Bid Bond Penal Sum Form (EJCDC C-430-2018).html
HTML file 48 KB Posted
- Attached to
- Resource Center Pavement and Utility Demolition
- Solicitation number
- HDR Project No 10435937-6
- Issued by
- Polk County, Iowa
About this file
This is a Bid Bond Penal Sum Form document supporting a sealed bid solicitation issued by the Glenwood Redevelopment Corporation for pavement and utility demolition services at the Glenwood Resource Center Campus in Glenwood, Iowa. The scope of work encompasses removal and stockpiling of 68,000 square yards of concrete, 5,900 square yards of asphalt, and 13,800 square yards of sidewalk; salvage and stockpiling of 2,000 cubic yards of aggregate subbase; abandonment or removal of utilities including 26,000 linear feet of water mains, 15,000 linear feet of sanitary sewers, 8,400 linear feet of fuel oil lines, and 15,000 linear feet of gas mains; tunnel demolition; manhole removal and abandonment; storm sewer removal; clearing and grubbing; and temporary fencing. A mandatory pre-bid conference is scheduled for October 1, 2026 at 10:00 a.m., available both in-person at the Mills County Annex Building in Glenwood and virtually via Microsoft Teams. A site visit is available on October 9, 2026 from 11:30 a.m. to 12:30 p.m. Sealed bids are due October 14, 2026 at 2:00 p.m. and must be submitted to the HDR office in Omaha, Nebraska. Substantial completion is required by April 1, 2027, with final completion by May 1, 2027.
Bid security consists of a penal sum bid bond at five percent of the maximum bid price. The contract uses unit price bidding with final contract price based on actual quantities performed. Progress payments are made monthly at 90 percent of completed work value with retainage; upon 50 percent completion with satisfactory progress, additional retainage ceases. Liquidated damages are $1,000 per day for failure to meet contract completion dates. The successful bidder must furnish performance and payment bonds, evidence of Iowa contractor licensing and authorization to do business in Iowa, and qualifications documentation within specified timeframes. Concrete demolition materials must be processed and stockpiled for recycling into modified subbase material. Contractors must obtain all required permits, coordinate with utility providers, submit 811 utility locating notifications a minimum of three business days prior to excavation, manage erosion and sediment control, and dispose of materials at approved facilities. This project represents Phase 3 of a planned series of demolition projects at the former Glenwood Resource Center for 2026.
Text of this file
A & D's Planroom Options
A & D Home
Distribution Home
Public Jobs
Private Jobs (with password)
Calendar
Log In
Additional Planrooms
State of NE Building Div. Planroom
Version 6.0.11.11
A & D Technical Supply Planroom
Welcome to the A & D Technical Supply Planroom, use this page for a 30-day job and addendum watch. Click Public jobs for an alphabetical listing of all public Jobs or the calendar to view all jobs by bid date
Recently Posted Jobs
Job Information Bids In  Bid Date
MCC South Omaha Campus, Mahoney Building Motor Sports Exhaust System
Morrissey Engineering
Levi Epperson
15 Days
10/13/2026
Glenwood Redevelopment Corporation Resource Center Pavement & Utility Demo
Glenwood Redevelopment Corporation
Project Manager
16 Days
10/14/2026
MPS J. Sterling Morton Elementary School Secure Vestibule
Carlson West Povondra Architects
Kevin Baitley
22 Days
10/20/2026
IWCC Student Center Kitchen HVAC Replacement Project
Engineering Technologies
Lisa Lewis
8 Days
10/06/2026
Hillside Apartments
AJR Properties Inc.
Estimating Department
09/25/2026
RFP - Adams Central Public Schools Playground Equipment & Surfacing Project
W Design Associates
Breanna Spitz
17 Days
10/15/2026
OPS South High School Track Resurfacing
Omaha Public Schools
Debbie Failor
8 Days
10/06/2026
See All Public Jobs
7 Day Bid Watch
Jobs that Bid Today
1-3 Days until Bid
4-5 Days until Bid
6+ Days until Bid
No jobs found.
Public Jobs
Addendum Watch
No addenda found.
Going back:
Days:
Other files
| File | Type | Posted |
|---|---|---|
| GRC_Pavement and Utility Demolition Phase 3 IFB Project Manual 9-23-26.pdf | ||
| GRC Pavement and Utility Demolition Phase 3 IFB Plans 9-23-26.pdf | ||
| General Conditions (EJCDC C-700-2018).html | HTML file | |
| 1450843-event.pdf | ||
| Bid Form (EJCDC C-410-2018).html | HTML file | |
| Agreement (EJCDC C-520-2018).html | HTML file | |
| Bidding Documents.html | HTML file | |
| Bidder Status Form.html | HTML file | |
| Qualifications Statement (EJCDC C-451-2018).html | HTML file | |
| Supplementary Conditions (EJCDC C-800-2018).html | HTML file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .