BIR_9500-023P-2019.pdf
PDF 4 MB Posted
- Attached to
- WA NPS BP OLYM 2019(2) Olym Bridge Preservation
- Solicitation number
- 69056722B000002
About this file
This solicitation package seeks bids for bridge preservation work on multiple structures located in Olympic National Park. The work includes repairing and rehabilitating concrete elements, bearings, expansion joints, and other components on bridges throughout Clallam, Grays Harbor, and Jefferson Counties in Washington State. Bids are due by July 15, 2019 with award anticipated by August 15, 2019. The fixed price contract will be awarded to the lowest priced, responsive, and responsible bidder. The National Park Service is the contracting agency. Accompanying documents provide project plans, specifications, and physical data files on the bridges.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
john.davis Sticky Note Marked set by john.davis
STRUCTURE SUMMARY STRUCTURE NO. 9500-023P
QUINAULT RIVER BRIDGE INSPECTION DATE: 8/22/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
P/S CONCRETE CONTINUOUS
BOX GIRDER - SINGLE or SPREAD
CONCRETE CAST-IN-PLACE
NONE
PILE BENT
SPREAD FOOTING ON PILES
CONCRETE
UNKNOWN / RG1993
2 - CONNECTOR ROAD
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
328.0 FT (100.0 M)
164.0 FT (50.0 M)
29.8 FT (9.1 M)
24.0 FT (7.3 M)
N/A
0 °
NO
LOCATION
OLYMPIC NATIONAL PARK MILE POINT: ..................... 12.70 (KM PT 20.44)
STATE: ................................. WASHINGTON LOCATION: 12.7 MI. NE OF JCT. HWY. 101 (MP
125.5) AND SOUTH SHORE ROAD. FACILITY CARRIED: ............ NORTH SHORE ROAD
FEATURE INTERSECTED: .. QUINAULT RIVER
STRUCTURE EVALUATION SUMMARY
This prestressed concrete box girder bridge is in satisfactory condition overall. The main structural problem at this time is widespread minor diagonal and longitudinal cracking of the sides of the box girder. In addition, rust staining on the underside of the box girder near the south abutment indicates possible water intrusion through the deck. To help prevent further water intrusion, the deck should be sealed with a silane or siloxane sealant. The condition of the box girder concrete will continue to be monitored during future inspection cycles. Scaling of the pier concrete at the water line is significant enough to expose two rebars; consideration should be giving to patching this area and armoring the leading edge of the pier to prevent future scaling/abrasion losses.
Another problem that should continue to be monitored is settlement of fill beneath the north abutment cap, which exposes piles beneath the cap.
Other problems noted include several large logs and a tree lodged against the pier, minor debris accumulation at the curbline ends, spalling with exposed rebar on the sidewalk near the middle of the south span, and an up to 18" drop-off at the sidewalk ends.
INSPECTION TEAM: J. HENSLEY, D. LEHMANN
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/25/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-023P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
61.4 REMOVE FLOOD DEBRIS FROM PIER. 1 LS
58.7 PERIODICALLY REMOVE DEBRIS FROM ENDS OF CURBLINES AND DECK DRAINS. 1 LS
PRELIM. MAINTENANCE TOTAL : $6,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.1 CLEAN AND SEAL DECK SURFACE WITH APPROVED
SILANE/SILOXANE SEALANT TO HELP PREVENT WATER INTRUSION.
1 LS
60.13 PATCH PIER CONCRETE SCALING AND ARMOR TO RESIST FUTURE
SCALING LOSS.
1 LS
222.6 REDUCE DROP-OFF AT SIDEWALK ENDS WITH STEPS OR RAMP. 1 LS
60.13 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis
FIELD INSPECTION REPORT STRUCTURE NO. 9500-023P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6 ITEM REFERENCE AND REMARKS
F1. DECK SLAB
N2. EXPANSION JOINTS
N3. WEARING SURFACE
G4. RIDEABILITY
G5. CURBS, SIDEWALKS, AND MEDIAN
G6. PARAPETS AND/OR RAILINGS
F7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 6
N1. BEARING DEVICES
F2. GIRDERS OR BEAMS
N3. ARCH(ES) OR SLAB(S)
N4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
N6. DIAPHRAGMS AND BRACING
N7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
N11. OTHER
58.1 MINOR TO MODERATE ABRASION OF DECK SURFACE WITH
EXPOSED AGGREGATE. SEVERAL PATCHED AREAS IN DECK
SURFACE OVER PIER. MODERATE MOSS GROWTH ON DECK
FACES. MINOR DIAGONAL CRACKING WITH EFFLORESCENCE ON
DECK UNDERSIDE AT BRIDGE CORNERS.
58.5 SIDEWALK ON EAST SIDE; CURB ON WEST SIDE. WIDESPREAD
MINOR SCALING, DELAMINATION, AND SPALLING THROUGHOUT.
MODERATE MOSS GROWTH ON CURB AND SIDEWALK. WSDOT
SURVEY MARKER ON SIDEWALK NEAR PIER. MODERATE SPALLING
WITH EXPOSED REBAR AND DETERIORATED CONCRETE ON
SIDEWALK NEAR MIDSPAN OF SOUTH SPAN.
58.6 WEATHERING STEEL BRIDGE RAILINGS. MINOR MOSS AND LICHEN
GROWTH ON STEEL RAILINGS.
58.7 MINOR DEBRIS ACCUMULATION AT ENDS OF CURBLINES. SEVERAL
DECK DRAINS PARTIALLY CLOGGED. MINOR MOSS AND
VEGETATION GROWTH IN CURB AND SIDEWALK JOINTS.
MODERATE RUSTING OF SOUTHEAST BOX GIRDER DRAIN.
60. SUBSTRUCTURE 6
ABUTMENTS
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS G
4. BACKWALLS AND/OR BULKHEADS G
5. FOUNDATIONS (PILES) G
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR F
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION G
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS F
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR G
18. SETTLEMENT OR DEFLECTION G
19. OTHER N
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G G G P N
HIGH
SUFF
12 FT.
GRAVEL, ROCK
222. APPROACHES 6
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N G G F F G F N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2 SOUTH SPAN:
TIMBER EMBEDDED IN BOX GIRDER WEB ON D/S SIDE AT SOUTH
END OF BRIDGE, NEAR TOP OF WEB.
MINOR RUST STAINING AT SEVERAL LOCATIONS ON UNDERSIDE OF
BOX GIRDER NEAR SOUTH ABUTMENT WITH MINOR
DETERIORATION OF CONCRETE; SMALL HOLE ON UNDERSIDE NEAR
EACH EDGE WITH WATER LEAKAGE AND RUST STAINING.
HONEYCOMBING IN SEVERAL LOCATIONS ON UNDERSIDE OF BOX
GIRDER, SOUTH SPAN.
NORTH SPAN:
FULL-LENGTH LONGITUDINAL CRACKING ON D/S SIDE OF BOX
GIRDER ALONG TOP OF WEB IN NORTH SPAN.
WIDESPREAD MINOR SPALLING ALONG D/S BOTTOM EDGE OF BOX
GIRDER NEAR NORTH ABUTMENT.
WIDESPREAD MINOR LONGITUDINAL CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF BOX GIRDER IN NORTH SPAN.
TRANSVERSE CRACKS WITH EFFLORESCENCE ON UNDERSIDE OF
BOX GIRDER IN NORTH SPAN.
BOTH SPANS:
FULL-LENGTH LONGITUDINAL CRACKING ON BOTH U/S AND D/S
SIDES OF BOX GIRDER ALONG BOTTOM CONSTRUCTION JOINT;
SEVERAL LOCATIONS WITH EFFLORESCENCE.
WIDESPREAD MINOR DIAGONAL CRACKING ON SIDES OF BOX
GIRDER NEAR ABUTMENTS; SOME CRACKS EXTEND INTO
BACKWALLS AND OVERHANGS.
MINOR MAP CRACKING OF SURFACE COATING THROUGHOUT BOTH
SIDES OF BOX GIRDER.
AREA (3'X3') OF HONEYCOMBING WITH 6" LENGTH OF REBAR
EXPOSED ON UNDERSIDE OF BOX GIRDER AT D/S SIDE OF PIER.
60.3 MINOR DIAGONAL CRACK WITH EFFLORESCENCE ON NORTH
ABUTMENT CAP BELOW EAST SIDE OF BOX GIRDER.
60.4 2"X4" VOID FROM PIECE OF TIMBER FROM CONSTRUCTION AT WEST
SIDE OF NORTH BACKWALL; MINOR HORIZONTAL CRACKING OF
BACKWALL AT THIS LOCATION. SEE ALSO 60.6.
60.6 MINOR CRACKING OF NORTHEAST WINGWALL WITH
EFFLORESCENCE. MINOR HORIZONTAL CRACK ALONG
CONSTRUCTION JOINT IN SOUTH WINGWALLS EXTENDING INTO
BACKWALL.
ADDITIONAL ITEM REFERENCE AND REMARKS
60.9 FULL LENGTH SETTLEMENT OF FILL BENEATH NORTH ABUTMENT CAP EXPOSES 6" OF PILES
60.11 RIPRAP PROTECTION IN PLACE AT ABUTMENT SLOPES.
60.13 MODERATE TO SEVERE SCALING (3" DEPTH) OF PIER CONCRETE WITH TWO EXPOSED REBARS ON EAST SIDE
OF PIER.
60.17, 61.4 SHEET PILING LEFT IN PLACE IN VICINITY OF PIER. LARGE ROCK IN CHANNEL JUST UPSTREAM OF PIER;
LOCATION OF ROCK MAY CONTRIBUTE TO SCOUR AT PIER DURING PERIODS OF HIGH FLOW. LOGS AND DEBRIS CAUGHT IN OLD BRIDGE FOUNDATION IN CHANNEL UNDER BRIDGE ALONG SOUTH BANK. SEVERAL LARGE LOGS
LODGED AGAINST ROCK AND PIER.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
222.4,5 ASPHALT PAVEMENT AT NORTH APPROACH. MODERATE EROSION (2'L X 2'W X 1'D) DUE TO ROADWAY RUNOFF AT END OF BOTH WINGWALLS ON NORTH APPROACH; UNDERMINING 18"L X 2"H X 20" UNDER AT END OF WEST
WINGWALL, UNDERMINING 6"L X 3"H X 10" UNDER AT END OF EAST WINGWALL.
SOIL AND GRAVEL SURFACING AT SOUTH APPROACH.
222.6 MINOR SETTLEMENT (UP TO 1.50") OF NORTH APPROACH. UP TO 20" DROP-OFF AT BOTH SIDEWALK ENDS.
222.7 TYPE 3 REFLECTIVE OBJECT MARKERS AT BRIDGE CORNERS.
222.8 T-INTERSECTION AT SOUTH APPROACH.
36.B,C,D APPROACH RAILING IS NOT ATTACHED TO BRIDGE RAILING. NORTHWEST APPROACH GUARDRAIL HEIGHT AS LOW AS 1'-6" DOES NOT MEET AASHTO MINIMUM HEIGHT SPECIFICATION OF 2'-3" FOR TRAFFIC BARRIERS.
STRUCTURE LOAD RATING STRUCTURE NO. 9500-023P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 41 37 94 85
HS 44 40 97 88
TYPE 3 43 39 96 87
TYPE 3S2 48 44 102 93
TYPE 3-3 52 47 105 95
DESIGN LOADING: HS15 (MS13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 1/16
LOAD RATING CONTROLLED BY: FULL SECTION
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-023P
STRUCTURE IDENTIFICATION
(201) PARK: OLYMPIC NATIONAL PARK
(202) STRUCTURE NAME: .......... QUINAULT RIVER BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 9500-023P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 105
(207) ROAD SECTION NO: ..........023P
(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................UNKNOWN
(212) DRAWING NUMBERS: ....... RG1993
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
530 - WASHINGTON (WA)
031 - JEFFERSON
161001050
QUINAULT RIVER
NORTH SHORE ROAD
9500023P0000000
12.7 MI. NE OF JCT. HWY.
99.99 FT (99.99 M)
12.70 (KM PT 20.44)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
6 - P/S CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
164.0 FT (50.0 M)
328.0 FT (100.0 M)
4 - PILE BENT
4 - PILE BENT
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 3 - HS15 (MS13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 44.0 TONS (39.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 97.0 TONS (88.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-023P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 47°31'59.60"
(17) LONGITUDE: ......................... 123°40'41.90"
(19) DETOUR LENGTH: ............... 4 MI (6 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
24.0 FT (7.3 M)
29.8 FT (9.1 M)
40.0 FT (12.2 M)
28.0 FT (8.5 M)
4.0 FT (1.2 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
0 °
NO
24.0 FT (7.3 M)
0.0 FT (0.0 M)
2.9 FT (0.9 M)
1 - FULL HEIGHT (NO PARAPE
4 - STEEL
1 - CONTINUOUS RAIL
3.13 FT (0.95 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
D - MINOR
TBD
TBD
TBD
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 & #2 Length 63'; Type 605 (Post Tensioned) https://123�40'41.90 https://47�31'59.60 john.davis
APPENDIX STRUCTURE NO. 9500-023P
PHOTOGRAPHS STRUCTURE NO. 9500-023P
PHOTO #1 - LOOKING NORTH (AHEAD)
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - LOOKING SOUTH (BACK) TOWARD SOUTH SHORE ROAD
PHOTO #4 - WEST (DOWNSTREAM) SIDE
PHOTO #5 - GENERAL DECK VIEW LOOKING NORTH
PHOTO #6 - TYPICAL ABRASION OF DECK SURFACE WITH EXPOSED
AGGREGATE; SOUTH SPAN SHOWN, LOOKING EAST
PHOTO #7 - PATCHED AREAS IN DECK SURFACE OVER PIER, LOOKING
WEST
PHOTO #8 - GENERAL UNDERSIDE VIEW SOUTH SPAN, LOOKING
NORTH
PHOTO #9 - GENERAL UNDERSIDE VIEW CONCRETE BOX; NORTH
SPAN SHOWN, LOOKING SOUTH TOWARD PIER
PHOTO #10 - GENERAL UNDERSIDE VIEW CONCRETE BOX, SOUTH
SPAN LOOKING NORTH
PHOTO #11 - TYPICAL CRACKING WITH EFFLORESCENCE, OUTSIDE
EDGE OF CONCRETE BOX; NORTH SPAN SHOWN , NEAR NORTH
ABUTMENT
PHOTO #12 - TYPICAL CRACKING ON UNDERSIDE CONCRETE BOX;
UNDERSIDE NORTH SPAN SHOWN,LOOKING SOUTH
PHOTO #13 - TYPICAL CRACKING WITH EFFLORESCENCE ON
UNDERSIDE CONCRETE BOX GIRDER, NORTH SPAN SHOWN
PHOTO #14 - CRACKING WITH RUST STAINING AT DECK DRAIN,
UNDERSIDE CONCRETE BOX, NORTH MID-SPAN SHOWN
PHOTO #15 - TYPICAL FULL LENGTH LONGITUDINAL CRACKING OF
BOTH SIDES OF BOX GIRDER ALONG CONSTRUCTION JOINT AND TOP
OF WEB; EAST FACE IN NORTH SPAN SHOWN
PHOTO #16 - TYPICAL FULL LENGTH LONGITUDINAL CRACKING OF
BOTH SIDES OF BOX GIRDER ALONG CONSTRUCTION JOINT AND TOP
OF WEB; WEST FACE IN NORTH SPAN SHOWN
PHOTO #17 - GENERAL UNDERSIDE VIEW EAST OVERHANG LOOKING
SOUTH
PHOTO #18 - GENERAL UNDERSIDE VIEW WEST OVERHANG LOOKING
SOUTH
PHOTO #19 - TYPICAL HORIZONTAL AND DIAGONAL CRACKING IN
ENDWALL; SOUTHEAST CORNER OF STRUCTURE SHOWN
PHOTO #20 - CRACKING AT UNDERSIDE OF CONCRETE BOX AND
ABUTMENT INTERFACE; NORTH ABUTMENT SHOWN
PHOTO #21 - GENERAL VIEW NORTH ABUTMENT
PHOTO #22 - TYPICAL UNDERMINING OF NORTH ABUTMENT
PHOTO #23 - CLOSE-UP VIEW OF UNDERMINING NORTH ABUTMENT,
WITH EXPOSED STEEL H-PILE
PHOTO #24 - CLOSE-UP VIEW OF EXPOSED STEEL H-PILE AT NORTH
ABUTMENT
PHOTO #25 - GENERAL VIEW PIER, NORTH FACE SHOWN
PHOTO #26 - GENERAL VIEW DEBRIS ACCUMULATION AT NORTH
(UPSTREAM) SIDE OF PIER
PHOTO #27 - LARGE TIMBER DEBRIS AT EAST (UPSTREAM) SIDE OF
PIER
PHOTO #28 - GENERAL VIEW PIER, SOUTH FACE SHOWN; NOTE
DEBRIS ACCUMULATION AT UPSTREAM SIDE OF PIER
PHOTO #29 - GENERAL VIEW SCOUR HOLE UPSTREAM SIDE OF PIER,
LOOKING NORTH
PHOTO #30 - ABRASION AT WATERLINE OF PIER WITH EXPOSED
REBAR; EAST UPSTREAM FACE SHOWN; NOTE SCOUR HOLE FROM
DEBRIS ACCUMULATION
PHOTO #31 - CLOSE-UP VIEW SCOUR HOLE UPSTREAM SIDE OF PIER
DUE TO LARGE TIMBER DEBRIS ACCUMULATION
PHOTO #32 - CLOSE-UP VIEW OF EXPOSED REBAR AT WATERLINE OF
PIER; EAST UPSTREAM FACE SHOWN
PHOTO #33 - ABRASION AT WATERLINE OF PIER; WEST DOWNSTREAM
FACE SHOWN
PHOTO #34 - WEST DOWNSTREAM SIDE OF PIER
PHOTO #35 - GENERAL VIEW SOUTH ABUTMENT
PHOTO #36 - GENERAL VIEW OF EAST SIDEWALK AND RAILING,
LOOKING NORTH
PHOTO #37 - GENERAL CONDITION EAST CONCRETE CURB,
SIDEWALK, AND RAILING; NOTE PARTIALLY CLOGGED DECK DRAIN
LOOKING SOUTH, SOUTH SPAN SHOWN
PHOTO #38 - TYPICAL ABRASION OF CONCRETE SIDEWALK WITH
EXPOSED AGGREGATE; MID-SPAN OVER PIER, LOOKING EAST
PHOTO #39 - BENCHMARK IN EAST CONCRETE SIDEWALK, OVER PIER
PHOTO #40 - GENERAL VIEW WEST CONCRETE CURB AND RAILING,
LOOKING NORTH
PHOTO #41 - SOUTH APPROACH LOOKING SOUTH (BACK) TOWARD
SOUTH SHORE ROAD
PHOTO #42 - GENERAL VIEW SOUTH APPROACH, LOOKING WEST;
NOTE GRAVEL MIGRATION ONTO DECK
PHOTO #43 - VEGETATION GROWTH IN WEST CURBLINE AT
SOUTHWEST CORNER OF STRUCTURE
PHOTO #44 - NORTH APPROACH LOOKING NORTH (AHEAD)
PHOTO #45 - GENERAL CONDITION NORTH APPROACH, LOOKING
WEST
PHOTO #46 - 2 INCH SETTLEMENT AT NORTH APPROACH ASPHALT
PAVEMENT AND PATCHED AREA ON NORTHWEST CORNER OF DECK
SURFACE
PHOTO #47 - GENERAL CONDITION OF NORTH APPROACH LOOKING
EAST
PHOTO #48 - GENERAL VIEW OF NORTHEAST ENDWALL; NOTE
CRACKING WITH EFFLORESCENCE
PHOTO #49 - TYPICAL DROP-OFF AT SIDEWALK ENDS; APPROXIMATELY
28 INCH DROP-OFF, NORTHEAST END SHOWN
PHOTO #50 - HEAVY VEGETATION ENCROACHMENT AT NORTHWEST
CORNER OF STRUCTURE
PHOTO #51 - VIEW FROM BRIDGE LOOKING EAST (UPSTREAM)
PHOTO #52 - VIEW FROM BRIDGE LOOKING WEST (DOWNSTREAM)
PHOTO #53 - LOOKING EAST (UPSTREAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #54 - LOOKING WEST (DOWNSTREAM) FROM UNDERSIDE OF
STRUCTURE
File details come from the government source that posted it. Updated .