This document package includes a field inspection report and physical data files for a bridge located in Olympic National Park. The report provides details on the structure such as the type of bridge, materials used, dimensions, condition ratings for various components, photographs documenting current conditions, and recommended maintenance and rehabilitation work. It identifies issues such as cracking and water intrusion that should be addressed. The estimated costs provided are preliminary planning figures only and do not include related work beyond the bridge.

The related federal contract opportunity is a sealed bid solicitation for bridge preservation work on multiple structures within Olympic National Park in Clallam, Grays Harbor, and Jefferson Counties in Washington state. The solicitation seeks firms to perform maintenance, rehabilitation, and reconstruction services as outlined in the attached documents which include plans, specifications, and physical data files. The contract type is firm fixed price.

View the file

Other files

File Type Posted
Bid Tabulation_WA NPS BP OLYM 2019(2).pdf PDF
BidSum_WA NPS BP OLYM 2019(2).pdf PDF
Amendment A002.pdf PDF
QA_11-29-2022.pdf PDF
Amendment A001.pdf PDF
QA_11-22-2022.pdf PDF
QA_11-16-2022.pdf PDF
BIR_9500-006P-2019.pdf PDF
BIR_9500-019P-2019.pdf PDF
BIR_9500-009P-2019.pdf PDF
BIR_9500-023P-2019.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
BIR_9500-060P-2019.pdf PDF
BIR_9500-050P-2019.pdf PDF
BIR_9500-052P-2019.pdf PDF
BIR_9500-061P-2019.pdf PDF
BIR_9500-051P-2019.pdf PDF
BIR_9500-007P-2019.pdf PDF
BIR_9500-026P-2019.pdf PDF
BIR_9500-003P-2019.pdf PDF
BIR_9500-008P-2019.pdf PDF
BIR_9500-020P-2019.pdf PDF
BIR_9500-049S-2019.pdf PDF
olym201902_plans.pdf PDF
BIR_9500-062P-2019.pdf PDF
IFB OLYM Bridge Preservation.pdf PDF
BIR_9500-025P-2019.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

john.davis Sticky Note Marked set by john.davis

STRUCTURE SUMMARY STRUCTURE NO. 9500-022P

HOWE CREEK BRIDGE (QUINAULT) INSPECTION DATE: 8/22/19

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN: ..

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUNDATION(S):

ABUTMENT / PIER MAT'L: ...

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

CONCRETE CONTINUOUS

BOX GIRDER - SINGLE or SPREAD

CONCRETE CAST-IN-PLACE

NONE

SPREAD FTG ON BEARING MAT'L

SPREAD FTG ON BEARING MAT'L

CONCRETE

ONP 13-A2 / RG2302

3 - SPECIAL PURPOSE

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

148.0 FT (45.1 M)

74.0 FT (22.6 M)

23.5 FT (7.2 M)

20.0 FT (6.1 M)

N/A

0 °

NO

LOCATION

OLYMPIC NATIONAL PARK MILE POINT: ..................... 13.00 (KM PT 20.92)

STATE: ................................. WASHINGTON LOCATION: 13 MI. NE OF JCT. HWY. 101 (MP 125.5)

AND SOUTH SHORE ROAD. FACILITY CARRIED: ............ GRAVES CREEK ROAD

FEATURE INTERSECTED: .. HOWE CREEK

STRUCTURE EVALUATION SUMMARY

This concrete box girder bridge is in fair to good condition overall. The main structural problem is widespread minor vertical, diagonal, and longitudinal cracking throughout the sides of the box girder. In addition, transverse cracking with efflorescence and water leakage throughout the underside of the box girder is indicative of water intrusion through the deck. The deck should be sealed to help prevent further water intrusion. The condition of the box girder concrete will continue to be monitored during future inspection cycles.

Other problems noted include a large tree lodged against the pier and vegetation growing against the sides of the bridge.

Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: J. HENSLEY, D. LEHMANN

CONDITION ASSESSMENT:

JORDAN HENSLEY, P.E., FIELD TEAM LEADER 360-619-7910

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/25/20

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 9500-022P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

ROUTINE MAINTENANCE QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

58.7 PERIODICALLY REMOVE VEGETATION AND DEBRIS ACCUMULATION FROM ALONG

CURBLINES.

1 LS

58.10, 60.3 REMOVE VEGETATION FROM SIDES AND CORNERS OF BRIDGE. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST

ESTIMATES

REHAB. RECONSTR.

58.1 SEAL CONCRETE DECK SURFACE WITH APPROVED

SILANE/SILOXANE SEALANT TO HELP PREVENT WATER INTRUSION.

1 LS

61.4 REMOVE FALLEN TREES AND FLOOD DEBRIS FROM UPSTREAM

AND DOWNSTREAM CHANNELS AND AGAINST PIER.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,

DESIGN AND CONSTRUCTION ENGINEERING.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* : ........................................... TBD

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis Sticky Note Marked set by john.davis john.davis

FIELD INSPECTION REPORT STRUCTURE NO. 9500-022P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

(VEGETATION)

N F N N N N N N G

N G

G N G G G N N N G G N N

G N N N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 MINOR ABRASION WITH EXPOSED AGGREGATE ON DECK SURFACE.

SEE ALSO 59.2.

58.5,6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON CURBS

AND SEVERAL RAIL POSTS. MINOR TO MODERATE MOSS GROWTH

THROUGHOUT CURBS AND RAILINGS.

58.7 NO DECK DRAINS. MODERATE DEBRIS ACCUMULATION IN CATCH

BASIN AT NORTH SIDE OF EAST APPROACH. BOX GIRDER DRAINS

ARE CLEAR.

58.10 HEAVY VEGETATION GROWING AGAINST SIDES OF BRIDGE IN END

SPANS

59.2 MINOR VERTICAL, DIAGONAL, AND HORIZONTAL CRACKING

THROUGHOUT EXTERIOR FACE OF BOX GIRDER WEBS; VERTICAL

CRACKING WITH EFFLORESCENCE AT PIER EXTENDS INTO

UNDERSIDE OF DECK OVERHANGS; VERTICAL CRACKING AT

CENTRAL 1/3 OF EAST SPAN EXTENDS INTO UNDERSIDE OF BOX

GIRDER.

MINOR SPALLING ON EXTERIOR FACE OF BOX GIRDER WEBS AT

TOP IN SEVERAL LOCATIONS, LIKELY FROM CONSTRUCTION.

HORIZONTAL CRACK ALONG NORTH WEB, WEST SPAN.

MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE AND

WATER LEAKAGE THROUGHOUT UNDERSIDE OF BOX GIRDER.

59.6 TWO MINOR SPALLS ON END DIAPHRAGM AT WEST ABUTMENT; NW

AND SW CORNERS.

60.3 MINOR SPALL AND PATCH ON NORTH SIDE OF WEST ABUTMENT

BEARING AREA; MODERATE DEBRIS ACCUMULATION ON SOUTH

SIDE. HEAVY DEBRIS AGAINST SOUTH SIDE OF EAST ABUTMENT

DUE TO FALLEN AND DECAYED TREE.

60.4 PATCHED AREA ON BACKWALL AND BOX GIRDER ON NORTH SIDE

OF BOTH ABUTMENTS.

N G G G F N

F

N

G

G

FIELD INSPECTION REPORT STRUCTURE NO. 9500-022P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 6

G P N F N

HIGH

SUFF

11 FT.

GRAVEL, ROCK, BOULDERS

222. APPROACHES 7

1. APPROACH SLABS

2. RELIEF JOINTS

3. APPROACH GUARDRAIL

4. SURFACING

5. EROSION

6. SETTLEMENT

7. SIGNS

8. ALIGNMENT

9. OTHER

N N N G F G G F N

223. RETAINING WALL N

1. WALL

2. WEEP HOLES

3. FOUNDATION

4. EROSION AND/OR SCOUR

5. SETTLEMENT OR DEFLECTION

6. OTHER

36. TRAFFIC AND SAFETY FEATURES

A. BRIDGE RAILINGS

B. TRANSITIONS

C. APPROACH GUARDRAILS

D. APPROACH GUARDRAIL ENDS

N N N

60.5 TOP OF WEST ABUTMENT FOOTING EXPOSED UP TO 3"H (AS-BUILT).

60.13 MINOR CRACKING WITH EFFLORESCENCE AND RUST STAINING ON

BASE OF PIER. MINOR ABRASIONS TO BASE OF PIER DUE TO

LARGE FALLEN TREE; PIER REMAINS IN GOOD CONDITION. MINOR

SCALING AT BASE OF PIER.

61.2 SEE BRIDGE FILE FOR SCOUR EVALUATION.

61.3 MODERATE EROSION ON NORTHEAST CORNER (UNDER

DOWNSTREAM EDGE OF BRIDGE) DUE TO ROADWAY DRAINAGE AT

NORTHEAST CORNER.

61.4 FALLEN TREES IN UPSTREAM CHANNEL. FALLEN TREES AND

FLOOD DEBRIS IN DOWNSTREAM CHANNEL. LARGE FALLEN TREE

LODGED AGAINST PIER.

222.6 UP TO 2" OF GRADE DIFFERENTIAL AT EAST APPROACH.

222.7 TYPE 3 REFLECTIVE OBJECT MARKERS AT BRIDGE CORNERS.

222.8 BRIDGE IS LOCATED IN SHARP HORIZONTAL CURVE.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 9500-022P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 43 39 71 64

HS 57 52 96 87

TYPE 3 54 49 91 83

TYPE 3S2 70 64 117 106

TYPE 3-3 79 72 131 119

DESIGN LOADING: HS20 (MS18)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 11/15

LOAD RATING CONTROLLED BY: SHEAR AND MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-022P

STRUCTURE IDENTIFICATION

(201) PARK: OLYMPIC NATIONAL PARK

(202) STRUCTURE NAME: .......... HOWE CREEK BRIDGE (QUINAULT)

(203) STRUCTURE KIND: ............1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 9500-022P

(205) NPS REGION: .................... 6 - PACIFIC WEST

(206) ROUTE CODE NUMBER: ... 210

(207) ROAD SECTION NO: ..........022P

(208) NPS ROAD CLASS: ............ 3 - SPECIAL PURPOSE

(209) WITHIN NPS BNDRY?: .......YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S): ................ONP 13-A2

(212) DRAWING NUMBERS: ....... RG2302

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

530 - WASHINGTON (WA)

031 - JEFFERSON

161002100

HOWE CREEK

GRAVES CREEK ROAD

9500022P0000000

13 MI. NE OF JCT. HWY. 10

99.99 FT (99.99 M)

13.00 (KM PT 20.92)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

06 - BOX GIRDER - SINGLE or SPREAD

74.0 FT (22.6 M)

148.0 FT (45.1 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 0 - NONE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 57.0 TONS (51.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 96.0 TONS (87.1 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 8/19 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 9500-022P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 47°32'16.40"

(17) LONGITUDE: ......................... 123°39'54.10"

(19) DETOUR LENGTH: ............... 199 MI (199 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH:

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

20.0 FT (6.1 M)

23.5 FT (7.2 M)

19.0 FT (5.8 M)

14.0 FT (4.3 M)

3.0 FT (0.9 M)

2.0 FT (0.6 M)

0 - NO MEDIAN

0 °

NO

20.0 FT (6.1 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

1 - CONCRETE

1 - CONTINUOUS RAIL

2.33 FT (0.71 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ...........................N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

5 - Stable; scour within limits of

2 - REHAB/RECONSTRUCTION

D - MINOR

TBD

TBD

TBD

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

Span #1 Length 73.2', Span #2 - Length 64.2'; Type 205 (R/C Box Girder) https://123�39'54.10 https://47�32'16.40 john.davis

APPENDIX STRUCTURE NO. 9500-022P

PHOTOGRAPHS STRUCTURE NO. 9500-022P

PHOTO #1 - LOOKING EAST (AHEAD) TOWARD CAMPGROUND

PHOTO #2 - NORTH (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL VIEW LOOKING WEST (BACK) TOWARD US RTE

PHOTO #4 - SOUTH (UPSTREAM) SIDE

PHOTO #5 - GENERAL VIEW OF DECK LOOKING EAST TOWARD

CAMPGROUND

PHOTO #6 - TYPICAL ABRASION OF DECK SURFACE WITH EXPOSED

AGGREGATE ON DECK SURFACE

PHOTO #7 - TYPICAL ABRASION OF DECK; WEST SPAN LOOKING

NORTH

PHOTO #8 - GENERAL CONDITION OF WEST ABUTMENT JOINT

LOOKING SOUTH

PHOTO #9 - GENERAL UNDERSIDE VIEW OF CONCRETE BOX GIRDER;

WEST SPAN SHOWN, LOOKING WEST

PHOTO #10 - TYPICAL CRACKING UNDERSIDE CONCRETE BOX

GIRDER; WEST SPAN SHOWN

PHOTO #11 - TYPICAL CRACKING WITH EFFLORESCENCE AND WATER

STAINING ON UNDERSIDE OF BOX GIRDER; WEST SPAN SHOWN,

LOOKING EAST

PHOTO #12 - MOISTURE STAINING ON UNDERSIDE OF CONCRETE BOX

GIRDER; WEST SPAN SHOWN, NEAR WEST ABUTMENT

PHOTO #13 - TYPICAL CRACKING UNDERSIDE OF BOX GIRDER; WEST

SPAN SHOWN, LOOKING SOUTH

PHOTO #14 - TYPICAL CRACKING WITH RUST STAINING ON EXTERIOR

FACE OF BOX GIRDER WEBS; WEST SPAN, NORTH SIDE SHOWN

PHOTO #15 - GENERAL UNDERSIDE VIEW OF CONCRETE BOX GIRDER;

EAST SPAN SHOWN, LOOKING EAST

PHOTO #16 - GENERAL UNDERSIDE VIEW OF BOX GIRDER; EAST SPAN

SHOWN LOOKING WEST

PHOTO #17 - TYPICAL CRACKING WITH RUST STAINING ON UNDERSIDE

OF CONCRETE BOX GIRDER; EAST SPAN SHOWN, LOOKING EAST

PHOTO #18 - TYPICAL CRACKING THROUGHOUT EXTERIOR FACE OF

BOX GIRDER; EAST SPAN, SOUTH SIDE SHOWN

PHOTO #19 - TYPICAL CRACKING THROUGHOUT EXTERIOR FACE OF

BOX GIRDER WEBS; EAST SPAN, NORTH SIDE SHOWN

PHOTO #20 - GENERAL VIEW NORTH OVERHANG LOOKING WEST

PHOTO #21 - TYPICAL CRACKING WITH EFFLORESCENCE IN

OVERHANG AT PIER; NORTH (DOWNSTREAM) SIDE SHOWN

PHOTO #22 - GENERAL VIEW OF WEST ABUTMENT

PHOTO #23 - GENERAL VIEW PIER, WEST FACE SHOWN; NOTE LOG

AGAINST PIER AT UPSTREAM SIDE

PHOTO #24 - GENERAL VIEW PIER, EAST FACE SHOWN; NOTE LARGE

TIMBER UPSTREAM SIDE OF PIER

PHOTO #25 - CRACKING WITH EFFLORESCENCE IN PIER TO BOX

GIRDER INTERFACE; WEST FACE SHOWN

PHOTO #26 - TYPICAL ABRASION OF PIER AT WATERLINE; NORTH

(DOWNSTREAM) FACE SHOWN

PHOTO #27 - FALLEN TREE/LOG AGAINST UPSTREAM SIDE OF PIER

PHOTO #28 - GENERAL VIEW EAST ABUTMENT

PHOTO #29 - VEGETATION AND DEBRIS ACCUMULATION AT

SOUTHEAST BACKWALL CORNER

PHOTO #30 - GENERAL VIEW NORTH RAIL LOOKING EAST TOWARD

CAMPGROUND

PHOTO #31 - GENERAL VIEW SOUTH RAIL LOOKING EAST TOWARD

CAMPGROUND

PHOTO #32 - TYPICAL DEBRIS ACCUMULATION IN CURBLINE; SOUTH

CURBLINE LOOKING EAST SHOWN

PHOTO #33 - WEST APPROACH LOOKING WEST (BACK) TOWARD US

RTE 101

PHOTO #34 - EAST APPROACH LOOKING EAST (AHEAD) TOWARD

CAMPGROUND; NOTE GRAVEL MIGRATION ONTO DECK SURFACE

PHOTO #35 - GRADE DIFFERENTIAL BETWEEN APPROACH ROADWAY

AND TOP OF DECK; EAST APPROACH LOOKING NORTH SHOWN

PHOTO #36 - VIEW FROM BRIDGE LOOKING SOUTH (UPSTREAM)

PHOTO #37 - VIEW FROM BRIDGE LOOKING NORTH (DOWNSTREAM)

PHOTO #38 - LOOKING SOUTH (UPSTREAM) FROM UNDERSIDE OF

BRIDGE

PHOTO #39 - LOOKING NORTH (DOWNSTREAM) FROM UNDERSIDE OF

BRIDGE

PHOTO #40 - GENERAL CONDITION OF WEST EMBANKMENT UNDER

BRIDGE

PHOTO #41 - LARGE TIMBER DEBRIS IN NORTH (DOWNSTREAM)

CHANNEL

PHOTO #42 - EROSION AT NORTHEAST EMBANKMENT

PHOTO #43 - TYPICAL HEAVY VEGETATION GROWTH AT BRIDGE

CORNERS; NORTHEAST CORNER SHOWN

PHOTO #44 - TYPICAL HEAVY VEGETATION GROWTH AT BRIDGE

CORNERS; SOUTHEAST CORNER SHOWN

File details come from the government source that posted it. Updated .