This solicitation package seeks proposals for bridge preservation work at multiple locations within Olympic National Park in Washington State. The work includes repairs to prestressed concrete bridges, with an emphasis on addressing deficiencies like cracking, spalling and exposed rebar. Proposals are due by June 15, 2022, with award anticipated by August 2022. The fixed-price contract will have a one-year period of performance. The National Park Service and Federal Highway Administration are the contracting agencies. The solicitation incorporates physical assessment files on nine bridges to inform proposals.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
john.davis Sticky Note Marked set by john.davis
STRUCTURE SUMMARY STRUCTURE NO. 9500-020P
BUNCH CREEK BRIDGE (QUINAULT) INSPECTION DATE: 8/22/19
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 7 STRUCT. TOTAL LENGTH: .. 63.0 FT (19.2 M)
DECK TYPE: ......................... CONCRETE PRECAST PANELS MAX. SPAN LENGTH: .......... 59.7 FT (18.2 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 29.0 FT (8.8 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 25.5 FT (7.8 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 0NP 13-A2 / RG2301 SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 12/93, Extreme runoff flushed stream channel, plugged opening, and overtopped deck. Log jam removal in 1994 caused minor damage to Slab Unit #7.
LOCATION
OLYMPIC NATIONAL PARK MILE POINT: ..................... 12.40 (KM PT 19.96)
STATE: ................................. WASHINGTON LOCATION: 12.4 MI. NE OF JCT. HWY. 101 (MP
125.5) AND SOUTH SHORE ROAD. FACILITY CARRIED: ............ SOUTH SHORE ROAD
FEATURE INTERSECTED: .. BUNCH CREEK
STRUCTURE EVALUATION SUMMARY
This prestressed concrete slab unit bridge is in good condition overall and has only minor problems at this time.
These include ungrouted post-tensioning block-outs in the exterior slab units, minor spalling with exposed rebar on the south side of Slab Unit #7, and debris along the south side of the east abutment near Slab Unit #7.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: J. HENSLEY, D. LEHMANN
CONDITION ASSESSMENT:
JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 3/25/20
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-020P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
58.7 PERIODICALLY REMOVE DEBRIS ACCUMULATION FROM CURBLINES. 1 LS
222.9 PERIODICALLY TRIM VEGETATION AT BRIDGE CORNERS. 1 LS
60.12 REMOVE DEBRIS AT SOUTH SIDE OF EAST ABUTMENT AND SLAB UNIT #7. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.1, 59.3 CLEAN AND GROUT TRANSVERSE POST-TENSIONING BLOCK-OUT
LOCATIONS.
1 LS
58.1, 59.3 CLEAN EXPOSED REBAR ON SLAB UNIT #7 AND COAT WITH
APPROVED SEALANT.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis
FIELD INSPECTION REPORT STRUCTURE NO. 9500-020P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
G N G N N N N N G
N G
N N G G N G N N G G G
F(DEBRIS)
N N N N N N N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1, 59.3 MINOR SPALLING WITH EXPOSED REBAR (5-1/2'L TOTAL X 2"H X 5"
UNDER X 1-1/2"D) ON BOTTOM EDGE OF SLAB UNIT #7 NEAR
MIDSPAN DUE TO LOG JAM REMOVAL IN DECEMBER 1994. STAINING
ON SLAB UNIT #1 BELOW CURB JOINT. WATER LEAKAGE AND MOSS
GROWTH ALONG LONGITUDINAL JOINTS BETWEEN SLAB UNITS;
EFFLORESCENCE ON SEVERAL LOCATIONS. TRANSVERSE
POST-TENSIONING BOLTS ON EXTERIOR FACES OF SLAB UNITS
NOT GROUTED OVER; MINOR DEBRIS IN EAST POST-TENSIONING
BLOCK-OUT LOCATION OF SLAB UNIT #7.
DIFFERENTIAL DEFLECTION BETWEEN ADJACENT SLAB UNITS; UP
TO 1" VERTICAL OFFSET. NO OBSERVED CRACKING OF SLAB UNITS
OR LONGITUDINAL CRACKING IN WEARING SURFACE ASSOCIATED
WITH DIFFERENTIAL ELEVATION.
58.3 WIDESPREAD MINOR ABRASION OF ASPHALT WEARING SURFACE.
MINOR POTHOLE IN EASTBOUND LANE NEAR MIDSPAN (1" DEEP, 8"
WIDE, 8" LONG).
58.5,6 MINOR SPALL ON WEST END OF SOUTH RAILING.
58.7 NO DRAINS PRESENT. MINOR DEBRIS ACCUMULATION ALONG
CURBLINES.
58.8, 222.9 OPEN GATE AT EAST APPROACH.
TRAFFIC SENSOR INSTALLED UNDER APPROACH PAVEMENT IN
EASTBOUND LANE AT WEST APPROACH. CABLES EXPOSED AT
TRAFFIC SENSOR BOX AT SOUTHWEST CORNER.
60.3 HEAVY EFFLORESCENCE ON WEST ABUTMENT CAP; MODERATE ON
EAST.
60.11 RIPRAP PROTECTION IN PLACE AT ABUTMENT SLOPES.
G G G G F G
N
N
G
G
FIELD INSPECTION REPORT STRUCTURE NO. 9500-020P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G F N F N
HIGH
SUFF
2 FT.
BOULDERS
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER ((VEGETATION))
N N N G G F F G G
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
N N N
60.12 MODERATE DEBRIS ACCUMULATION AGAINST SOUTH SIDE OF EAST
ABUTMENT AND SLAB UNIT #7.
61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.
61.2 SEVERE SLOUGHING OF EAST DOWNSTREAM CHANNEL BANK WITH
UNDERMINING OF SEVERAL TREES. SEE ALSO 61.4.
61.4 HEAVY DEBRIS ACCUMULATION AND TREES ACROSS DOWNSTREAM
CHANNEL AND ALONG WEST, DOWNSTREAM CHANNEL BANK.
222.6 UP TO 1" SETTLEMENT OF ASPHALT PAVEMENT AT WEST
APPROACH.
222.7 TYPE 3 REFLECTIVE OBJECT MARKERS AT BRIDGE CORNERS.
222.9 HEAVY VEGETATION GROWTH AT BRIDGE CORNERS.
ROADWAY GATE LOCATED AT NE CORNER.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 9500-020P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 31 28 71 64
HS 39 35 87 79
TYPE 3 36 33 81 73
TYPE 3S2 52 47 115 104
TYPE 3-3 61 55 137 124
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 1/17
LOAD RATING CONTROLLED BY: TENSION (INVENTORY), MOMENT (OPERATING)
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-020P
STRUCTURE IDENTIFICATION
(201) PARK: OLYMPIC NATIONAL PARK
(202) STRUCTURE NAME: .......... BUNCH CREEK BRIDGE (QUINAULT)
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 9500-020P
(205) NPS REGION: .................... 6 - PACIFIC WEST
(206) ROUTE CODE NUMBER: ... 105
(207) ROAD SECTION NO: ..........020P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................0NP 13-A2
(212) DRAWING NUMBERS: ....... RG2301
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
530 - WASHINGTON (WA)
031 - JEFFERSON
161001050
BUNCH CREEK
SOUTH SHORE ROAD
9500020P0000000
12.4 MI. NE OF JCT. HWY.
99.99 FT (99.99 M)
12.40 (KM PT 19.96)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
01 - SLAB
59.7 FT (18.2 M)
63.0 FT (19.2 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
2 - CONCRETE PRECAST PANELS
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 39.0 TONS (35.4 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 87.0 TONS (78.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-020P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 47°31'45.40"
(17) LONGITUDE: ......................... 123°41'45.60"
(19) DETOUR LENGTH: ............... 4 MI (6 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
25.5 FT (7.8 M)
29.0 FT (8.8 M)
30.0 FT (9.1 M)
26.0 FT (7.9 M)
2.0 FT (0.6 M)
2.0 FT (0.6 M)
0 - NO MEDIAN
0 °
NO
25.5 FT (7.8 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
2.17 FT (0.66 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
D - MINOR
TBD
TBD
TBD
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
12/93, Extreme runoff flushed stream channel, plugged opening, and overtopped deck. Log jam removal in 1994 caused minor damage to Slab Unit #7.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
Span #1 - Length 59.6'; Type 505 (P/S Slab Units) 7-each https://123�41'45.60 https://47�31'45.40
APPENDIX STRUCTURE NO. 9500-020P
PHOTOGRAPHS STRUCTURE NO. 9500-020P
PHOTO #1 - LOOKING EAST (AHEAD) TOWARD CAMPGROUND
FLOW
PHOTO #2 - SOUTH (UPSTREAM) SIDE
PHOTO #3 - LOOKING WEST (BACK) TOWARD US RTE 101
PHOTO #4 - NORTH (DOWNSTREAM) SIDE
PHOTO #5 - GENERAL VIEW OF DECK LOOKING WEST
PHOTO #6 - GENERAL VIEW OF DECK LOOKING EAST
PHOTO #7 - SPALL IN CONCRETE DECK (30"L X 8"W X 1" D) AT
MID-SPAN, OVER SOUTH WHEEL LINE, NEAR SOUTH RAILING
PHOTO #8 - TYPICAL ABRASION OF CONCRETE DECK SURFACE
PHOTO #9 - GENERAL UNDERSIDE VIEW LOOKING EAST
PHOTO #10 - TYPICAL WATER LEAKAGE ALONG LONGITUDINAL JOINT
BETWEEN ADJACENT SLABS; JOINT BETWEEN PANELS 2 AND 3 FROM
NORTH DOWNSTREAM SIDE, LOOKING EAST
PHOTO #11 - TYPICAL MOISTURE JOINT PANELS; JOINT BETWEEN
PANELS 5 AND 6 FROM SOUTH (UPSTREAM) SIDE NEAR MID-SPAN
PHOTO #12 - TYPICAL 1" DIFFERENTIAL DEFLECTION BETWEEN
ADJACENT SLAB UNITS; JOINT BETWEEN PANELS 2 AND 3 FROM
SOUTH (UPSTREAM) SIDE SHOWN, LOOKING WEST
PHOTO #13 - TYPICAL STALACTITES BETWEEN LONGITUDINAL JOINTS;
JOINT BETWEEN PANELS 3 AND 4 FROM SOUTH (UPSTREAM) SIDE
MID-SPAN SHOWN
PHOTO #14 - TYPICAL STALACTITES BETWEEN LONGITUDINAL JOINTS;
JOINT BETWEEN PANELS 2 AND 3 NEAR WEST ABUTMENT SHOWN
PHOTO #15 - TYPICAL CONDITION OF POST TENSIONING BOLT; SOUTH
(UPSTREAM) SIDE, SHOWN NEAR EAST ABUTMENT
PHOTO #16 - GENERAL VIEW WEST ABUTMENT
PHOTO #17 - GENERAL VIEW EAST ABUTMENT
PHOTO #18 - GENERAL VIEW OF SOUTH CONCRETE RAIL AND
CURBLINE, LOOKING WEST; NOTE DEBRIS ACCUMULATION ALONG
CURBLINE BLOCKING DECK DRAINS
PHOTO #19 - GENERAL VIEW OF NORTH CONCRETE RAIL AND
CURBLINE, LOOKING WEST; NOTE PONDING ON DECK AND DEBRIS
ACCUMULATION ALONG CURBLINE
PHOTO #20 - TYPICAL MOSS GROWTH ON OUTSIDE OF CONCRETE
PARAPET; NORTH DOWNSTREAM SIDE SHOWN, LOOKING EAST
PHOTO #21 - EAST APPROACH LOOKING EAST (AHEAD) TOWARD
CAMPGROUND
PHOTO #22 - GENERAL CONDITION OF EAST APPROACH; NOTE
SIGNIFICANT GRAVEL AND SEDIMENT MIGRATION ONTO BRIDGE DECK
PHOTO #23 - WEST APPROACH LOOKING WEST (BACK) TOWARD US
RTE 101
PHOTO #24 - GENERAL CONDITION WEST APPROACH, LOOKING
NORTH
PHOTO #25 - TYPICAL SETTLEMENT AT WEST APPROACH, LOOKING
NORTH
PHOTO #26 - VIEW FROM BRIDGE LOOKING SOUTH (UPSTREAM)
PHOTO #27 - VIEW FROM BRIDGE LOOKING NORTH (DOWNSTREAM)
PHOTO #28 - LOOKING SOUTH (UPSTEAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #29 - LOOKING NORTH (DOWNSTREAM) FROM UNDERSIDE OF
STRUCTURE
PHOTO #30 - GATE AND OBJECT MARKER AT NORTHEAST CORNER OF
STRUCTURE; NOTE EXCESSIVE VEGETATION ENCROACHMENT
PHOTO #31 - HEAVY VEGETATION GROWTH AT NORTHEAST CORNER
OF STRUCTURE
PHOTO #32 - VEGETATION GROWTH AT SOUTHEAST CORNER OF
STRUCTURE
File details come from the government source that posted it. Updated .