This is a solicitation for a construction project at Great Smoky Mountains National Park. The project includes full depth reclamation of road sections and parking areas, establishing roadside ditches, replacing signs and pavement markings, bridge maintenance repairs, replacing drainage structures, and other miscellaneous work. The project will be split into multiple schedules with a total expected cost over $10 million. Proposals from certified Small Business Concerns will be accepted by the Department of Transportation Federal Highway Administration, with bid documents to be issued on or around October 6, 2021 and proposals due as specified in the solicitation. Offerors must submit qualifications related to their experience on similar projects. Interested vendors must register at www.sam.gov to receive notifications and access documents. Annual Representations and Certifications must be completed at www.sam.gov and required veterans forms at dol.gov. Questions should be directed to the email provided referencing the solicitation number and project details.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-026P
HAPPY VALLEY ROAD BRIDGE INSPECTION DATE: 5/14/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... FRAME NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 30.6 FT (9.3 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 30.6 FT (9.3 M)
WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 46.5 FT (14.2 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 27.2 FT (8.3 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 8G2 / 16 SKEW ANGLE: ..................... 30 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2011- NEW ASPHALT OVERLAY
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 6.94 (KM PT 11.17)
STATE: ................................. TENNESSEE LOCATION: 7.0 MI TO TN ROUTE 129
FACILITY CARRIED: ............ FOOTHILLS PARKWAY (WEST)
FEATURE INTERSECTED: .. MURRAY GAP ROAD
STRUCTURE EVALUATION SUMMARY
This cast-in-place concrete frame structure is in good condition overall, and has only minor problems at this time.
These include trees growing above the south headwall and along all wingwalls, severe deterioration of the utility conduit along the east abutment under the bridge, debris along the curblines of the underpass roadway, and missing object markers at the roadway underneath the bridge.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: R. SILVESTRY, E. JOHNSON
CONDITION ASSESSMENT:
REINALDO SILVESTRY, P.E., FIELD TEAM LEADER 703-404-6251
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
FIELD INSPECTION REPORT STRUCTURE NO. 5460-026P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
N N G N N N N N G
N G
G G N G G G
N
N
N
N
58.1, 59.3 MINOR LONGITUDINAL CRACKING AND EFFLORESCENCE ON SLAB
UNDERSIDE; MODERATE EFFLORESCENCE ALONG CENTERLINE
CONSTRUCTION JOINT, AND ALONG SOUTH SHOULDER. DIAGONAL
CRACKING OF SLAB UNDERSIDE AT NORTHWEST CORNER.
58.3, 222.4 NEW ROADWAY STRIPPING
58.6 MODERATE CHECKING OF STEEL-BACKED TIMBER GUARDRAILS.
58.7 DEBRIS AND VEGETATION ACCUMULATION ALONG CURBLINES OF
UNDERPASS ROADWAY.
60.1 MINOR SPALL WITH EXPOSED REBAR (1 SF) AT BASE OF ABUTMENT
NEAR CENTERLINE OF ABUTMENT.
60.6 MINOR SPALLING OF TOP EDGE OF SOUTHWEST WINGWALL;
SEVERAL SMALL HONEYCOMBED AREAS ALSO PRESENT. 14" (+/-)
DIAMETER TREE GROWING ADJACENT TO SOUTHEAST WINGWALL;
NO SIGNS OF DISTRESS. ONE MEDIUM TREE GROWING ABOVE
SOUTH HEADWALL. MODERATE VEGETATION AND SMALL TREES
GROWING ALONG NORTH AND SOUTHWEST WINGWALLS WITH ONE
12"(+/-) DIAMETER TREE GROWING BEHIND SOUTHWEST
WINGWALL.
60.7 WEEP HOLES SHOW MINOR TO MODERATE AMOUNTS OF SOIL
LOSS. SMALL SPALL UNDER WEEP HOLE AT NORTH END OF WEST
ABUTMENT.
60.12 UTILITY CONDUIT ALONG EAST ABUTMENT LOCATED ON
UNDERPASS ROADWAY SHOULDER, SEVERELY CORRODED WITH
COMPLETE SECTION LOSS FOR MOST OF LENGTH.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS G
6. WINGWALLS G
7. WEEP HOLES G
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER (UTILITY CONDUIT) P
PIER(S)
N13. WALLS AND/OR COLUMNS
N14. PILE BENTS
N15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
N17. EROSION AND/OR SCOUR
N18. SETTLEMENT OR DEFLECTION
N19. OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 5460-026P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL N
222. APPROACHES 8
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER (UNDERPASS ROADWAY)
N N G G G G F G F
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
222.7 14'-3" CLEARANCE SIGNS IN PLACE AT UNDERPASS APPROACHES;
BOTH SIGN POSTS ARE LOOSE. BOTH SIGNS HAVE GUN SHOT
DAMAGE.
SPEED LIMIT SIGN AT EAST APPROACH VANDALIZED WITH
GRAFFITI. OBJECT MARKERS MISSING AT UNDERPASS ROADWAY
APPROACHES.
222.9 WIDESPREAD MINOR MAP CRACKING OF UNDERPASS ROADWAY;
MINOR ABRASION THROUGHOUT. MINOR DETERIORATION OF
ASPHALT PAVEMENT AT NORTH APPROACH. PREVIOUSLY NOTED
MODERATE DETERIORATION OF ASPHALT PAVEMENT AT SOUTH
APPROACH REPAIRED SINCE PREVIOUS INSPECTION. DIAGONAL
CRACKING OF EAST AND WEST APPROACH PAVEMENT OVER
BRIDGE.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5460-026P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 49 44 82 74
HS 69 63 116 105
TYPE 3 59 54 99 90
TYPE 3S2 98 89 163 148
TYPE 3-3 104 94 174 158
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 12/15
LOAD RATING CONTROLLED BY: EXTERIOR WALL NEGATIVE MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-026P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... HAPPY VALLEY ROAD BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 009 - BLOUNT
(204) STRUCTURE NUMBER: ..... 5460-026P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 24 (6) FEATURES INTERSECTED:....... MURRAY GAP ROAD
(207) ROAD SECTION NO: ..........026P (7) FACILITY CARRIED: .................. FOOTHILLS PARKWAY (WES
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5460026P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 7.0 MI TO TN ROUTE 129
(210) OPERATING UNIT: ............. N. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................8G2 (11) MILE POINT: .............................6.94 (KM PT 11.17)
(212) DRAWING NUMBERS: ....... 16 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
07 - FRAME
30.6 FT (9.3 M)
30.6 FT (9.3 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 69.0 TONS (62.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 99.9 TONS (99.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 5/18 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-026P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°37'51.00"
(17) LONGITUDE: ......................... 83°56'48.80"
(19) DETOUR LENGTH: ............... 5 MI (8 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 2.5 FT (0.8 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
27.2 FT (8.3 M)
46.5 FT (14.2 M)
32.0 FT (9.8 M)
24.0 FT (7.3 M)
4.0 FT (1.2 M)
4.0 FT (1.2 M)
0 - NO MEDIAN
30 °
NO
27.2 FT (8.3 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
7 - TIMBER
3 - SIMPLE RAIL (joints at each
2.25 FT (0.69 M)
99.99 FT (99.99 M)
14.42 FT (4.40 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2011- NEW ASPHALT OVERLAY
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5460-026P
PHOTOGRAPHS STRUCTURE NO. 5460-026P
PHOTO #1 - GENERAL VIEW LOOKING EAST
PHOTO #2 - NORTH SIDE; NOTE VERTICAL CLEARANCE SIGN AT NORTH
APPROACH
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING WEST
PHOTO #4 - TRANSVERSE CRACKING OF WEARING SURFACE OVER
EAST APPROACH
PHOTO #5 - LONGITUDINAL AND TRANSVERSE
CRACK OF NORTH APPROACH PAVEMENT
OVER EASTBOUND LANE
PHOTO #6 - TYPICAL CHECKING OF
STEEL-BACKED TIMBER RAILS, SOUTH RAIL
SHOWN
PHOTO #7 - GENERAL VIEW OF SOUTH RAILING
PHOTO #8 - GENERAL VIEW OF NORTH RAILING
PHOTO #9 - GENERAL VIEW OF SOUTHEAST WINGWALL
PHOTO #10 - GENERAL VIEW OF EAST ABUTMENT
PHOTO #11 - EFFLORESCENCE ALONG
CONSTRUCTION JOINT ON SLAB UNDERSIDE
PHOTO #12 - GENERAL UNDERSIDE VIEW
LOOKING NORTH; NOTE TWO FULL LENGTH
LONGITUDINAL CRACK WITH
EFFLORESCENCE
PHOTO #13 - FULL LENGTH LONGITUDINAL
CRACK WITH EFFLORESCENCE ON SLAB
UNDERSIDE NEAR SOUTH END
PHOTO #14 - LONGITUDINAL CRACK WITH
EFFLORESCENCE ON SLAB UNDERSIDE, NEAR
EAST ABUTMENT UNDER WESTBOUND LANE
PHOTO #15 - DIAGONAL CRACKS ON SLAB UNDERSIDE AT
NORTHWEST CORNER
PHOTO #16 - SPALL WITH EXPOSED REBAR AT BOTTOM OF WEST
ABUTMENT
PHOTO #17 - GENERAL VIEW OF NORTHWEST WINGWALL
PHOTO #18 - GENERAL VIEW OF NORTHEAST WINGWALL
PHOTO #19 - VERTICAL CLEARANCE SIGN AT SOUTH APPROACH