLUMNS
N14. PILE BENTS
N15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
G17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 9500-019P
ITEM REFERENCE AND REMARKS
61. CHANNEL 6
1. ALIGNMENT F
2. EROSION AND/OR SCOUR F
3. CHANNEL PROTECTION F
4. WATERWAY OBSTRUCTIONS F
5. OTHER N
6. ADEQUACY OF OPENING SUFF
7. NORMAL VELOCITY MED
8. AVERAGE CLEAR OPENING 5 FT.
9. STREAM BED COMPOSITION :
GRAVEL, COBBLE
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (VEGETATION)
N N N G G G G G P
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
60.11, 61.1,2,3
MAIN CHANNEL FLOW IS ALONG WEST UPSTREAM CHANNEL BANK
TOWARD WEST PIER; PIER IS PROTECTED BY RIPRAP. RIPRAP
SLOPE PROTECTION ALSO ON WEST ABUTMENT SLOPE.
MODERATE EROSION (5' DEEP) ALONG WEST UPSTREAM CHANNEL
BANK; SEVERAL UNDERMINED ALDER TREES NEAR END OF RIPRAP.
TREE LODGED ON WEST SLOPE AT WEST ABUTMENT.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.4 SEVERAL FALLEN TREES ALONG EAST DOWNSTREAM CHANNEL
BANK.
222.7 TYPE 3 OBJECT MARKERS AT BRIDGE CORNERS.
222.9 HEAVY VEGETATION GROWTH ALONG BRIDGE AT ALL CORNERS.
TREE ENCROACHING NE CORNER.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 9500-019P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 22 20
HS 36 33 40 36
TYPE 3 22 20 25 23
TYPE 3S2 32 29 36 33
TYPE 3-3 36 33 40 36
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 3/20
LOAD RATING CONTROLLED BY: ENGINEERING JUDGEMENT
REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE
EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-019P
STRUCTURE IDENTIFICATION
(201) PARK: OLYMPIC NATIONAL PARK
(202) STRUCTURE NAME: .......... BIG CREEK BRIDGE (QUINAULT)
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 9500-019P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 104
(207) ROAD SECTION NO: ..........019P
(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................104(2)
(212) DRAWING NUMBERS: ....... RG2519
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
530 - WASHINGTON (WA)
031 - JEFFERSON
161001040
BIG CREEK
NORTH SHORE ROAD
9500019P0000000
10.7 MI. NE OF JCT. HWY.
99.99 FT (99.99 M)
9.92 (KM PT 15.96)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
87.0 FT (26.5 M)
135.0 FT (41.1 M)
6 - N/A
6 - N/A
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 40.0 TONS (36.3 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-019P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 47°32'08.30"
(17) LONGITUDE: ......................... 123°45'31.40"
(19) DETOUR LENGTH: ............... 4 MI (6 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
20.0 FT (6.1 M)
23.5 FT (7.2 M)
21.0 FT (6.4 M)
15.0 FT (4.6 M)
3.0 FT (0.9 M)
3.0 FT (0.9 M)
0 - NO MEDIAN
15 °
NO
20.0 FT (6.1 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
2.25 FT (0.69 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
1 - MAINTENANCE
D - MINOR
TBD
TBD
TBD
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 & #3 Length 23.5', Span #2 - Length 88'; Type 105 (Conc. Box Beam) https://123�45'31.40 https://47�32'08.30 john.davis
APPENDIX STRUCTURE NO. 9500-019P
PHOTOGRAPHS STRUCTURE NO. 9500-019P
PHOTO #1 - LOOKING EAST (AHEAD)
FLOW
PHOTO #2 - NORTH (UPSTREAM) SIDE
PHOTO #3 - GENERAL VIEW LOOKING WEST (BACK) TOWARD US RTE
PHOTO #4 - SOUTH (DOWNSTREAM) SIDE
PHOTO #5 - GENERAL VIEW OF DECK, LOOKING EAST
PHOTO #6 - TYPICAL ABRASION OF DECK SURFACE WITH EXPOSED
AGGREGATE; EAST SPAN SHOW
PHOTO #7 - TYPICAL ABRASION OF DECK SURFACE WITH EXPOSED
AGGREGATE; WEST SPAN SHOWN , LOOKING NORTH
PHOTO #8 - GENERAL UNDERSIDE VIEW WEST SPAN, LOOKING WEST
PHOTO #9 - GENERAL UNDERSIDE VIEW CONCRETE BOX; MAIN SPAN
SHOWN, LOOKING WEST
PHOTO #10 - GENERAL UNDERSIDE VIEW OF EAST SPAN, LOOKING
TOWARD EAST ABUTMENT
PHOTO #11 - CRACKING UNDERSIDE OF CONCRETE BOX WITH
MOISTURE STAINING; EAST MID-SPAN SHOWN, LOOKING EAST
PHOTO #12 - LONGITUDINAL CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF BOX GIRDER; UPSTREAM SIDE, EAST SPAN, LOOKING
EAST
PHOTO #13 - TYPICAL VERTICAL, DIAGONAL AND HORIZONTAL
CRACKING WITH EFFLORESCENCE ON EXTERIOR FACE OF BOX
GIRDER WEBS NEAR PIERS; SOUTH SIDE SHOWN AT EAST PIER
PHOTO #14 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE NEXT TO DECK DRAIN PIPE ALONG UNDERSIDE OF
NORTH OVERHANG, NEAR WEST ABUTMENT SHOWN
PHOTO #15 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE NEXT TO DECK DRAIN PIPE ALONG UNDERSIDE OF
SOUTH OVERHANG SHOWN
PHOTO #16 - TYPICAL TRANSVERSE CRACKING WITH
EFFLORESCENCE UNDERSIDE DECK OVERHANG; SOUTH OVERHANG,
MID-SPAN OF MAIN SPAN SHOWN
PHOTO #17 - GENERAL VIEW WEST ABUTMENT
PHOTO #18 - GENERAL VIEW PIER 1, WEST FACE SHOWN
PHOTO #19 - GENERAL VIEW OF PIER 1, EAST FACE SHOWN
PHOTO #20 - GENERAL VIEW PIER 2, WEST FACE SHOWN
PHOTO #21 - GENERAL VIEW PIER 2, EAST FACE SHOWN
PHOTO #22 - GENERAL VIEW EAST ABUTMENT
PHOTO #23 - GENERAL CONDITION NORTH (UPSTREAM) RAIL,
LOOKING EAST
PHOTO #24 - GENERAL CONDITION SOUTH (DOWNSTREAM) RAIL,
LOOKING EAST
PHOTO #25 - GENERAL CONDITION SOUTH (DOWNSTREAM) RAIL,
LOOKING WEST; NOTE DEBRIS ACCUMULATION IN CURBLINE
PHOTO #26 - TYPICAL MOSS GROWTH ON OUTSIDE FACE OF
CONCRETE PARAPET; SOUTH (DOWNSTREAM) PARAPET
SHOWN,NEAR EAST ABUTMENT
PHOTO #27 - WEST APPROACH LOOKING WEST (BACK) TOWARD US
RTE 101
PHOTO #28 - GENERAL CONDITION WEST APPROACH, LOOKING
NORTH
PHOTO #29 - EAST APPROACH LOOKING EAST (AHEAD)
PHOTO #30 - GENERAL CONDITION OF EAST APPROACH, LOOKING
NORTH
PHOTO #31 - VIEW FROM BRIDGE LOOKING NORTH (UPSTREAM)
PHOTO #32 - VIEW FROM BRIDGE LOOKING SOUTH (DOWNSTREAM)
PHOTO #33 - LOOKING NORTH (UPSTREAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #34 - LOOKING SOUTH (DOWNSTREAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #35 - DEBRIS RESTRICTING CHANNEL AT NORTH (UPSTREAM)
SIDE OF PIER
PHOTO #36 - EROSION AT NORTHWEST EMBANKMENT
PHOTO #37 - HEAVY VEGETATION GROWTH AT SOUTHWEST
EMBANKMENT