Bid Form _ Downtown Norcross Parking Improvem.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Downtown Norcross Parking Improvements
Solicitation number
PE-66780-NONST-2027-000000047
Issued by
Gwinnett County, Georgia

About this file

This is a bid form for the City of Norcross, Georgia's Downtown Norcross Parking Improvements project located at 65 Lawrenceville Street. The project encompasses parking and pedestrian facilities surrounding Norcross City Hall, including grading, storm drainage, paving, sidewalks, ADA improvements, retaining walls, landscaping, lighting, and associated site improvements. The bid form itemizes approximately 57 line items across multiple categories: civil general site items (demolition, earthwork, temporary protection measures), site work hardscape items (retaining walls, stairs, railings, site amenities, landscape, and stormwater infrastructure), roadway paving and pavement marking (asphalt paving, concrete curb and gutter, sidewalks, and specialized paving options), and electrical appurtenances (utility poles, light fixtures, and conduits). Key quantities include 1,153 square yards of concrete demolition, 2,949 square yards of asphalt demolition, 4,162 square yards of asphalt paving, 4,634 square feet of sidewalk, 9,865 square feet of driveable brick pavers, and 7,632 square feet of permeable pavers. Sealed bids must be submitted by 11:00 a.m. on September 28, 2026, in two printed copies and one electronic copy to the City of Norcross Public Works Department. A non-mandatory pre-bid meeting with optional site visit will be held on August 26, 2026, at 11:00 a.m. Questions must be submitted by email by 5:00 p.m. on September 7, 2026. All work must be completed within 315 calendar days following issuance of the Notice to Proceed.

The bid form requires contractors to complete the Schedule of Items for each stage of construction and provide total costs for each item, with bid prices including all direct, indirect, administrative, and incidental costs necessary to complete the work. Contractors are responsible for verifying all quantities, and all extended costs, subtotals, and the base bid must be calculated correctly. The base bid shall include all work shown on the drawings and described in the specifications, whether or not specifically listed as a separate bid item. The form indicates that all unit cost and extended cost fields are currently blank, requiring bidders to complete pricing information. No information regarding set-asides, incumbent contractors, funding sources, or total project budget is provided in this bid form document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

NOTE TO CONTRACTOR: Complete the Schedule of Items for each stage of construction and provide a total cost for each item. Bid prices shall include all direct, indirect, administrative, and incidental costs necessary to complete the Work in accordance with the Contract Documents. Quantities shown are for bidding purposes only; the Contractor is responsible for verifying all quantities. Verify that all Extended Costs, Subtotals, and the Base Bid are calculated correctly. The Base Bid shall include all Work shown on the Drawings and described in the Specifications, whether or not specifically listed as a separate bid item.
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
Item NumberDescriptionQuantityUnitUnit CostTotal Extended Cost
Civil General Site Items
1General Requirements and Mobilization1LS$ - 0
2Traffic Control1LS$ - 0
3Demolition and removal- Concrete1153SY$ - 0
4Demolition and removal- Asphalt2,949SY$ - 0
5Demolition and removal - Curb and Gutter1673LF$ - 0
6Demolition and removal - storm pipe645LF$ - 0
7Demolition and removal - storm structures13EA$ - 0
8Demolition and salvage - site amenities1LS$ - 0
9Clearing2.18AC$ - 0
6Earthwork1200CY$ - 0
9Haul in650CY$ - 0
10Haul off0CY$ - 0
7Temporary Construction Fence400LF$ - 0
8Temporary Sediment trap w outlet protection13EA$ - 0
8Tree Protection Fence1025LF$ - 0
9additional Tree Protection measures per plans1EA$ - 0
9Silt Fence (per single row)1165LF$ - 0
10Construction Exit1EA$ - 0
11Temporary Grassing,Mulching, Dust Control (DS1/DS2/Du)1.68AC$ - 0
12Stone Outlet protection1EA$ - 0
13Inlet Protection and retrofit1EA$ - 0
SUBTOTAL FOR CIVIL SITE ITEMS$ - 0
Site Work
Hardscape Items
14CIP Concrete Retaining Wall2300SF$ - 0
15Concrete Stairs - 12" tread & 6" riser85SF$ - 0
16Steel pipe handrails30LF$ - 0
17decorative railing on walls503LF$ - 0
Site Amenities
18Project sign (temporary sign w project information)1LS$ - 0
19removable bollards17EA$ - 0
20concrete wheelstops31EA$ - 0
21ADA parking signage3EA$ - 0
22Park Bench2EA$ - 0
23Outdoor tables with seating and shade umbrellas4EA$ - 0
24Tree grate with frame and tree guard6EA$ - 0
2540' flagpole assembly1EA$ - 0
24Pond gate1EA$ - 0
Landscape
25Automated, in-ground irrigation system1EA$ - 0
26Replacement trees (6" cal.) from Select Trees8EA$ - 0
27Replacement trees (4" cal.) from Select Trees13EA$ - 0
28Replacement trees (3" cal.)28EA$ - 0
29Replacement trees (8' ht.)15EA$ - 0
30Shrubs and groundcover (3 Gal. or ht based per plans)299EA$ - 0
31Shrubs (7-10 gal)13EA$ - 0
32Ornamental Grasses/Perennials (1 Gal.)1802EA$ - 0
33Sod Installed9107SF$ - 0
33Bioretention media mix215CY$ - 0
34Deeproot Silvacell 1X units with soil media126EA$ - 0
Stormwater
3524" RCP pipe409LF$ - 0
3618" RCP pipe635LF$ - 0
378" N-12 HDPE pipe drainline and accessories140LF$ - 0
368"-15" drain inlet10EA$ - 0
37Duratrench 6" trench drain66LF$ - 0
38Duratrench 12" trueradius slot drain67LF$ - 0
37Stormwater manhole/ catch basin5EA$ - 0
38Stormwater drop inlet7EA$ - 0
39doghouse/existing Storm structure connection3EA$ - 0
40Outlet control structure1EA$ - 0
41Water Quality structure2EA$ - 0
428" perforated PVC underdrain + cleanouts100LF$ - 0
SUBTOTAL FOR SITE WORK$ - 0
Line #DescriptionQuantityUnitUnit CostTOTAL
Roadway
Paving & Pavement Marking
43Asphalt Paving4162SY$ - 0
44Pavement Marking, Wheelstops, Signs1LS$ - 0
Concrete Paving/Curb
4524" Concrete Curb and Gutter2250LF$ - 0
46ADA curb ramps600SF$ - 0
46Driveable concrete paving and ribbon curbing250SY$ - 0
474" Sidewalk4634SF$ - 0
Specialized Paving
48Driveable Brick pavers9865SF$ - 0
4912"x12" pavers in brick plaza18EA$ - 0
50Permeable pavers7632SF$ - 0
51Bioretention island curbing additional depth165LF$ - 0
SUBTOTAL FOR ROADWAY$ - 0
Electrical
Appurtenances
52Relocated power /utility pole3EA$ - 0
53New /reused Acorn light poles+fixtures14EA$ - 0
54New parking lot light poles+fixtures4EA$ - 0
55New parking lot light fixture mounted on utility pole4EA$ - 0
56New bollard lighting12EA$ - 0
57Low Voltage lighting system1EA$ - 0
572" PVC power conduits500LF$ - 0
SUBTOTAL FOR ELECTRICAL$ - 0
TOTAL PROJECT COST (BASE BID):$ - 0

File details come from the government source that posted it. Updated .