Attachment_-_Drawings-Plans.pdf

PDF 8 MB Posted

Attached to
Boardwalk Replacement @ CUVA
Solicitation number
140P6426B0005
Issued by

About this file

This is a set of construction documents for the Stumpy Basin Boardwalk Replacement project located in Cuyahoga Valley National Park, Ohio, prepared at 100% design completion as of June 17, 2025. The documents are prepared in accordance with Design Development (Title I) standards and include comprehensive construction drawings, specifications, and technical details.

The project scope encompasses the complete replacement of the existing Ohio & Erie Canal Boardwalk Trail with a new structurally sound boardwalk system. Key work includes demolition of the existing boardwalk (consisting of decking, piles, and support structure), removal of associated asphalt pavement and gravel areas, vegetation clearing, tree removal, and construction of a new proposed boardwalk with proper alignment, grading, and restoration. The new boardwalk design incorporates treated timber decking with helical piles as foundation elements, curved profile sections with varying radii (ranging from 275 feet to 650 feet), stabilized rest area decks on both sides, and an asphalt approach pavement matching existing types and thickness. The construction documents include 17 sheets: site plans with demolition and proposed layouts, plan and profile drawings across five sheets, structural plans with elevations and connection details, construction details for curved profiles, miscellaneous details for bench seating and asphalt surfaces, asphalt approach cross-sections, and topographic surveys. The project is registered under Professional Engineer Jeremy Connor (Ohio License E-90669) with design and civil engineering services provided by Hurst-Rosche, Inc. (Hillsboro, Illinois) and architectural services by Bailey Edward (Chicago, Illinois).

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mark Sheet REVISION Date Initial QUALITY DESIGN CERTIFICATION

Prepared in Accordance with Design Development (Title I)

Variance from Design Development (Title I) Approved by Superintendent on

Construction Drawing Not Preceded by Design Development (Title I)

OR

OR

Project Manager Date

STUMPY BASIN BOARDWALK REPLACEMENT

STUMPY BASIN BOARDWALKDrawing No.

Date

A/E FIRM

PRIME:

BAILEY EDWARD,

CHICAGO, IL

HURST-ROSCHE, INC

HILLSBORO, IL

CONSTRUCTION DOCUMENTS 100%

SUB

SHEET SHEET TITLE OF SHEET

INDEX

01 COVER SHEET

04 C101 SITE PLAN - DEMO PLAN

05 C102 SITE PLAN - DEMO PLAN

02 G101 GENERAL NOTES

PROJECT

LOCATION

06 C103 PLAN AND PROFILE - PROPOSED BOARDWALK

07 C104 PLAN AND PROFILE - PROPOSED BOARDWALK

08 C105 PLAN AND PROFILE - PROPOSED BOARDWALK

09 C106 PLAN AND PROFILE - PROPOSED BOARDWALK

10 C107 PLAN AND PROFILE - PROPOSED BOARDWALK

50% CONSTRUCTION DOCUMENTS 3/17/2025

11 C108 MISCELLANEOUS DETAILS

12 C109 ASPHALT APPROACH - CROSS-SECTIONS

100% CONSTRUCTION DOCUMENTS 6/17/2025

03 G102 STAGING AND ACCESS PLAN

13 S101 STRUCTURAL PLANS, ELEV, AND DETAILS

14 S102 CONSTRUCTION DETAILS - CURVED PROFILE

REGIST ERED

PROFES S I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

E-90669

TOPOGRAPHIC SURVEY

TOPOGRAPHIC SURVEY

TOPOGRAPHIC SURVEY

GENERAL NOTESG101

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g

3/

/2

8:

:0

AM

REGIST ERED

PROF ESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

E-90669

OF

PMIS/PKG. NO.

SHEET

DRAWING NO.

STAGING AND ACCESS

PLANG102

X

P ro je c ts

\C u rr e n t\

-0

B a ile y E d w a rd

S tu m p y B a s in

N P

S \D ra w in g s \C iv il\

-0

A e ri a l E x h b it .d w g

/1

/2

:5

:0

A M

REGIST ERED

PROFES S I ONA L ENG I N

EE

R

ST

ATE OF OHIO

JEREMY

CONNOR

SITE PLAN -

DEMO PLANC101

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

SITE PLAN-

DEMO PLANC102

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROF ESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

PLAN AND PROFILE -

PROPOSED BOARDWALKC103

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

PROPOSED BOARDWALKC104

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

PROPOSED BOARDWALKC105

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

PROPOSED BOARDWALKC106

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

PROPOSED BOARDWALKC107

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

SHEET

DRAWING NO.

MISCELLANEOUS DETAILC108

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

B as e.

dw g 3/

/2

8:

:0

AM

REGIST ERED

PROFESS I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

SHEET

DRAWING NO.

ASPHALT APPROACH-

CROSS SECTIONSC109

X:

\P ro je ct s\

C ur re nt

\1

-0

Ba ile y

Ed w ar d

St um py B as in

N

PS

\D ra w in gs \C iv il\

2-

D es ig n.

dw g

3/

/2

8:

:0

AM

REGIST ERED

PROFES S I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

STUMPY

BASIN BOARDWALK REPLACEMENT

/2

/2

:2

:2

A

M

F ile

P a th

OF

PMIS/PKG. NO.

SHEET

CUYAHOGA VALLEY NATIONAL PARK

TITLE OF SHEET DRAWING NO.

14STUMPY BASIN BOARDWALK

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

06-16-25

STRUCTURAL PLANS,

ELEVS. AND DETAILSS101XX

JV

ZT

N6235314 No.2

A/E FIRM

PRIME:

BAILEY EDWARD

CHICAGO, IL

STRUCTURAL ENGINEER

HURST-ROSCHE, INC.

HILLSBORO, IL

CIVIL ENGINEER

HURST-ROSCHE, INC.

HILLSBORO, IL

REGIST ERED

PROFES S I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

/2

/2

:2

:2

A

M

F ile

P a th

OF

PMIS/PKG. NO.

SHEET

CUYAHOGA VALLEY NATIONAL PARK

TITLE OF SHEET DRAWING NO.

14STUMPY BASIN BOARDWALK

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

06-16-25

CONSTRUCTION DETS.

- CURVED PROFILESS102XX

JV

ZT

N6235314 No.2

A/E FIRM

PRIME:

BAILEY EDWARD

CHICAGO, IL

STRUCTURAL ENGINEER

HURST-ROSCHE, INC.

HILLSBORO, IL

CIVIL ENGINEER

HURST-ROSCHE, INC.

HILLSBORO, IL

REGIST ERED

PROFES S I ONA L ENG I NEE

R

ST

ATE OF OHIO

JEREMY

CONNOR

Garcia Surveyors, Inc.

15 17

192-0923 Base-G001
Sheets and Views
G001
192-0923 Base-G101
Sheets and Views
G101
192-0923 Aerial Exhbit-G102
Sheets and Views
G102
192-0923 Base-C101
Sheets and Views
C101
192-0923 Base-C102
Sheets and Views
C102
192-0923 Base-C103
Sheets and Views
C103
192-0923 Base-C104
Sheets and Views
C104
192-0923 Base-C105
Sheets and Views
C105
192-0923 Base-C106
Sheets and Views
C106
192-0923 Base-C107
Sheets and Views
C107
192-0923 Base-C108
Sheets and Views
C108
192-0923 Design-C108
Sheets and Views
C108
192-093_Stumpy_S-Sheets-S101
Sheets and Views
S101
192-093_Stumpy_S-Sheets-S102
Sheets and Views
S102

File details come from the government source that posted it. Updated .