Bid_Schedule_-_Boardwalk_Replacement.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
Boardwalk Replacement @ CUVA
Solicitation number
140P6426B0005
Issued by

About this file

This file is a Bid Schedule template document for a Boardwalk Replacement project at Cuyahoga Valley National Park (CUVA) in Peninsula, Ohio, issued by the U.S. Department of Interior National Park Service. The solicitation is Invitation for Bid (IFB) number 140P6426B0005 for a firm-fixed price contract with an estimated project magnitude between $1 million and $3 million. The contract is set aside 100% for Total Small Businesses under NAICS code 237990 (Other Heavy and Civil Engineering Construction). Work includes removal and demolition of existing boardwalk structures and installation of new construction at the trail location, with anticipated performance beginning in May/June 2026 and contract award targeted for April/May 2026. Construction Wage Rate Requirements for Summit County, Ohio will apply.

The bid schedule requires offerors to submit minimum pricing for all base line items and option lines to avoid rendering proposals non-responsive. The base bid includes five primary cost categories: Mobilization/Demobilization, Site Demolition/Removals, Site Clearing, Earthwork, and Installation of New Boardwalk—each broken down by Materials, Labor, and Equipment with lump-sum pricing. Option #1 provides an alternative for 3x rough sawn S1S treated lumber decking in lieu of standard 2x treated lumber, with a note instructing offerors to include only additional labor and equipment costs associated with the material substitution to avoid duplicate costs. All totals and extended prices must be rounded to whole dollars. The document also includes sample price schedule templates for Design-Bid-Build and Design-Build contracting methods for reference purposes.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE

US Department of Interior
National Park Service
Park Location: Cuyahoga Valley National Park
Project Title: Boardwalk Replacement

NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.

Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasurePrice/UnitTotal Price
1Base Bid1Lump Sum$ - 0$ - 0
2Bid Option 11Lump Sum$ - 0$ - 0
2
3
4
Grand Total (Base Bid + Option #1)$ - 0

Price Schedule Wksht

Cuyahoga Valley National Park
U.S. Department of Interior
National Park ServiceStumpy Basin Boardwalk

PROJECT: Boardwalk Replacement

PRICE SCHEDULE WORKSHEET

Construction Items Unit Quantity Price/ Unit Subtotal

BASE BID - Mobilization/Demobilization
- Mob/Demob CostsLS1$ - 0$ - 0
BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE BID - SITE CLEARING and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE BID - EARTHWORK and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE BID - INSTALLATION OF NEW BOARDWALK and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0

SUBTOTAL $ - 0

Overhead%$ - 0
Profit%$ - 0
Bonds%$ - 0

Grand Total (BASE BID) $ - 0

OPTION #1 - 3x ROUGH SAWN S1S Treated Lumber Decking (in lieu of 2x treated lumber) and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
NOTE: Only include additional labor and equipment costs associated with this material being utilized in lieu of the material being provided with the base bid // refrain from adding duplicate labor and equipment costs already covered with the base bid price, as that may directly impact your price and result in that final price not being the lowest sealed bid received

SUBTOTAL $ - 0

Overhead%$ - 0
Profit%$ - 0
Bonds%$ - 0

Grand Total (OPTION #1) $ - 0

Grand Total (Base Bid + Option #1) $ - 0

Printed: &D &T &Z&F

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.