Bid_Form_Milliken9017FR20.pdf

PDF 386 KB Posted

Attached to
Milliken Raw Water Pipeline Hardening HMGP
Solicitation number
2025-IFB - PC-064
Issued by
Napa County, California

About this file

This document is a Bid Form for the City of Napa Public Works Department for the Milliken Raw Water Pipeline Hardening HMGP project (Project Number 90176R20). The bid form outlines the requirements for potential contractors to submit a proposal for the project, including provisions for base bid pricing, potential alternates, and compliance with various municipal and state regulations. Bidders are required to thoroughly examine contract documents, verify worksite conditions, and certify their responsibility, non-discrimination practices, and compliance with local ordinances such as the Napa Municipal Code Chapter 2.92.

The bid requires a bid security of 10% of the maximum bid amount, which can be submitted as either a cashier's check or a bid bond. Successful bidders must be prepared to execute the contract within ten days of award, submit 100% payment and performance bonds, and provide required insurance certificates. Additional compliance requirements include adhering to the Iran Contracting Act (for contracts exceeding $1,000,000), submitting Certificates of Reported Compliance for off-road vehicles, and demonstrating an affirmative action program for non-discriminatory hiring practices. The form is designed to ensure comprehensive contractor qualifications and commitment to project specifications and municipal standards.

View the file

Other files

File Type Posted
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#15_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#14_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#8_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#6_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#3_Revision).pdf PDF
Subcontractor_List.pdf PDF
Noncollusion_Declaration.pdf PDF
Bid_Form_Milliken9017FR20.pdf PDF
Bid_Bond_Milliken9017FR20.pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP.pdf PDF
Plans_2025-09-24.pdf PDF
Milliken_Pipeline_PreBid_CityofNapa_WaiverAndReleaseOfLiability.pdf PDF
Technical_Specifications.pdf PDF
2_CFR_Part_200_(in_effect_on_10-01-2017).pdf PDF
17MITRIP-17002_City_of_Napa_MSA_Exhibit_D.pdf PDF
MilPipeFEMAESA3.pdf PDF
MilPipeFEMAESA2.pdf PDF
Warranty_Bond_(1).pdf PDF
Contract_Template_(2024-2-13).docx DOCX document
MilPipeFEMAESA4.pdf PDF
Forms_0-8_Exhibit_13A-I_&_Supplemental_Forms_A-D_Section_3_Plan_Packet.pdf PDF
DavisBacon_CA20250007_downloaded20250228.pdf PDF
Payment_Bond.pdf PDF
MilPipeFEMAESA5.xlsx XLSX spreadsheet
Performance_Bond.pdf PDF
FEMA_Public_Assistance_Contracting.pdf PDF
MilPipeFEMAESA1.pdf PDF
DR4344-284_Napa_Milliken_Geotechnical_Eval_Miller_Pacific_3426.001rpt_2023-05-31.pdf PDF
Milliken_Pipeline_Available_Laydown_Space_20250821.pdf PDF
Bidder's_Questionnaire.pdf PDF
Milliken_Treatment_Plant_Directions_and_Parking.pdf PDF
Appendix_E_of_the_Title_VI_Assurances.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Napa Public Works Contract Documents Form 4.1 (2024-1-30)

Project Title _______________ BID FORM Project Number____________

Bid Form

<________________________________> Project

______________________________________________________ (“Bidder”) hereby submits this Bid Form to the City of Napa, a California charter city (“City”), for the above-referenced project (“Project”) in response to the Notice Inviting Bids and in accordance with the Contract Documents referenced in the Notice.

1. Base Bid. Bidder proposes to perform and fully complete the Work for the Project as specified in the Contract Documents, within the time required for full completion of the Work, including all labor, materials, supplies, and equipment and all other direct or indirect costs including, but not limited to, taxes, insurance and all overhead for the following price (“Base Bid”):

2. Alternates. If the Bid Schedule includes bid alternate(s), Bidder proposes the pricing set forth therein for the specified alternate(s).

3. Addenda. Bidder agrees that it has confirmed receipt of or access to, and reviewed, all addenda issued for this bid. Bidder waives any claims it might have against the City based on its failure to receive, access, or review any addenda for any reason.

4. Bidder’s Certifications and Warranties. By signing and submitting this Bid Form, Bidder certifies and warrants the following:

4.1 Examination of Contract Documents. Bidder has thoroughly examined the Contract Documents and represents that, to the best of Bidder’s knowledge, there are no errors, omissions, or discrepancies in the Contract Documents, subject to the limitations of Public Contract Code § 1104.

4.2 Examination of Worksite. Bidder has had the opportunity to examine the Worksite and local conditions at the Project location.

4.3 Bidder Responsibility. Bidder is a responsible bidder, with the necessary ability, capacity, experience, skill, qualifications, workforce, equipment, and resources to perform or cause the Work to be performed in accordance with the Contract Documents and within the Contract Time.

4.4 Responsibility for Bid. Bidder has carefully reviewed this Bid Form and is solely responsible for any errors or omissions contained in its completed Bid Form. All statements and information provided in this Bid Form and enclosures are true and correct to the best of Bidder’s knowledge.

4.5 Nondiscrimination. In preparing this bid, the Bidder has not engaged in discrimination against any prospective or present employee or Subcontractor on grounds of race, color, ancestry, national origin, ethnicity, religion, sex, sexual orientation, age, disability, or marital status.

4.6 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Bidder is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.

4.7 Affirmative Action Program. Bidder will comply with the applicable requirements of NMC

Chapter 2.92, including the requirement for Bidder and its “principal subcontractors,” as defined in NMC section 2.92.020, to perform the affirmative actions set forth therein pertaining to nondiscriminatory hiring and employment practices. This certification constitutes the “affirmative action program” of the Bidder and its “principal subcontractors,” pursuant to NMC section 2.92.050. Bidder understands that the City may request further documentation evidencing the Bidder’s and its principal subcontractors’ agreement to and compliance with the affirmative action program.

4.8 Certificate of Reported Compliance. If the Project involves the use of vehicles subject to the Off-Road Regulation, Bidder will submit to City valid Certificates of Reported Compliance for its fleet and its listed Subcontractors, if applicable, in accordance with the Off-Road Regulation, within three Working Days following a request from City. (See Section 18 of the Instructions to Bidders.)

5. Award of Contract. By signing and submitting this Bid Form, Bidder agrees that if Bidder is awarded the Contract for the Project, then, within ten days following City’s issuance of the Notice of Award to Bidder, Bidder will do all of the following:

5.1 Execute Contract. Enter into the Contract with City in accordance with the terms of this Bid

Form, by signing and submitting to City the Contract prepared by City using the form included with the Contract Documents;

5.2 Submit Required Bonds. Submit to City a payment bond and a performance bond, each for

100% of the Contract Price, using the bond forms provided and in accordance with the requirements of the Contract Documents; and

5.3 Insurance Requirements. Submit to City the insurance certificate(s) and endorsement(s) as required by the Contract Documents.

6. Bid Security. As a guarantee that, if awarded the Contract, Bidder will perform its obligations under Section 5 above, Bidder is enclosing bid security in the amount of ten percent of its maximum bid amount in one of the following forms (check one):

____ A cashier’s check or certified check payable to City and issued by

_______________________________ [Bank name] in the amount of

____ A bid bond, using the Bid Bond form included with the Contract Documents, payable to

City and executed by a surety licensed to do business in the State of California.

This Bid Form is hereby submitted on _________________________, 20__.

s/ ___________________________________ ______________________________________

Name and Title s/ ___________________________________ ______________________________________ [See the Authorization and Execution Section Name and Title of Instructions to Bidders]

Company Name License #, Expiration Date, and Classification

Address DIR Registration #

City, State, Zip Phone

Contact Name Contact Email

END OF BID FORM

Text Field0: Milliken Raw Water Pipeline Hardening HMGP
Text Field1: Milliken Raw Water Pipeline Hardening HMGP
Text Field2: 9017FR20
Text Field3: Milliken Raw Water Pipeline Hardening HMGP
Text Field4: 9017FR20
Text Field5: Milliken Raw Water Pipeline Hardening HMGP
Text Field6: 9017FR20

File details come from the government source that posted it. Updated .