Bid_Schedule_-_Boardwalk_Replacement.pdf
PDF 219 KB Posted
- Attached to
- Boardwalk Replacement @ CUVA
- Solicitation number
- 140P6426B0005
About this file
This is a Bid Schedule and Price Schedule Worksheet for a construction project at Cuyahoga Valley National Park under the U.S. Department of Interior, National Park Service. The project involves Boardwalk Replacement at Stumpy Basin Boardwalk.
The solicitation requires offerors to submit pricing for a Base Bid and one optional line item (Bid Option 1). Both the base bid and option must be priced on a lump-sum basis with total prices rounded to whole dollars; failure to provide pricing for all required line items may render the proposal non-responsive. The Base Bid encompasses five primary construction work categories: Site Clearing, Site Demolition/Removals, Earthwork, Installation of New Boardwalk, and Mobilization/Demobilization. Each category requires offerors to separately itemize Materials, Labor, and Equipment costs, with subtotals for overhead and profit percentages, and bonds. Bid Option 1 allows for substitution of 3x Rough Sawn S1S Treated Lumber Decking in place of the 2x treated lumber specified in the base bid, with strict instructions that only additional labor and equipment costs associated with this material substitution should be included to avoid duplicate costs and inflated pricing. The Price Schedule Worksheet provides line items for all cost components, allowing offerors to calculate their grand totals for both the base bid and option, resulting in a final Grand Total (Base Bid + Option #1).
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Price/Unit Total Price
1 Base Bid 1 Lump Sum $ - $ -
2 Bid Option 1 1 Lump Sum $ - $ -
NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.
Grand Total (Base Bid + Option #1)
BID SCHEDULE
US Department of Interior National Park Service Park Location: Cuyahoga Valley National Park Project Title: Boardwalk Replacement
Unit Quantity Price/ Unit Subtotal
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
SUBTOTAL
Bonds Profit
OPTION #1 - 3x ROUGH SAWN S1S Treated Lumber Decking (in lieu of 2x treated lumber) and all associated work/items
- Equipment
Grand Total (BASE BID)
Overhead
- Materials
- Labor
Overhead
SUBTOTAL
Profit Bonds
Grand Total (OPTION #1)
NOTE: Only include additional labor and equipment costs associated with this material being utilized in lieu of the material being provided with the base bid // refrain from adding duplicate labor and equipment costs already covered with the base bid price, as that may directly impact your price and result in that final price not being the lowest sealed bid received
- Materials
- Labor
- Equipment
- Materials
- Labor
- Equipment
- Materials
- Labor
BASE BID - SITE DEMOLITION/REMOVALS and all associated work/items
- Equipment
BASE BID - INSTALLATION OF NEW BOARDWALK and all associated work/items
BASE BID - Mobilization/Demobilization
- Mob/Demob Costs
BASE BID - EARTHWORK and all associated work/items
- Materials
- Equipment
- Labor
Grand Total (Base Bid + Option #1)
Construction Items
National Park Service U.S. Department of Interior Cuyahoga Valley National Park
Stumpy Basin Boardwalk
PRICE SCHEDULE WORKSHEET
BASE BID - SITE CLEARING and all associated work/items
PROJECT: Boardwalk Replacement
| Bid Schedule |
| Price Schedule Wksht |
File details come from the government source that posted it. Updated .