This is an Addendum to Bidding Documents for the Cuyahoga Valley National Park Stumpy Basin Boardwalk Replacement Project located in Brecksville, Ohio (PMIS No. 245391). The addendum modifies the original specifications and drawings issued by the National Park Service, Interior Regions 3, 4, and 5, with an effective date of 19 May 2026.
Key modifications include: (1) extending the Period of Performance from 180 calendar days to 270 calendar days after issuance of the Notice to Proceed; (2) requiring the contractor to provide and plant 60 trees (20 trees each of three species) with a minimum 1-inch caliper, grown bag or container nursery stock, within the limits of disturbance while avoiding encroachment on the new boardwalk structure, with locations flagged in the field based on suitable placement; (3) clarifying that the 10-inch round timber piece length shall vary based on finish elevation and helical anchor saddle position at installation, with the member cut to fit; and (4) modifying connector specifications to require APVA21 connectors be hot-dip galvanized or manufacturer's standard corrosion-resistant coating (such as ZMAX by Simpson Strong Tie or equivalent) rather than stainless steel, with all associated fasteners compatible with the connector coating per manufacturer recommendations. Additionally, the addendum reassigns quality control and testing responsibilities from the Contracting Officer to the Contractor for aggregates, asphalt paving, compaction and moisture testing, and eliminates references to Section 01 40 00 (Quality Requirements) and the requirement to attach completed Statements of Structural Tests and Inspections to Division 1 specifications.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDM-1, Page 1
ADDENDUM NO. ADDM-01 National Park Service – Interior Regions 3, 4 5 Facilities, Planning and Infrastructure to the 601 Riverfront Drive Bidding Documents Omaha, NE 68102 for 19 May 2026
CUYAHOGA VALLEY NATIONAL PARK – STUMPY BASIN BOARDWALK REPLACEMENT PROJECT
15610 Vaughn Road Brecksville, OH 44141 PMIS No. 245391
NOTICE TO BIDDERS: The Specifications and Drawings for the above referenced project are hereby amended as follows:
SPECIFICATIONS – GENERAL
ITEM NO. G-1 SECTION 01 11 00 SUMMARY OF WORK
a. Part 1.2.D., Period of Performance: REVISE sentence citing 180 calendar days to state
‘The Period of Performance work shall be completed within 270 calendar days after issuance of the Notice to Proceed’.
DRAWINGS
ITEM NO. G-2 SHEET C103 SHEET NOTES
a. Note 2 pertaining to planting trees, ADD the following Sentences: “THE CONTRACTOR
SHALL PROVIDE AND PLANT A TOTAL OF 60 TREES CONSISTING OF 20 TREES
PER EACH OF THE 3 SPECIES. TREES SHALL BE A MINIMUM OF 1-INCH CALIPER
GROW BAG OR CONTAINER NURSURY GROWN STOCK. TREES SHALL BE
PLANTED WITHIN THE LIMITS OF DISTURBANCE, AVOIDING ENCROACHMENT
ON NEW BOARWALK STRUCTURE. CONTRACTOR AND COR TO FLAG
LOCATIONS IN THE FIELD BASED ON SUITABLE PLACEMENT WITHIN THE
LANDCAPE CONDUSIVE TO THE TREE’S VIABILITY.”
ITEM NO. G-3 SHEET S101, DETAIL 2 TYPICAL BOARDWALK ELEVATION AND DETAILS
a. ADD to note stating ‘10” TIMBER PIECE’ the following: “10” ROUND TIMBER PIECE –
LENGTH TO VARY BASED ON FINISH ELEVATION OF BOARDWALK AND
POSIITION OF HELICAL ANCHOR SADDLE AT INSTALLATION. CUT MEMBER TO
FIT.”
b. DELETE ‘STAINLESS STEEL’ from leader note stating ‘STAINLESS STEEL APVA21 ANGLE…” and add notation that ‘APVA21 CONNECTORS SHALL BE HOT-DIP
GALVANIZED OR MANUFACTURER’S STANDARD CORROSION RESISTANT
COATING (E.G. ZMAX BY SIMPSON STRONG TIE OR EQUIVALENT) RATHER
THAN STAINLESS STEEL. ALL ASSOCIATED FASTENERS FOR THESE
CONNECOTRS SHALL BE COMPATIBLE WITH THE CONNECTOR COATING IN
ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS.’
SPECIFICATIONS
ITEM NO. G-4 SECTION 32 05 16, AGGREGATES, PART 2.3 A.
DELETE ‘Section 01 40 00 – Quality Requirements:Testing and inspection services’ in its entirety.
ADDM-1, Page 2
ITEM NO. G-5 SECTION 32 05 16, AGGREGATES, PART 3.4 B and C.
DELETE reference to CONTRACTING OFFICER in parts B and C and REPLACE with THE CONTRACTOR. The Contractor shall be responsible for conducting all Testing and Analysis under
Source Quality Control.
ITEM NO. G-6 SECTION 32 11 23, AGGREGATE BASE COURSES, PART 3.4 A.
DELETE ‘Section 01 40 00 – Quality Requirements: Tolerances’ in its entirety.
ITEM NO. G-7 SECTION 32 11 23, AGGREGATE BASE COURSES, PART 3.5, FIELD QUALITY
CONTROL, Part A.
DELETE reference to CONTRACTING OFFICER in part A and REPLACE with THE CONTRACTOR. The Contractor shall be responsible for conducting all compaction and moisture testing under Field
Quality Control.
ITEM NO. G-8 SECTION 32 12 16, ASPHALT PAVING, PART 1.4 A.
DELETE reference to Contracting Officer and Specification Section 01 40 00 and REVISE paragraph to read as follows: ‘Testing and inspection bituminous concrete mixes and testing of placed aggregate base course and hot mix asphalt pavement will be performed by the Contractor.
Testing and inspection will be performed in a manner to minimize disruption of work.
ITEM NO. G-9 APPENDIX B: STATEMENT OF STRUCTURAL TESTS AND SPECIAL INSPECTIONS,
PART ‘INSTRUCTIONS’, NUMBER 2
DELETE ‘Attach completed Statement of Structural Tests and Inspections to the end of NPS DSC
Division 1 Specifications Section 01 40 00 Quality Requirements’ in its entirety.
END OF ADDENDUM