This document is a Bid Schedule for the Fan Coil Unit Replacement project at the First Ladies National Historic Site in Canton, OH. The bid schedule outlines two primary scopes of work: a base bid for fan coil unit replacement on the 2nd, 3rd, 4th, and 6th floors, and an optional additional scope for the 5th floor. The bid includes line items for mobilization/demobilization, site preparation, demolition, and associated labor and materials. The pricing structure allows bidders to specify costs for construction items, with separate sections for overhead, profit, and bonds. The bid schedule is designed to capture both the base project costs and potential additional floor renovation costs, enabling flexible pricing for the comprehensive HVAC replacement project.

View the file

Other files for this federal contract opportunity

Other files attached to Fan Coil Unit Replacement, newest first.
File Type Posted
Site_Visit_Attendees_List_0001.pdf PDF
Revised_Drawings_-_12_May_2025_0001.pdf PDF
Sol_140P6425B0004_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Attachment_-_Drawings-Pictures.pdf PDF
Attachment_-_Notice_to_Contractors.pdf PDF
Sol_140P6425B0004.pdf PDF
Attachment_-_Construction_Contract_Admin.pdf PDF
Wage_Determination_-_Stark_Co.pdf PDF
Attachment_-_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
Attachment_-_Submittal_List.pdf PDF
Bid_Schedule_-_Fan_Coil_Replace.xlsx XLSX spreadsheet
Specifications_-_Fan_Coil_Replace.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

Grand Total (Base Bid)

Overhead

Subtotal

Bonds Profit

Construction Items

National Park Service U.S. Department of Interior

First Ladies National Historic Site

BID SCHEDULE

PROJECT: Fan Coil Unit Replacement

Fan Coil Unit Replacement (2nd, 3rd, 4th and 6th Floor) and all associated work/items

- Materials

- Labor

- Materials Site Preparation, Demolition and all associated work/items

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

Grand Total (Base Bid + Option #1)

Option #1: Fan Coil Unit Replacement (5th Floor) and all associated work/items

- Materials

- Labor

Overhead Profit Bonds

Grand Total (Option #1)