This document package includes a bridge inspection report and related federal contract opportunity. The bridge inspection report details the findings of an inspection of the North Tunnel structure in Olympic National Park, identifying minor cracking, efflorescence, leakage and other deficiencies throughout the concrete lining and portals. It provides condition ratings and recommendations including reattaching guardrails, replacing damaged reflectors and removing soil and gravel accumulations. The related federal contract opportunity is a sealed bid solicitation from the Department of Transportation Federal Highway Administration for bridge preservation work on multiple structures in Olympic National Park. The solicitation seeks firm fixed price bids for preservation of bridges in Clallam, Grays Harbor and Jefferson Counties in Washington State. It refers to attached documents providing additional solicitation details, plans and physical data files.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
john.davis Sticky Note Marked set by john.davis
STRUCTURE SUMMARY STRUCTURE NO. 9500-026P
NORTH TUNNEL (HURRICANE) INSPECTION DATE: 8/19/19
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 14.6 FT (4.4 M)
SPRINGLINE LENGTH: ........ 34.0 FT (10.4 M) STRUCT. TOTAL LENGTH: ... 405.0 FT (123.4 M)
CURB TO CURB WIDTH: ..... 26.8 FT (8.2 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... UNKNOWN / 7-367 YEAR RECONSTRUCTED: ....N/A
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2008-NEW ASPHALT OVERLAY. 2013-TUNNEL LINING REHABILITATION.
LOCATION
OLYMPIC NATIONAL PARK MILE POINT: ..................... 9.74 (KM PT 15.68)
STATE: .................................. WASHINGTON LOCATION: 9.7 MI. S. OF JCT. HWY. 101 (MP 248.7) AND HEART-O-THE HILLS PARKWAY, AT PORT FACILITY CARRIED: ............. HURRICANE RIDGE ROAD
ANGELES, WASHINGTON.
FEATURE INTERSECTED: ... KLAHHANE RIDGE
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in fair condition overall and only has minor problems at this time. These include minor cracking with efflorescence and leakage throughout the tunnel lining; rust staining in isolated locations; and minor delamination along the construction joints.
Other problems include moderate soil and gravel accumulation along the sidewalks that has partially clogged most of the curb drains; numerous reflectors missing/damaged from the curbs, and the southeast approach guardrail is unattached at two posts.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. HENSLEY, D. LEHMANN
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/25/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-026P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.3 REATTACH SOUTHEAST APPROACH GUARDRAIL TO POSTS. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
222.7 REPLACE MISSING/DAMAGED REFLECTORS FROM CURBS AS
NECESSARY.
1 LS
59.4 REMOVE SOIL AND GRAVEL ACCUMULATION ALONG SIDEWALKS
AND CURBLINES. CLEAN CURB DRAINS.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis
FIELD INSPECTION REPORT STRUCTURE NO. 9500-026P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 6
F1. LINING
G2. PORTALS
G3. CURBS AND SIDEWALKS
F4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
N8. OTHER (STRIPING)
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 7
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
F7. SIGNS
G8. ALIGNMENT
F9. OTHER (GATE)
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
ITEM REFERENCE AND REMARKS
59.1 MINOR VERTICAL, LONGITUDINAL, AND DIAGONAL CRACKING WITH
LEAKAGE AND EFFLORESCENCE THROUGHOUT TUNNEL LINING.
RUST STAINING IN ISOLATED LOCATIONS. NUMEROUS SOUND
PATCHES ON LINING.
MINOR DELAMINATION OF CROWN AT CONSTRUCTION JOINT,
APPROXIMATELY 365' FROM NORTH PORTAL.
59.2 MINOR SCALING AND HONEYCOMBING OF PORTALS; MINOR
VERTICAL CRACKING WITH EFFLORESCENCE ON SOUTH PORTAL.
NUMEROUS TREES ABOVE NORTH PORTAL. MINOR
HONEYCOMBING OF SOUTH PORTAL OVER SOUTHBOUND LANE.
59.3 MINOR VERTICAL AND LONGITUDINAL CRACKING OF CURBS AND
SIDEWALKS. MINOR SPALLING ALONG TOP EDGE OF CURBS AND
SIDEWALKS, RANDOMLY LOCATED.
59.4 MODERATE SOIL AND GRAVEL ACCUMULATION ALONG CURBLINES
AND SIDEWALKS. CURB DRAINS PARTIALLY CLOGGED. PARTIALLY
CLOGGED TRANSVERSE DRAIN AT SOUTH PORTAL. MINOR
DAMAGE TO ARMOR PLATE AT SOUTH PORAL. MINOR TO
MODERATE ABRASION OF JOINT HEADER AT SOUTH PORTAL.
59.8 FADING OF ROADWAY STRIPING.
222.3 WEATHERING STEEL GUARDRAILS WITH TIMBER POSTS AT
SOUTHEAST APPROACH. RAIL NOT ATTACHED AT TWO ADJACENT
INTERMEDIATE POSTS.
TRAFFIC SAFETY RATING CODES
N
- Does not meet standards or a safety feature is required and none is provided.
- Meets currently acceptable standards.
- Not applicable or a safety feature is not required.
FIELD INSPECTION REPORT STRUCTURE NO. 9500-026P
ADDITIONAL ITEM REFERENCE AND REMARKS
222.7 FOUR - TYPE 3 OBJECT MARKER SIGNS AT TUNNEL ENTRANCES. BICYCLE TRAFFIC PICTORIAL SIGN AT NORTH APPROACH TO TUNNEL. OTHER TUNNEL SIGNS LOCATED IN CLOSE PROXIMITY TO ADJACENT SIDEHILL VIADUCT
STRUCTURES - REFER TO 9500-025P AND 9500-029P FOR ADDITIONAL TUNNEL SIGNS.
NORTHWEST OBJECT MARKER POST LEANING SLIGHTLY. NORTHEAST OBJECT MARKER STAINED, BUT STILL
REFLECTIVE.
REFLECTORS ON TOP OF CURBS; NUMEROUS REFLECTORS MISSING/DAMAGED FROM BOTH CURBS. TUNNEL LINING PAINTED REFLECTIVE WHITE ALONG BOTH LININGS FROM SIDEWALK TO 3' ABOVE SIDEWALK, ENTIRE LENGTH OF TUNNEL. WHITE REFLECTIVE PAINT ON SIDES OF PORTALS FROM GROUND TO APPROXIMATELY 10'
HEIGHT.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-026P
STRUCTURE IDENTIFICATION
(201) PARK: OLYMPIC NATIONAL PARK
(202) STRUCTURE NAME: .......... NORTH TUNNEL (HURRICANE)
(203) STRUCTURE KIND: ............3 - TUNNEL
(204) STRUCTURE NUMBER: ..... 9500-026P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 10
(207) ROAD SECTION NO: ..........026P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................UNKNOWN
(212) DRAWING NUMBERS: ....... 7-367
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
530 - WASHINGTON (WA)
009 - CLALLAM
261000100
KLAHHANE RIDGE
HURRICANE RIDGE ROAD
9500026P0000000
9.7 MI. S. OF JCT. HWY. 1
16.25 FT (4.95 M)
9.74 (KM PT 15.68)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
34.0 FT (10.4 M)
405.0 FT (123.4 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 8 - UNKNOWN
C) TYPE PROTECTION: .............. 8 - UNKNOWN
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 0 - POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-026P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 48°00'38.00"
(17) LONGITUDE: ......................... 123°22'22.00"
(19) DETOUR LENGTH: ............... 199 MI (199 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 0 - OTHER
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
26.8 FT (8.2 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
24.0 FT (7.3 M)
3.0 FT (0.9 M)
3.0 FT (0.9 M)
0 - NO MEDIAN
0 °
NO
26.8 FT (8.2 M)
3.4 FT (1.0 M)
3.3 FT (1.0 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
14.58 FT (4.44 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
TBD
TBD
TBD
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2008-NEW ASPHALT OVERLAY. 2013-TUNNEL LINING REHABILITATION.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 - Length 404.7'; Type 118 (Conc. Lined) https://123�22'22.00 https://48�00'38.00
APPENDIX STRUCTURE NO. 9500-026P
PHOTOGRAPHS STRUCTURE NO. 9500-026P
PHOTO #1 - NORTH PORTAL (LOOKING AHEAD)
PHOTO #2 - SOUTH PORTAL (LOOKING BACK)
PHOTO #3 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #4 - CRACKING WITH EFFLORESCENCE, RUST STAINING, AND
LEAKAGE IN WEST LINING APPROXIMATELY 35' FROM NORTH PORTAL
PHOTO #5 - TYPICAL CRACKING WITH EFFLORESCENCE IN EAST
LINING APPROXIMATELY 35' FROM NORTH PORTAL
PHOTO #6 - TYPICAL CRACKING WITH EFFLORESCENCE IN EAST
LINING APPROXIMATELY 60' FROM NORTH PORTAL
PHOTO #7 - CRACKING WITH EFFLORESCENCE IN WEST LINING
APPROXIMATELY 60' FROM NORTH PORTAL
PHOTO #8 - DELAMINATION AND LEAKAGE FROM CROWN OF LINING
APPROXIMATELY 80' FROM NORTH PORTAL
PHOTO #9 - TYPICAL CRACKING WITH EFFLORESCENCE IN EAST
LINING APPROXIMATELY 100' FROM NORTH PORTAL
PHOTO #10 - GENERAL ROADWAY VIEW LOOKING SOUTH
PHOTO #11 - GENERAL ROADWAY VIEW LOOKING SOUTH; NOTE
TYPICAL FADING OF ROADWAY STRIPING
PHOTO #12 - ARMOR PLATE AND JOINT HEADER ABRASION AT SOUTH
PORTAL
PHOTO #13 - TYPICAL PARTIALLY CLOGGED CURB DRAIN, WEST CURB
NEAR NORTH PORTAL SHOWN
PHOTO #14 - SPALLING AND CRACKING ON TOP EDGE OF WEST CURB
NEAR NORTH PORTAL; NOTE TYPICAL GRAVEL ACCUMULATION ON
SIDEWALK AND ALONG CURBLINE NEAR TUNNEL ENDS
PHOTO #15 - SPALLING AND CRACKING ON TOP EDGE OF WEST CURB
NEAR NORTH PORTAL; NOTE TYPICAL GRAVEL ACCUMULATION ON
SIDEWALK AND ALONG CURBLINE NEAR TUNNEL ENDS
PHOTO #16 - VEGETATION AND MOSS GROWTH ABOVE NORTH PORTAL
PHOTO #17 - TYPICAL SCALING AND HONEYCOMBING OF PORTALS,
SOUTH PORTAL SHOWN
PHOTO #18 - CRACKING WITH EFFLORESCENCE ON SOUTH PORTAL
PHOTO #19 - APPROACH RAIL POSTS NOT CONNECTED TO RAIL AT