Bidder Status Form.html
HTML file 48 KB Posted
- Attached to
- Resource Center Pavement and Utility Demolition
- Solicitation number
- HDR Project No 10435937-6
- Issued by
- Polk County, Iowa
About this file
This is a bidder status form from the A & D Technical Supply Planroom displaying active public job solicitations in Nebraska and Iowa, with primary focus on the Glenwood Redevelopment Corporation's Resource Center Pavement and Utility Demolition project. The project encompasses removal and stockpiling of 68,000 square yards of concrete, 5,900 square yards of asphalt, and 13,800 square yards of sidewalk across the Glenwood Resource Center Campus in Glenwood, Iowa. Additionally, the scope includes abandonment or removal of utilities totaling 26,000 linear feet of water mains, 15,000 linear feet of sanitary sewers, 8,400 linear feet of fuel oil lines, and 15,000 linear feet of gas mains, along with tunnel demolition, manhole removal, and storm sewer removal. A mandatory pre-bid conference is scheduled for October 1, 2026 at 10:00 a.m., with an optional site visit available on October 9, 2026 from 11:30 a.m. to 12:30 p.m. Sealed bids are due October 14, 2026 at 2:00 p.m. at the HDR office in Omaha, Nebraska. The project requires substantial completion by April 1, 2027, and final completion by May 1, 2027, with liquidated damages of $1,000 per day for delays.
The project uses unit price bidding methodology with the final contract price based on actual quantities performed. Bid security must be provided as a penal sum bid bond at five percent of the maximum bid price. The successful contractor must furnish performance and payment bonds, provide evidence of Iowa contractor licensing and authorization to do business in Iowa, and submit qualifications documentation within specified timeframes. Progress payments are made monthly at 90 percent of completed work value with retainage; upon 50 percent completion with satisfactory progress, additional retainage ceases. Contractors are responsible for obtaining all required permits, coordinating with utility providers, submitting 811 utility locating notifications a minimum of three business days prior to excavation, managing erosion and sediment control, and disposing of materials at approved facilities. Concrete demolition materials must be processed and stockpiled for recycling into modified subbase material. The project includes areas of archeological concern and multiple trees designated for protection requiring special sequencing attention.
Text of this file
A & D's Planroom Options
A & D Home
Distribution Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Additional Planrooms
State of NE Building Div. Planroom
Version 6.0.11.11
A & D Technical Supply Planroom
Welcome to the A & D Technical Supply Planroom, use this page for a 30-day job and addendum watch. Click Public jobs for an alphabetical listing of all public Jobs or the calendar to view all jobs by bid date
Recently Posted Jobs
Job Information Bids In  Bid Date
MCC South Omaha Campus, Mahoney Building Motor Sports Exhaust System
Morrissey Engineering
Levi Epperson
15 Days
10/13/2026
Glenwood Redevelopment Corporation Resource Center Pavement & Utility Demo
Glenwood Redevelopment Corporation
Project Manager
16 Days
10/14/2026
MPS J. Sterling Morton Elementary School Secure Vestibule
Carlson West Povondra Architects
Kevin Baitley
22 Days
10/20/2026
IWCC Student Center Kitchen HVAC Replacement Project
Engineering Technologies
Lisa Lewis
8 Days
10/06/2026
Hillside Apartments
AJR Properties Inc.
Estimating Department
09/25/2026
RFP - Adams Central Public Schools Playground Equipment & Surfacing Project
W Design Associates
Breanna Spitz
17 Days
10/15/2026
OPS South High School Track Resurfacing
Omaha Public Schools
Debbie Failor
8 Days
10/06/2026
See All Public Jobs
7 Day Bid Watch
Jobs that Bid Today
1-3 Days until Bid
4-5 Days until Bid
6+ Days until Bid
No jobs found.
Public Jobs
Addendum Watch
No addenda found.
Going back:
Days:
Other files
| File | Type | Posted |
|---|---|---|
| GRC_Pavement and Utility Demolition Phase 3 IFB Project Manual 9-23-26.pdf | ||
| GRC Pavement and Utility Demolition Phase 3 IFB Plans 9-23-26.pdf | ||
| General Conditions (EJCDC C-700-2018).html | HTML file | |
| Bid Bond Penal Sum Form (EJCDC C-430-2018).html | HTML file | |
| 1450843-event.pdf | ||
| Bid Form (EJCDC C-410-2018).html | HTML file | |
| Agreement (EJCDC C-520-2018).html | HTML file | |
| Bidding Documents.html | HTML file | |
| Qualifications Statement (EJCDC C-451-2018).html | HTML file | |
| Supplementary Conditions (EJCDC C-800-2018).html | HTML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .