BIR_9500-006P-2019.pdf

PDF 3 MB Posted

Attached to
WA NPS BP OLYM 2019(2) Olym Bridge Preservation
Solicitation number
69056722B000002
Issued by

About this file

This solicitation is for a firm fixed price contract to perform bridge preservation work on multiple structures located within Olympic National Park in Washington State. The work includes cleaning and painting railings, sealing deck surfaces, stabilizing eroded banks, and applying protective coatings to exposed rebar. Bids are due by June 15, 2022 and the period of performance is from June 2022 through September 2023. The award will be made to the responsible bidder submitting the lowest priced, technically acceptable offer. The soliciting agency is the Department of Transportation Federal Highway Administration working in partnership with the National Park Service.

View the file

Other files

File Type Posted
Bid Tabulation_WA NPS BP OLYM 2019(2).pdf PDF
BidSum_WA NPS BP OLYM 2019(2).pdf PDF
Amendment A002.pdf PDF
QA_11-29-2022.pdf PDF
Amendment A001.pdf PDF
QA_11-22-2022.pdf PDF
QA_11-16-2022.pdf PDF
BIR_9500-019P-2019.pdf PDF
BIR_9500-009P-2019.pdf PDF
BIR_9500-023P-2019.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
BIR_9500-060P-2019.pdf PDF
BIR_9500-050P-2019.pdf PDF
BIR_9500-052P-2019.pdf PDF
BIR_9500-061P-2019.pdf PDF
BIR_9500-051P-2019.pdf PDF
BIR_9500-007P-2019.pdf PDF
BIR_9500-026P-2019.pdf PDF
BIR_9500-003P-2019.pdf PDF
BIR_9500-008P-2019.pdf PDF
BIR_9500-020P-2019.pdf PDF
BIR_9500-049S-2019.pdf PDF
olym201902_plans.pdf PDF
BIR_9500-062P-2019.pdf PDF
BIR_9500-022P-2019.pdf PDF
IFB OLYM Bridge Preservation.pdf PDF
BIR_9500-025P-2019.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

john.davis Sticky Note Marked set by john.davis

STRUCTURE SUMMARY STRUCTURE NO. 9500-006P

NORTH FORK SOL DUC RIVER BRIDGE INSPECTION DATE: 8/20/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN: ..

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUNDATION(S):

ABUTMENT / PIER MAT'L: ...

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

CONCRETE CONTINUOUS

TEE BEAM

CONCRETE CAST-IN-PLACE

NONE

N/A

SPREAD FTG ON BEARING MAT'L

N/A / CONCRETE

4A / RG1466

2 - CONNECTOR ROAD

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

95.0 FT (29.0 M)

60.0 FT (18.3 M)

31.0 FT (9.4 M)

26.0 FT (7.9 M)

N/A

0 °

NO

LOCATION

OLYMPIC NATIONAL PARK MILE POINT: ..................... 5.33 (KM PT 8.58)

STATE: ................................. WASHINGTON LOCATION: 5.5 MI. SE OF JCT. HWY. 101 (MP 219.5)

AND SOL DUC RIVER ROAD. FACILITY CARRIED: ............ SOL DUC VALLEY ROAD

FEATURE INTERSECTED: .. NORTH FORK SOL DUC RIVER

STRUCTURE EVALUATION SUMMARY

This concrete tee beam "bobtail" cantilever bridge is in fair condition overall. The main structural problem is widespread minor vertical and diagonal cracking throughout the tee beams and diaphragms in the main span. No repairs to the beams are required at this time. However, the deck should be sealed with a silane or siloxane sealant to help prevent further water intrusion into the beam concrete. The condition of the concrete will continue to be monitored during future inspection cycles.

Additional problems requiring corrective action at this time are erosion and bank sloughing at northwest corner of bridge, widespread surface rusting of the bridge railings, and debris accumulation along the curblines and in the deck drains.

Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: J. HENSLEY, D. LEHMANN

CONDITION ASSESSMENT:

JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/25/20

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-006P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

58.6 CLEAN AND PAINT RAILINGS. REPLACE MISSING STIFFENER AT

SOUTHWEST RAIL END.

1 LS

58.1 SEAL DECK SURFACE WITH APPROVED SILANE/SILOXANE

SEALANT TO HELP PREVENT WATER INTRUSION.

1 LS

61.2 STABILIZE BANK AT NORTHWEST CORNER OF BRIDGE. 1 LS

58.1 SEAL AREAS OF EXPOSED REBAR ON DECK UNDERSIDE WITH

APPROVED PROTECTIVE COATING.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN AND CONSTRUCTION ENGINEERING.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

john.davis Sticky Note Marked set by john.davis john.davis

FIELD INSPECTION REPORT STRUCTURE NO. 9500-006P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(STRIPING)

G F N N N F N N G

N G

N N N G N N N N F N G N

F N G G F G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR POPOUTS AND ABRASION WITH EXPOSED AGGREGATE ON

DECK SURFACE. MINOR SPALL ON WESTBOUND LANE, MAIN SPAN,

NEAR MIDSPAN. 8'X8' PATCH REPAIR IN DECK FROM PRIOR DECK

DAMAGE, WESTBOUND LANE IN EAST SPAN; MINOR TRANSVERSE

CRACKING WITH EFFLORESCENCE OF DECK UNDERSIDE AT PATCH.

WIDESPREAD MINOR TRANSVERSE CRACKING THROUGHOUT DECK

UNDERSIDE AND OVERHANGS; EFFLORESCENCE AT SEVERAL

LOCATIONS; SOME CRACKS EXTEND INTO BEAMS. TWO MINOR

SPALLS WITH EXPOSED REBAR ON DECK UNDERSIDE IN MAIN

SPAN, BAY #2 NEAR EAST PIER AND WEST SPAN, BAY #1 NEAR

WEST PIER. EXPOSED REBAR DUE TO INSUFFICIENT COVER ON

UNDERSIDE OF NORTH DECK OVERHANG AT MIDSPAN. SMALL AREA

OF RUST ON DECK UNDERSIDE IN BAY #2, EAST SPAN NEAR EAST

PIER.

MODERATE MOSS GROWTH ON DECK FACES. MINOR

EFFLORESCENCE ON DECK FACES FROM RAIL POST GROUT PADS.

58.5 MINOR SCALING OF CURBS. MODERATE MOSS GROWTH ON

CURBS.

MINOR TO MODERATE DETERIORATION OF CURB JOINT FILLER

WITH SOIL ACCUMULATION AND MINOR VEGETATION GROWTH IN

CURB JOINTS.

58.6 AREAS OF PAINT LOSS AND MINOR SURFACE RUSTING

THROUGHOUT RAILINGS. MISSING CENTER STIFFENER BETWEEN

POST 2 AND 4 ON SOUTH RAILING.

58.7 MODERATE ACCUMULATION OF DEBRIS ALONG CURBLINES. DECK

DRAINS ARE PARTIALLY CLOGGED.

58.8 TWO GALVANIZED STEEL UTILITY CONDUITS ON SOUTH SIDE OF

DECK, SURFACE RUST IS BEGINNING TO FORM ON CONDUITS. ONE

BROKEN BRACKET AT EAST END.

58.10, 222.9 ROADWAY STRIPING IS FADED.

N G G F P G

F

N

G

F

FIELD INSPECTION REPORT STRUCTURE NO. 9500-006P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 6

G F N F N

MED

SUFF

13 FT.

GRAVEL, COBBLES

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER (STRIPING)

N N N G G G F G F

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.2,6 MINOR VERTICAL AND DIAGONAL CRACKING WITH STAINING

THROUGHOUT TEE BEAM STEMS IN MAIN SPAN; ONE CRACK HAS

EFFLORESCENCE ON SOUTH FACE OF BEAM #4 OVER WEST PIER.

SCRAPE MARKS ON UNDERSIDE OF ALL BEAMS AT CENTER OF MAIN

SPAN.

MINOR HONEYCOMBING OF GIRDER #2 AT WEST SIDE OF EAST

PIER.

MINOR VERTICAL CRACKING OF DIAPHRAGMS.

60.4 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON

ENDWALLS.

60.9 MINOR EROSION AND UNDERMINING OF WEST ENDWALL; 10"H X

18'L X 12"U AT NORTH END OF WEST ENDWALL.

MODERATE EROSION AT SIDES OF WEST ABUTMENT SLOPE.

60.13 MINOR STAINING OF PIERS. MINOR SCALING AT BASE OF PIERS

WITH SMALL VOIDS AT BASE OF EAST PIER. MINOR SOIL

ACCUMULATION ON TOP OF PIER CAPS. MODERATE AREAS OF

HONEYCOMBING, UP TO 1-1/2" DEEP ON WEST FACE OF EAST PIER,

BOTH COLUMNS.

60.16,17 OLD TIMBER FORMWORK REMAINS IN PLACE AT PIER FOOTINGS.

WEST PIER: TOP OF FOOTING EXPOSED UP TO 6"H FOR 20'L.

EAST PIER: TOP OF FOOTING EXPOSED UP TO 1'H FOR 15'L.

61.2 BANK SLOUGHING AT U/S SIDE OF WEST ENDWALL NEAR TOP OF

BANK APPROXIMATELY 3 FEET FROM ENDWALL.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

222.4 ASPHALT PAVEMENT (NEW IN 2017 INSPECTION) ON EAST

APPROACH. ASPHALT PATCH ON WEST APPROACH 35' WEST OF

BRIDGE AT CENTERLINE.

222.6 MINOR SETTLEMENT (UP TO 1") AT WEST APPROACH.

222.7 TYPE 3 OBJECT MARKER AT SE CORNER OF BRIDGE MISSING.

STRUCTURE LOAD RATING STRUCTURE NO. 9500-006P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 22 20 37 34

HS 26 24 43 39

TYPE 3 25 23 41 37

TYPE 3S2 34 31 57 52

TYPE 3-3 42 38 70 64

DESIGN LOADING: HS20 (MS18)

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 2/17

LOAD RATING CONTROLLED BY: SHEAR

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-006P

STRUCTURE IDENTIFICATION

(201) PARK: OLYMPIC NATIONAL PARK

(202) STRUCTURE NAME: .......... NORTH FORK SOL DUC RIVER BRIDGE

(203) STRUCTURE KIND: ............1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 9500-006P

(205) NPS REGION: .................... 6 - PACIFIC WEST

(206) ROUTE CODE NUMBER: ... 103

(207) ROAD SECTION NO: ..........006P

(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD

(209) WITHIN NPS BNDRY?: .......YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S): ................4A

(212) DRAWING NUMBERS: ....... RG1466

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

530 - WASHINGTON (WA)

009 - CLALLAM

161001030

NORTH FORK SOL DUC RIVE

SOL DUC VALLEY ROAD

9500006P0000000

5.5 MI. SE OF JCT. HWY. 1

99.99 FT (99.99 M)

5.33 (KM PT 8.58)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

04 - TEE BEAM

60.0 FT (18.3 M)

95.0 FT (29.0 M)

6 - N/A

6 - N/A

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 0 - NONE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 26.0 TONS (23.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 43.0 TONS (39.0 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-006P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 48°02'28.00"

(17) LONGITUDE: ......................... 123°56'58.10"

(19) DETOUR LENGTH: ............... 199 MI (199 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

26.0 FT (7.9 M)

31.0 FT (9.4 M)

24.0 FT (7.3 M)

18.0 FT (5.5 M)

4.0 FT (1.2 M)

2.0 FT (0.6 M)

0 - NO MEDIAN

0 °

NO

26.0 FT (7.9 M)

2.0 FT (0.6 M)

2.0 FT (0.6 M)

1 - FULL HEIGHT (NO PARAPE

4 - STEEL

3 - SIMPLE RAIL (joints at each

2.75 FT (0.84 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

D - MINOR

TBD

TBD

TBD

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

SPAN #1 & #3 - LENGTH 17.5', SPAN #2 - LENGTH 60'; TYPE 204 (CIP CONCRETE)

https://123�56'58.10 https://48�02'28.00 john.davis

APPENDIX STRUCTURE NO. 9500-006P

PHOTOGRAPHS STRUCTURE NO. 9500-006P

PHOTO #1 - LOOKING EAST (AHEAD)

FLOW

PHOTO #2 - SOUTH (DOWNSTREAM) SIDE

PHOTO #3 - LOOKING WEST (BACK) TOWARD US RTE 101

PHOTO #4 - NORTH (UPSTREAM) SIDE LOOKING EAST

PHOTO #5 - GENERAL TOPSIDE VIEW LOOKING WEST; NOTE WEAR OF

CENTER STRIPE

PHOTO #6 - TYPICAL ABRASION WITH EXPOSED AGGREGATE ON DECK

SURFACE; EASTBOUND LANE NEAR EAST APPROACH SHOWN

PHOTO #7 - GENERAL UNDERSIDE BAY #3 OF WEST CANTILEVERED

SPAN

PHOTO #8 - GENERAL UNDERSIDE OF WEST CANTILEVERED SPAN

LOOKING SOUTH; NOTE SIGNIFICANT GRAVEL BUILD-UP IN SPAN

PHOTO #9 - GENERAL UNDERSIDE OF CENTER SPAN LOOKING EAST

PHOTO #10 - GENERAL UNDERSIDE CENTER BAY OF EAST

CANTILEVERED SPAN

PHOTO #11 - GENERAL UNDERSIDE VIEW OF EAST SPAN LOOKING

NORTH

PHOTO #12 - GENERAL VIEW OF SOUTH OVERHANG LOOKING WEST

PHOTO #13 - TYPICAL CRACKING IN DIAPHRAGMS; NORTH

DIAPHRAGM, CENTER SPAN WEST FACE SHOWN

PHOTO #14 - TYPICAL CRACKING IN TEE BEAM; NORTH FACE OF

CENTER BEAM, MIDSPAN

PHOTO #15 - VERTICAL CRACKING WITH EFFLORESCENCE ON SOUTH

FACE OF DOWNSTREAM BEAM OVER WEST PIER

PHOTO #16 - TYPICAL CRACKING IN TEE BEAMS; BEAM #3, CENTER

SPAN NEAR PIER #2 SHOWN

PHOTO #17 - TYPICAL CRACKING WITH EFFLORESCENCE IN ENDWALL;

BAY #3 IN WEST CANTILEVERED SPAN

PHOTO #18 - TYPICAL CRACKING WITH EFFLORESCENCE IN ENDWALL;

BAY #2 IN WEST CANTILEVERED SPAN

PHOTO #19 - GENERAL VIEW WEST FACE PIER #1

PHOTO #20 - GENERAL VIEW EAST FACE OF PIER #1; NOTE ABRASION

AT WATERLINE

PHOTO #21 - GENERAL VIEW WEST FACE OF PIER #2; NOTE ABRASION

AT WATERLINE

PHOTO #22 - TYPICAL VIEW WEST FACE PIER #2; NOTE TIMBER

FORMWORK REMAINS IN PLACE AT PIER FOOTING

PHOTO #23 - TYPICAL SCALING AND ABRASION OF PIER COLUMNS;

EAST PIER, DOWNSTREAM COLUMN SHOWN

PHOTO #24 - GENERAL VIEW EAST FACE PIER #2

PHOTO #25 - GENERAL VIEW WEST CANTILEVERED SPAN; NOTE

SIGNIFICANT GRAVEL BUILD-UP IN SPAN

PHOTO #26 - EROSION OF EMBANKMENT UNDER UPSTREAM TEE

BEAM IN WEST CANTILEVERED SPAN

PHOTO #27 - GENERAL VIEW OF CURB AND RAIL; NOTE MOSS

GROWTH ON CURB, SOUTH RAIL LOOKING WEST

PHOTO #28 - TYPICAL CLOGGED DECK DRAIN, SOUTH CURB LOOKING

WEST

PHOTO #29 - SOUTH RAIL, 4TH PANEL FROM WEST, NOTE RUST

PHOTO #30 - TYPICAL PAINT LOSS AND SURFACE RUSTING

THROUGHOUT RAILING; SOUTH RAIL IN WEST SPAN SHOWN

PHOTO #31 - WEST APPROACH

PHOTO #32 - EAST APPROACH

PHOTO #33 - APPROXIMATELY 1-1/4" SETTLEMENT OF WEST

APPROACH IN WESTBOUND LANE

PHOTO #34 - VIEW FROM BRIDGE LOOKING UPSTREAM (NORTH)

PHOTO #35 - VIEW FROM BRIDGE LOOKING DOWNSTREAM (SOUTH)

PHOTO #36 - LOOKING UPSTREAM (NORTH) FROM UNDERSIDE OF

BRIDGE

PHOTO #37 - LOOKING DOWNSTREAM (SOUTH) FROM UNDERSIDE OF

BRIDGE

PHOTO #38 - EROSION AT NORTHWEST BANK

File details come from the government source that posted it. Updated .