This solicitation is for a firm fixed price contract to perform bridge preservation work on multiple structures located within Olympic National Park in Washington State. The work includes cleaning and painting railings, sealing deck surfaces, stabilizing eroded banks, and applying protective coatings to exposed rebar. Bids are due by June 15, 2022 and the period of performance is from June 2022 through September 2023. The award will be made to the responsible bidder submitting the lowest priced, technically acceptable offer. The soliciting agency is the Department of Transportation Federal Highway Administration working in partnership with the National Park Service.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
john.davis Sticky Note Marked set by john.davis
STRUCTURE SUMMARY STRUCTURE NO. 9500-006P
NORTH FORK SOL DUC RIVER BRIDGE INSPECTION DATE: 8/20/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
CONCRETE CONTINUOUS
TEE BEAM
CONCRETE CAST-IN-PLACE
NONE
N/A
SPREAD FTG ON BEARING MAT'L
N/A / CONCRETE
4A / RG1466
2 - CONNECTOR ROAD
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
95.0 FT (29.0 M)
60.0 FT (18.3 M)
31.0 FT (9.4 M)
26.0 FT (7.9 M)
N/A
0 °
NO
LOCATION
OLYMPIC NATIONAL PARK MILE POINT: ..................... 5.33 (KM PT 8.58)
STATE: ................................. WASHINGTON LOCATION: 5.5 MI. SE OF JCT. HWY. 101 (MP 219.5)
AND SOL DUC RIVER ROAD. FACILITY CARRIED: ............ SOL DUC VALLEY ROAD
FEATURE INTERSECTED: .. NORTH FORK SOL DUC RIVER
STRUCTURE EVALUATION SUMMARY
This concrete tee beam "bobtail" cantilever bridge is in fair condition overall. The main structural problem is widespread minor vertical and diagonal cracking throughout the tee beams and diaphragms in the main span. No repairs to the beams are required at this time. However, the deck should be sealed with a silane or siloxane sealant to help prevent further water intrusion into the beam concrete. The condition of the concrete will continue to be monitored during future inspection cycles.
Additional problems requiring corrective action at this time are erosion and bank sloughing at northwest corner of bridge, widespread surface rusting of the bridge railings, and debris accumulation along the curblines and in the deck drains.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. HENSLEY, D. LEHMANN
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/25/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-006P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.6 CLEAN AND PAINT RAILINGS. REPLACE MISSING STIFFENER AT
SOUTHWEST RAIL END.
1 LS
58.1 SEAL DECK SURFACE WITH APPROVED SILANE/SILOXANE
SEALANT TO HELP PREVENT WATER INTRUSION.
1 LS
61.2 STABILIZE BANK AT NORTHWEST CORNER OF BRIDGE. 1 LS
58.1 SEAL AREAS OF EXPOSED REBAR ON DECK UNDERSIDE WITH
APPROVED PROTECTIVE COATING.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
john.davis Sticky Note Marked set by john.davis john.davis
FIELD INSPECTION REPORT STRUCTURE NO. 9500-006P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(STRIPING)
G F N N N F N N G
N G
N N N G N N N N F N G N
F N G G F G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1 MINOR POPOUTS AND ABRASION WITH EXPOSED AGGREGATE ON
DECK SURFACE. MINOR SPALL ON WESTBOUND LANE, MAIN SPAN,
NEAR MIDSPAN. 8'X8' PATCH REPAIR IN DECK FROM PRIOR DECK
DAMAGE, WESTBOUND LANE IN EAST SPAN; MINOR TRANSVERSE
CRACKING WITH EFFLORESCENCE OF DECK UNDERSIDE AT PATCH.
WIDESPREAD MINOR TRANSVERSE CRACKING THROUGHOUT DECK
UNDERSIDE AND OVERHANGS; EFFLORESCENCE AT SEVERAL
LOCATIONS; SOME CRACKS EXTEND INTO BEAMS. TWO MINOR
SPALLS WITH EXPOSED REBAR ON DECK UNDERSIDE IN MAIN
SPAN, BAY #2 NEAR EAST PIER AND WEST SPAN, BAY #1 NEAR
WEST PIER. EXPOSED REBAR DUE TO INSUFFICIENT COVER ON
UNDERSIDE OF NORTH DECK OVERHANG AT MIDSPAN. SMALL AREA
OF RUST ON DECK UNDERSIDE IN BAY #2, EAST SPAN NEAR EAST
PIER.
MODERATE MOSS GROWTH ON DECK FACES. MINOR
EFFLORESCENCE ON DECK FACES FROM RAIL POST GROUT PADS.
58.5 MINOR SCALING OF CURBS. MODERATE MOSS GROWTH ON
CURBS.
MINOR TO MODERATE DETERIORATION OF CURB JOINT FILLER
WITH SOIL ACCUMULATION AND MINOR VEGETATION GROWTH IN
CURB JOINTS.
58.6 AREAS OF PAINT LOSS AND MINOR SURFACE RUSTING
THROUGHOUT RAILINGS. MISSING CENTER STIFFENER BETWEEN
POST 2 AND 4 ON SOUTH RAILING.
58.7 MODERATE ACCUMULATION OF DEBRIS ALONG CURBLINES. DECK
DRAINS ARE PARTIALLY CLOGGED.
58.8 TWO GALVANIZED STEEL UTILITY CONDUITS ON SOUTH SIDE OF
DECK, SURFACE RUST IS BEGINNING TO FORM ON CONDUITS. ONE
BROKEN BRACKET AT EAST END.
58.10, 222.9 ROADWAY STRIPING IS FADED.
N G G F P G
F
N
G
F
FIELD INSPECTION REPORT STRUCTURE NO. 9500-006P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G F N F N
MED
SUFF
13 FT.
GRAVEL, COBBLES
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (STRIPING)
N N N G G G F G F
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2,6 MINOR VERTICAL AND DIAGONAL CRACKING WITH STAINING
THROUGHOUT TEE BEAM STEMS IN MAIN SPAN; ONE CRACK HAS
EFFLORESCENCE ON SOUTH FACE OF BEAM #4 OVER WEST PIER.
SCRAPE MARKS ON UNDERSIDE OF ALL BEAMS AT CENTER OF MAIN
SPAN.
MINOR HONEYCOMBING OF GIRDER #2 AT WEST SIDE OF EAST
PIER.
MINOR VERTICAL CRACKING OF DIAPHRAGMS.
60.4 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON
ENDWALLS.
60.9 MINOR EROSION AND UNDERMINING OF WEST ENDWALL; 10"H X
18'L X 12"U AT NORTH END OF WEST ENDWALL.
MODERATE EROSION AT SIDES OF WEST ABUTMENT SLOPE.
60.13 MINOR STAINING OF PIERS. MINOR SCALING AT BASE OF PIERS
WITH SMALL VOIDS AT BASE OF EAST PIER. MINOR SOIL
ACCUMULATION ON TOP OF PIER CAPS. MODERATE AREAS OF
HONEYCOMBING, UP TO 1-1/2" DEEP ON WEST FACE OF EAST PIER,
BOTH COLUMNS.
60.16,17 OLD TIMBER FORMWORK REMAINS IN PLACE AT PIER FOOTINGS.
WEST PIER: TOP OF FOOTING EXPOSED UP TO 6"H FOR 20'L.
EAST PIER: TOP OF FOOTING EXPOSED UP TO 1'H FOR 15'L.
61.2 BANK SLOUGHING AT U/S SIDE OF WEST ENDWALL NEAR TOP OF
BANK APPROXIMATELY 3 FEET FROM ENDWALL.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
222.4 ASPHALT PAVEMENT (NEW IN 2017 INSPECTION) ON EAST
APPROACH. ASPHALT PATCH ON WEST APPROACH 35' WEST OF
BRIDGE AT CENTERLINE.
222.6 MINOR SETTLEMENT (UP TO 1") AT WEST APPROACH.
222.7 TYPE 3 OBJECT MARKER AT SE CORNER OF BRIDGE MISSING.
STRUCTURE LOAD RATING STRUCTURE NO. 9500-006P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 22 20 37 34
HS 26 24 43 39
TYPE 3 25 23 41 37
TYPE 3S2 34 31 57 52
TYPE 3-3 42 38 70 64
DESIGN LOADING: HS20 (MS18)
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 2/17
LOAD RATING CONTROLLED BY: SHEAR
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-006P
STRUCTURE IDENTIFICATION
(201) PARK: OLYMPIC NATIONAL PARK
(202) STRUCTURE NAME: .......... NORTH FORK SOL DUC RIVER BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 9500-006P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 103
(207) ROAD SECTION NO: ..........006P
(208) NPS ROAD CLASS: ............ 2 - CONNECTOR ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................4A
(212) DRAWING NUMBERS: ....... RG1466
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
530 - WASHINGTON (WA)
009 - CLALLAM
161001030
NORTH FORK SOL DUC RIVE
SOL DUC VALLEY ROAD
9500006P0000000
5.5 MI. SE OF JCT. HWY. 1
99.99 FT (99.99 M)
5.33 (KM PT 8.58)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
04 - TEE BEAM
60.0 FT (18.3 M)
95.0 FT (29.0 M)
6 - N/A
6 - N/A
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 26.0 TONS (23.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 43.0 TONS (39.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-006P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 48°02'28.00"
(17) LONGITUDE: ......................... 123°56'58.10"
(19) DETOUR LENGTH: ............... 199 MI (199 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
26.0 FT (7.9 M)
31.0 FT (9.4 M)
24.0 FT (7.3 M)
18.0 FT (5.5 M)
4.0 FT (1.2 M)
2.0 FT (0.6 M)
0 - NO MEDIAN
0 °
NO
26.0 FT (7.9 M)
2.0 FT (0.6 M)
2.0 FT (0.6 M)
1 - FULL HEIGHT (NO PARAPE
4 - STEEL
3 - SIMPLE RAIL (joints at each
2.75 FT (0.84 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
D - MINOR
TBD
TBD
TBD
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
SPAN #1 & #3 - LENGTH 17.5', SPAN #2 - LENGTH 60'; TYPE 204 (CIP CONCRETE)
https://123�56'58.10 https://48�02'28.00 john.davis
APPENDIX STRUCTURE NO. 9500-006P
PHOTOGRAPHS STRUCTURE NO. 9500-006P
PHOTO #1 - LOOKING EAST (AHEAD)
FLOW
PHOTO #2 - SOUTH (DOWNSTREAM) SIDE
PHOTO #3 - LOOKING WEST (BACK) TOWARD US RTE 101
PHOTO #4 - NORTH (UPSTREAM) SIDE LOOKING EAST
PHOTO #5 - GENERAL TOPSIDE VIEW LOOKING WEST; NOTE WEAR OF
CENTER STRIPE
PHOTO #6 - TYPICAL ABRASION WITH EXPOSED AGGREGATE ON DECK
SURFACE; EASTBOUND LANE NEAR EAST APPROACH SHOWN
PHOTO #7 - GENERAL UNDERSIDE BAY #3 OF WEST CANTILEVERED
SPAN
PHOTO #8 - GENERAL UNDERSIDE OF WEST CANTILEVERED SPAN
LOOKING SOUTH; NOTE SIGNIFICANT GRAVEL BUILD-UP IN SPAN
PHOTO #9 - GENERAL UNDERSIDE OF CENTER SPAN LOOKING EAST
PHOTO #10 - GENERAL UNDERSIDE CENTER BAY OF EAST
CANTILEVERED SPAN
PHOTO #11 - GENERAL UNDERSIDE VIEW OF EAST SPAN LOOKING
NORTH
PHOTO #12 - GENERAL VIEW OF SOUTH OVERHANG LOOKING WEST
PHOTO #13 - TYPICAL CRACKING IN DIAPHRAGMS; NORTH
DIAPHRAGM, CENTER SPAN WEST FACE SHOWN
PHOTO #14 - TYPICAL CRACKING IN TEE BEAM; NORTH FACE OF
CENTER BEAM, MIDSPAN
PHOTO #15 - VERTICAL CRACKING WITH EFFLORESCENCE ON SOUTH
FACE OF DOWNSTREAM BEAM OVER WEST PIER
PHOTO #16 - TYPICAL CRACKING IN TEE BEAMS; BEAM #3, CENTER
SPAN NEAR PIER #2 SHOWN
PHOTO #17 - TYPICAL CRACKING WITH EFFLORESCENCE IN ENDWALL;
BAY #3 IN WEST CANTILEVERED SPAN
PHOTO #18 - TYPICAL CRACKING WITH EFFLORESCENCE IN ENDWALL;
BAY #2 IN WEST CANTILEVERED SPAN
PHOTO #19 - GENERAL VIEW WEST FACE PIER #1
PHOTO #20 - GENERAL VIEW EAST FACE OF PIER #1; NOTE ABRASION
AT WATERLINE
PHOTO #21 - GENERAL VIEW WEST FACE OF PIER #2; NOTE ABRASION
AT WATERLINE
PHOTO #22 - TYPICAL VIEW WEST FACE PIER #2; NOTE TIMBER
FORMWORK REMAINS IN PLACE AT PIER FOOTING
PHOTO #23 - TYPICAL SCALING AND ABRASION OF PIER COLUMNS;
EAST PIER, DOWNSTREAM COLUMN SHOWN
PHOTO #24 - GENERAL VIEW EAST FACE PIER #2
PHOTO #25 - GENERAL VIEW WEST CANTILEVERED SPAN; NOTE
SIGNIFICANT GRAVEL BUILD-UP IN SPAN
PHOTO #26 - EROSION OF EMBANKMENT UNDER UPSTREAM TEE
BEAM IN WEST CANTILEVERED SPAN
PHOTO #27 - GENERAL VIEW OF CURB AND RAIL; NOTE MOSS
GROWTH ON CURB, SOUTH RAIL LOOKING WEST
PHOTO #28 - TYPICAL CLOGGED DECK DRAIN, SOUTH CURB LOOKING
WEST
PHOTO #29 - SOUTH RAIL, 4TH PANEL FROM WEST, NOTE RUST
PHOTO #30 - TYPICAL PAINT LOSS AND SURFACE RUSTING
THROUGHOUT RAILING; SOUTH RAIL IN WEST SPAN SHOWN
PHOTO #31 - WEST APPROACH
PHOTO #32 - EAST APPROACH
PHOTO #33 - APPROXIMATELY 1-1/4" SETTLEMENT OF WEST
APPROACH IN WESTBOUND LANE
PHOTO #34 - VIEW FROM BRIDGE LOOKING UPSTREAM (NORTH)
PHOTO #35 - VIEW FROM BRIDGE LOOKING DOWNSTREAM (SOUTH)
PHOTO #36 - LOOKING UPSTREAM (NORTH) FROM UNDERSIDE OF
BRIDGE
PHOTO #37 - LOOKING DOWNSTREAM (SOUTH) FROM UNDERSIDE OF
BRIDGE
PHOTO #38 - EROSION AT NORTHWEST BANK