03 Stormwater Report for Downtown Norcross Pa.pdf
PDF 26 MB Posted
- Attached to
- Downtown Norcross Parking Improvements
- Solicitation number
- PE-66780-NONST-2027-000000047
- Issued by
- Gwinnett County, Georgia
About this file
Summary
This is a Stormwater Management Report prepared by Columbia Engineering and Services, Inc. for the City of Norcross regarding parking and pedestrian facility improvements at 65 Lawrenceville Street, Norcross, Georgia. The project encompasses approximately 6.11 acres of downtown Norcross property containing City Hall, parking areas, and associated infrastructure. The proposed work includes expansion of parking facilities, creation of a public plaza area with enhanced landscaping, grading, sidewalks, ADA improvements, retaining walls, lighting, and installation of multiple stormwater best management practices (BMPs). The project must be completed within 315 calendar days following issuance of the Notice to Proceed. Sealed bids are due by 11:00 a.m. on September 28, 2026, submitted to the City of Norcross Public Works Department at 345 Lively Avenue. A non-mandatory pre-bid meeting with optional site visit is scheduled for August 26, 2026, at 11:00 a.m. at the same address. Questions must be submitted by email to Charlene Marsh, Procurement and Capital Projects Manager, no later than 5:00 p.m. on September 7, 2026. Sealed bids will be publicly opened and read aloud at 11:05 a.m. on September 28, 2026.
The stormwater management design incorporates runoff reduction practices and water quality facilities to address quantity and quality management requirements. The analysis shows post-development peak flows decrease across all storm events (1-year through 100-year) compared to pre-development conditions due to implementation of bioretention areas, permeable paver systems, a dry extended detention pond, and Contech CDS Hydrodynamic Separators. The design achieves 83% total suspended solids (TSS) removal across the treated acreage. All stormwater conveyance systems were sized for the 25-year storm event and verified for the 100-year event. The report includes detailed hydrologic analysis, downstream condition assessment, operations and maintenance plans for all BMPs, and soil infiltration testing results meeting minimum infiltration rates. Bidders should submit two printed copies and one electronic copy (USB flash drive) of their bid packages, clearly marked as "ITB PW 27-01 DOWNTOWN NORCROSS PARKING IMPROVEMENTS."
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORMWATER
MANAGEMENT REPORT FOR
DOWNTOWN NORCROSS
PARKING IMPROVEMENTS
Certifying seal or stamp:
07/20/26
Date:
06/05/2026 Revised:
07/20/2026
Project Name:
Downtown Norcross Parking Improvements
CES #6170.05
Project Address:
65 Lawrenceville St Norcross, GA 30071
Owner:
City of Norcross
PREPARED BY:
Columbia Engineering and Services, Inc.
2862 Buford Highway, Suite 200 Duluth, GA 30096
770.925.0357
Table of Contents
Introduction
Stormwater Quantity Management
Pre-Development Conditions Hydrologic Analysis
Post-Development Conditions Hydrologic Analysis
Methodology
Results
Stormwater Quality Management
Stormwater Conveyance Calculations
Analysis of Downstream Conditions
Exhibits:
Exhibit A Location Map
Exhibit B Pre-Developed Drainage Map
Exhibit C Post-Developed Drainage Map
Exhibit D BMP Map
Exhibit E1 Dry Pond A OCS Detail
Exhibit E2 Dry Pond A Cross-Section
Exhibit E3 Orifice End-Cap Detail
Exhibit F Storm Pipe Table
Exhibit G Downstream Drainage Map
Appendices:
Appendix A Site Data Information
Pre- and Post- Developed Curve Number Calculations
Time of Concentration Calculations
Pond Stage Storage Calculations
Stream Channel Protection Calculations
Permeable Pavers Runoff Reduction Calculations
Bioretention Area Runoff Reduction Calculations
Appendix B Hydraflow Hydrographs Return Period Recap and Summary Report
Hydraflow Hydrographs 1 through 100-Year Report with Pond Report
Appendix C Contech CDS® Documents and Details
Appendix D Stormwater Quality Site Development Review Tool
Appendix E City of Norcross Runoff Reduction Infeasibility Form
Appendix F United Consulting Soil Infiltration Testing Results
Appendix G Downstream Analysis Calculations
Downstream Analysis Hydraflow Hydrographs Return Period
Downstream Analysis Hydraflow Hydrographs Summary Report
Appendix H NOAA Point Precipitation Frequency Estimates for Norcross, Georgia
Appendix I Operations and Maintenance Plans for Bioretention Area
Operations and Maintenance Plans for Permeable Bricks
Inspection and Maintenance Guide for Contech CDS®
Operations and Maintenance Plans for Dry Extended Detention Basin
Page | 1
Introduction
The subject site is located at 65 Lawrenceville Street in Norcross, Gwinnett County, Georgia (see
Exhibit A, Location Map). The approximately 6.11-acre site is currently developed as part of downtown Norcross and contains the existing City Hall building, associated parking areas, and supporting infrastructure. The proposed project consists of improvements to the existing parking facilities, including the addition of new parking spaces, and redevelopment of portions of the site to create a public plaza area with enhanced landscaping. The project also incorporates several stormwater best management practices (BMPs), including the construction of a stormwater detention pond and other measures designed to improve stormwater management and water quality.
The proposed stormwater management facilities will be analyzed in this report addressing
Stormwater Quantity Management, Stormwater Quality Management and Analysis of
Downstream Conditions for the development per City of Norcross requirements.
Stormwater Quantity Management
Pre-Development Conditions Hydrologic Analysis
The subject site consists of an existing City Hall building with associated parking areas and an adjacent wooded tract. The combined property encompasses approximately 6.11 acres.
For purpose of this analysis, the overall project site has been separated into six drainage basins:
On-site Drainage Basin A1, On-site Drainage Basin A1 Bypass, Off-site Drainage Basin A1, On-site
Drainage Basin A2, Off-site Drainage Basin A2 and Off-site Drainage Basin A3. See Exhibit B, Pre-
Developed Drainage Map. All drainage basins within the study area ultimately discharge to Beaver
Ruin Creek.
On-Site Drainage Basin A1 consists of 2.93 acres of the site of which 1.59 acres are impervious from this existing parking lot and portion of City Hall. The basin drains in a northeasterly direction to Study Point A. On-Site Drainage Basin A1 has a curve number of 77 and a time of concentration of 13.33 minutes.
On-site Drainage Basin A1 Bypass consists of 1.58 acres of the site of which 1.43 acres are impervious. This basin is the Historic Norcross Cotton Gin that will essentially remain unchanged.
The basin drains in a northeasterly direction to Study Point A. On-site Drainage Basin A1 Bypass has a curve number of 96 and a minimum time of concentration of 5.0 minutes.
Off-site Drainage Basin A1 consists of 2.21 acres of which 0.94 acres are impervious. This basin consists of the off-site area coming from the railroad right of way and Wingo Street onto the site.
The basin drains in a northeasterly direction to Study Point A. Off-site Drainage Basin A1 Bypass has a curve number of 82 and a minimum time of concentration of 11.54 minutes.
On-site Drainage Basin A2 consists of 1.61 acres of the site of which 1.11 acres are impervious.
The basin drains in a northeasterly direction to Study Point A. On-Site Drainage Basin A2 has a curve number of 92 and a time of concentration of 9.08 minutes.
Page | 2
Off-site Drainage Basin A2 consists of 0.05 acres of the site of which 0.04 acres are impervious.
The basin drains in a northeasterly direction to Study Point A along Lawrenceville Street. Off-Site
Drainage Basin A2 has a curve number of 93 and a minimum time of concentration of 5.0 minutes.
Off-site Drainage Basin A3 consists of 0.14 acres of the site of which 0.13 acres are impervious.
The basin drains in a northeasterly direction to Study Point A along Jones Street. Off-Site Drainage
Basin A3 has a curve number of 97 and a minimum time of concentration of 5.0 minutes.
See Appendix A for the pre-developed basin information.
Post-Development Conditions Hydrologic Analysis
The proposed development consists of the redevelopment and expansion of the existing parking facilities, including the addition of new parking spaces and the construction of a decorative paver plaza area that may be utilized for event parking. The total land disturbance associated with the proposed development is approximately 2.18 acres.
For the purposes of this analysis, the post-development project site has been separated into six drainage basins: On-site Drainage Basin A1, On-site Drainage Basin A1 Bypass, Off-site Drainage
Basin A1, On-site Drainage Basin A2, Off-site Drainage Basin A2, and Off-site Drainage Basin A3.
These drainage basin boundaries are shown on Exhibit C, Post-Development Drainage Map.
Similar to the pre-development conditions, runoff from all drainage basins within the study area is conveyed through the existing drainage network and ultimately discharges to Beaver Ruin
Creek.
On-Site Drainage Basin A1 consists of 2.99 acres of the site of which 1.99 acres are impervious.
The increase in impervious area is primarily attributable to the addition of new parking facilities.
The basin drains in a northeasterly direction to Study Point A. On-Site Drainage Basin A1 has a curve number of 86 and a time of concentration of 5.30 minutes via a pipe network. Stormwater runoff from this basin will be treated through multiple BMPs. Although a portion of the parking area within the basin will remain unchanged, the entire drainage basin will be routed through the proposed BMP facilities. By treating the entire basin, including existing impervious surfaces, the proposed improvements provide an overall reduction in post-development runoff rates and volumes from the site.
On-site Drainage Basin A2 consists of 1.54 acres of the site of which 1.01 acres are impervious.
The basin drains in a northeasterly direction to Study Point A. Compared to the pre-development condition, the basin has been slightly reduced in size and contains less impervious area as a result of the proposed parking lot reconfiguration. On-Site Drainage Basin A2 has a curve number of 90 and a time of concentration of 8.50 minutes.
On-Site Drainage Basin A1 Bypass is the only on-site drainage basin that remains unchanged from the pre-development condition. Similarly, Off-Site Drainage Basin A1, Off-Site Drainage Basin A2
Bypass, and Off-Site Drainage Basin A3 are unchanged from the pre-development condition. No modifications to the drainage area, land cover characteristics, or drainage patterns are proposed as part of the development; therefore, the hydrologic characteristics of these basins remain unchanged.
Page | 3
Off-Site Drainage Basin A2 Bypass remains unchanged from the pre-development conditions. No modifications to the drainage area, land cover characteristics, or drainage patterns are proposed as part of the development.
Off-Site Drainage Basin A3 Bypass remains unchanged from the pre-development conditions. No modifications to the drainage area, land cover characteristics, or drainage patterns are proposed as part of the development.
See Appendix A for the post-developed basin information.
Methodology
According to the U.S. Department of Agriculture Soils Maps the onsite areas are comprised of
Group A and D Hydrologic type soil for the site. For the pre- and post-developed conditions, Open
Space/Landscape Area was used in good condition. The CN for impervious was set at 98.
The inflow hydrographs for the detention pond were calculated using the SCS method and generated using the HYDRAFLOW program by Autodesk, Inc. The rainfall intensity was obtained from the Rainfall Tables for Norcross, Georgia in the NOAA Atlas 14, Volume 9, Version 2 as shown in Appendix H and included as the Site Data Information in Appendix A. Pond performance for the 1, 2, 5, 10, 25, 50 and 100-year storm events were analyzed using the Reservoir Routing
Method. The SCS TR-55 method of determining time of concentration was used for all drainage basins in the pre-developed and post-developed conditions. Time of concentration calculation is included in Appendix A.
Results
The results of the computer analysis show that the post-developed peak flows for all Study Points from the pre-developed peak flows will not cause damage to the surrounding properties and are summarized below for the 1, 2, 5, 10, 25, 50 and 100-year storm events. Complete calculations area included in Appendix A and computer print outs are included in Appendix B.
Drainage Basin Summary Table
Drainage
Basin
Pre-
Developed
Area
(acres)
Post-
Developed
Area
(acres)
Pre-
Developed
CN
Post-
Development
CN
Pre-
Developed
Tc (min.)
Post-
Development
Tc (min.)
On-site Drainage
Basin A1
2.93 2.99 77 86 13.33 5.3
On-site Drainage
Basin A1 Bypass
1.58 1.58 96 96 5.0 5.0
Off-site Drainage
Basin A1
2.21 2.21 82 82 11.54 11.54
On-site Drainage
Basin A2
1.61 1.54 92 90 9.08 8.5
Off-site Drainage
Basin A2
0.05 0.05 93 93 5.0 5.0
Off-site Drainage
Basin A3
0.14 0.14 97 97 5.0 5.0
Study Point A Analysis Summary
Page | 4
Storm
Event
(years)
Total Allowable
Pre-Developed
Study Point
Flow
(cfs)
Total
Post-Developed
Study Point Flow with Bypass
(cfs)
Ponding
Elevation for
Pond A
(ft)
1 22.83 14.30 1016.56
2 27.07 18.07 1016.87
5 34.28 25.61 1017.31
10 40.67 32.04 1017.75
25 49.87 39.34 1018.44
50 57.31 43.85 1019.05
100 65.00 48.36 1019.39
As shown in the tables above, there is a decrease for the post-developed flows for the 1- through
100-year storm event for Study Point A. The reduction in post-development runoff is primarily attributable to the proposed stormwater management measures and treatment of the contributing drainage areas. Runoff from the site is piped to an existing downstream detention pond prior to passing beneath Lawrenceville Street through an existing culvert. The flow then discharges to an open drainage channel located along Mitchell Road and is subsequently conveyed through a series of existing storm drainage pipes. The stormwater system continues beneath Buford Highway before ultimately discharging into Beaver Ruin Creek.
Stormwater Quality Management
Runoff reduction practices are stormwater BMPs that reduce the volume of runoff entering the storm drainage system by disconnecting impervious and disturbed pervious surfaces. Any volume not captured by the runoff reduction measures will be treated in a water quality facility.
The first flush runoff from all on-site areas draining to the detention facilities should be treated in a water quality facility. The purpose of channel protection is to provide 24 hours of extended detention of the 1 year, 24-hour rainfall event to protect the downstream channel from scouring during the lower storm frequencies that typically occur more often and have historically not been detained. The required water quality volume and channel protection volume were calculated using the procedure detailed in the Georgia Stormwater Management Manual, 2016 edition.
In order to treat the stormwater runoff for this site, we proposed two bioretention area and seven permeable pavers systems. See the next page for the BMP Chart and Exhibit D for the BMP Map showing each drain basin to the bioretention area and permeable pavers systems. On-site
Drainage Basin A1 then drains to the dry extended pond to reduce the post-developed flows while safely passing the off-site drainage basin. The pond cross sections have been provided in Exhibit
E1, E2 and E3.
This report also includes the drawdown time calculations for the proposed bioretention area and permeable paver system, demonstrating that both stormwater management practices fully drain within the required 72-hour period. Supporting calculations are provided in Appendix A.
Page | 5
BMP Chart
BMP ID BMP Type
Runoff Reduction
Volume Required
(CF)
Runoff Reduction
Volume Provided
(CF)
Bio Area A Bioretention Area 312 612
Bio Area B Bioretention Area 219 566
PPA1 Permeable Paver System 2,156 1,316
PPA2 Permeable Paver System 71 530
PPA3 Permeable Paver System 34 162
PPA4 Permeable Paver System 86 513
PPA5 Permeable Paver System 345 706
PPA6 Permeable Paver System 243 682
PPA7 Permeable Paver System 278 466
The Site Development Review Tool as shown in Appendix D shows that a portion of the Runoff
Reduction volume was not met. The runoff reduction that was not captured via runoff reduction measures will be treated via two water quality devices. The Contech CDS Hydrodynamic
Separator was selected as it separates and traps trash, debris, sediment and hydrocarbons.
Contech CDS Unit detail and documentation including 80% removal efficiency has been provided in Appendix C. Please see the completed City of Norcross Runoff Reduction Infeasibility Form for
Determination of Infeasibility in Appendix E. Please see Appendix F for the soil infiltration testing results completed by United Consulting meeting the minimum 0.5 inches per hour.
The outlet orifices for the channel protection volumes were sized using the orifice equation to provide a detention time for a minimum of 24 hours. The pond is controlled through an Outlet
Control Structure as shown in E1, E2 and E3. Below is a summary of the results and complete calculations can be found in Appendix A.
Facility
CP
Orifice
Elev.
(ft)
CPv
Req’d/
Provided
(cf)
CP
Orifice
Size
(inch)
CPv
Elev.
(ft)
2 thru 25-
Year
Detention
Elevation
(ft)
Dry
Pond
1013.22 4,871 1.25 1015.00 1018.44
Per Georgia Stormwater Management Manual, the water quality BMP provided for a project is measured by determining the removal of total suspended solids (TSS). Onsite Drainage Basin A1
Bypass was not included since the pre- and post-conditions for this area remain unchanged. Per the Stormwater Quality Site Development Review Tool, after treatment with permeable pavers, bioretention basin, and Contech CDS Hydrodynamic Separator(Proprietary System), the TSS removal is 83% for all 4.53 acre of the site. See Appendix D for the Review Tool calculations.
Please see Appendix I for the Operations and Maintenance Plans for Bioretention Area, Permeable
Paver System, Dry Extended Detention Basin and for Contech CDS proprietary structure.
Page | 6
Stormwater Conveyance Calculations
Runoff rates for the storm water collection system were calculated using the Rational Method with a minimum time of concentration of 5 minutes and runoff coefficients of 0.35 for landscaped areas and 0.95 for impervious areas. The storm sewer system was sized for the 25-year storm event and checked for the 100-year storm event to determine if any structures would be flooded.
All pipes were analyzed for inlet and outlet control using the Storm Sewers extension program by
Autodesk Civil 3D. Please see the 25-year storm pipe table as shown in Exhibit F, Storm Sewer
Pipe Table. The proposed A Line has also been analyzed for the 100-year storm event. Hydraulic calculations confirm that all structures and pipes along the A Line convey the design flow within the closed storm drainage system without surcharging.
The existing storm pipe entering the project site from Jones Street conveys runoff from an off-site drainage area of approximately 3.77 acres. Based on discussions with City of Norcross staff, no known flooding or capacity issues have been reported with the existing storm drainage system during rainfall events. Therefore, the existing 18-inch pipe entering the site was assumed to convey a constant flow of 12 cfs for all design storm events. Hydraulic modeling indicates that the existing inline structures along the B Line surcharge and overflow during the 100-year storm event. The proposed design improves the hydraulic capacity of the B Line by increasing the minimum pipe slope from 0.11% to 1.91%, replacing the existing 15-inch pipe with a 24-inch pipe, and reducing the contributing drainage area by diverting approximately 0.07 acre to the A Line.
These improvements significantly increase the conveyance capacity of the B Line.
Analysis of Downstream Conditions
In accordance with City of Norcross requirements an analysis was performed on predicted flows pre- and post-development at a point in the drainage basin where the project’s area is a maximum of 10% of the total basin area. Study Point A drain to the southeast to Beaver Ruin Creek. The
10% downstream study basin is approximately 58.79 acres for Downstream Study Point as shown in Exhibit G. The time of concentration is 20.5 minutes for the basin area with a curve number of
89 for the entire drainage area.
Downstream Study Point Analysis Summary
Return
Frequency
(Years)
Pre-Developed
Flow at
Downstream
Study Point
(CFS)
Post-Developed
Flow at
Downstream
Study Point
Difference
1 80.11 76.75 (3.36)
2 102.27 100.03 (2.24)
5 141.42 141.24 (0.18)
10 177.22 176.50 (0.72)
25 230.10 227.09 (3.01)
50 273.73 268.14 (5.59)
100 319.29 314.72 (4.57)
Page | 7
As shown in the tables on the previous page, there is a decrease for the post-developed flows for the 1- through 100-year storm event for the Downstream Study Point. The project site discharges to the existing MS4 along Mitchell Road through a system of existing storm pipes and roadside ditches. These conveyances ultimately discharge into an existing culvert beneath Buford Highway, which outfalls to Beaver Ruin Creek.
The following photographs of the existing roadside ditch and culvert along Mitchell Road documenting the existing downstream drainage conditions. Refer to Appendix G for the downstream analysis calculations and the 10% Downstream Study hydrograph printout.
Headwall across from the Cotton Gin at the intersection of Lawrenceville St and Mitchell Rd
Page | 8
Existing roadside ditch along Mitchell Rd conveying runoff toward the culvert
The existing culvert before crossing Buford Hwy.
EXHIBITS
COLUMBIA
ENGINEERING
NORTH
LOCATION MAP
65 LAWRENCEVILLE ST
NORCROSS, GEORGIA
GWINNETT COUNTY
SITE
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CIVIL ENGINEERS * LAND PLANNERS LANDSCAPE ARCHITECRTS *SURVEYORS
AutoCAD SHX Text
2862 BUFORD HIGHWAY SUITE 200 DULUTH, GEORGIA 30096 (770) 925-0357
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
PROJECT LOCATION:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
EX A
AutoCAD SHX Text
CITY OF NORCROSS
AutoCAD SHX Text
PARKING IMPROVEMENTS
AutoCAD SHX Text
NORCROSS, GA
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text 6170.05
AutoCAD SHX Text 06/05/26
V
T
V
V
T
V
V
T
V
V
T
V
V
T
V
V
T
V
V
T
V
V
T V
V
T V
V
T V
V
T V
V
T V
V
T V
V
T
VV
T
VV
T
VV
T
VV
T
VV
T
VV
T
V
V
T
S T
S T
S T
ACACACACAC
COCO
AC
G
GM
AC
CO
S T
S T
S T
S T
S T S T
S T
S T
S T
S T
S T
S T
S T
S T
S T
S T S T
S T S T
TC
S T
UP
UP
S T
S T
S T
TC
BOLBOLBOL BOLBOLBOLBOL BOL
BOL
PED
T
PED
G
GM
G
GM
G
GM
G
GM
G
GM
T
T
T
PED
G
GM
S T
UP
SSMH
TOP=±1032.40
8" INV IN/OUT=±1028.14
C
, C
O
LU
M
BI
A
EN
G
IN
EE
R
IN
G
S
ER
VI
C
ES
ENGINEERING
COLUMBIA
DULUTH, GEORGIA 30096
2862 BUFORD HIGHWAY
SUITE 200
(770) 925-0357
ENGINEERING
COLUMBIA
DATEREVISIONS
DRAWING TITLE
DRAWING NO.
FILE NAME:
DRAWN BY:
PROJECT NO.
DATE:
SCALE:CIVIL ENGINEERS * LAND PLANNERS
* LANDSCAPE ARCHITECTS * SURVEYORS
6170.05-Hydro
1"=80'
07/20/26COMMENTS
PA
R
KI
N
G
IM
PR
O
VE
M
EN
TS
N O
R C
R O
SS
, G
A
L
AW
R
EN
C
EV
IL
LE
S
T
D O
W N
TO
W
N N
O R
C R
O
SS
ST
O
R M
E
XH
IB
IT
F O
R
06/05/26
6170.05
KG
EX B
DRAINAGE MAP
PRE-DEVELOPED
SITE DATA
AutoCAD SHX Text
SOIL GROUP: MCF
AutoCAD SHX Text SOIL GROUP: ToA
AutoCAD SHX Text
SOIL GROUP: WHD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text PRE BASIN A1 OFF-SITE AREA=2.21 AC. 2.21 AC. AC. CN=82 Tc=11.54 MIN.
AutoCAD SHX Text PRE BASIN A2 ON-SITE AREA=1.61 AC. 1.61 AC. AC. CN=92 Tc=9.08 MIN.
AutoCAD SHX Text PRE BASIN A1 ON-SITE AREA=2.93 AC. 2.93 AC. AC. CN=77 Tc=13.33 MIN.
AutoCAD SHX Text
AutoCAD SHX Text
%%UBAR SCALE
AutoCAD SHX Text 80'
AutoCAD SHX Text 40'
AutoCAD SHX Text 80'
AutoCAD SHX Text 1" = 80'
AutoCAD SHX Text
PROJECT DISTURBED AREA
AutoCAD SHX Text
%%P2.18 ACRES
AutoCAD SHX Text
TOTAL SITE AREA
AutoCAD SHX Text
%%P6.11 ACRES
AutoCAD SHX Text
PRE-DEVELOPED CONDITIONS DRAINAGE BASINS (DB):
AutoCAD SHX Text
PRE BASIN A1 ON-SITE
AutoCAD SHX Text
2.93 ACRES 77 13.33 MIN
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
PRE BASIN A1 OFF-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
PRE BASIN A2 OFF-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
PRE BASIN A2 ON-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
PRE BASIN A3 OFF-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
PRE BASIN A1 ON-SITE BYPASS
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
1.58 ACRES 96 5.00 MIN
AutoCAD SHX Text
2.21 ACRES 82 11.54 MIN
AutoCAD SHX Text
0.05 ACRES 93 5.00 MIN
AutoCAD SHX Text
1.61 ACRES 92 9.08 MIN
0.14 ACRES 97 5.00 MIN
S T
S T
ACACACACAC
AC
AC
S T
S T
S T
S T
S T S T
S T
S T
S T
S T
S T
S T
S T
S T
S T
S T S T
S T S T
S T
S T
S T
S T
BOLBOLBOL BOLBOLBOLBOL BOL
BOL
S T
LO
D
LODLODLO
D
LO
D
LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D LOD
LO
D
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
DLOD
LO
D
LOD
LO
D
LO
D
LOD
LO
D
SITE DATA
C
, C
O
LU
M
BI
A
EN
G
IN
EE
R
IN
G
S
ER
VI
C
ES
ENGINEERING
COLUMBIA
DULUTH, GEORGIA 30096
2862 BUFORD HIGHWAY
SUITE 200
(770) 925-0357
ENGINEERING
COLUMBIA
DATEREVISIONS
DRAWING TITLE
DRAWING NO.
FILE NAME:
DRAWN BY:
PROJECT NO.
DATE:
SCALE:CIVIL ENGINEERS * LAND PLANNERS
* LANDSCAPE ARCHITECTS * SURVEYORS
6170.05-Hydro
1"=80'
07/20/26COMMENTS
PA
R
KI
N
G
IM
PR
O
VE
M
EN
TS
N O
R C
R O
SS
, G
A
L
AW
R
EN
C
EV
IL
LE
S
T
D O
W N
TO
W
N N
O R
C R
O
SS
ST
O
R M
E
XH
IB
IT
F O
R
06/05/26
6170.05
KG
EX C
DRAINAGE MAP
POST-DEVELOPED
AutoCAD SHX Text
WINGO STREET
AutoCAD SHX Text
JONES STREET
AutoCAD SHX Text
LAWRENCEVILLE STREET
AutoCAD SHX Text
SOIL GROUP: MCF
AutoCAD SHX Text SOIL GROUP: ToA
AutoCAD SHX Text
SOIL GROUP: HYB
AutoCAD SHX Text POST BASIN A1 ON-SITE AREA=2.99 AC. 2.99 AC. AC. CN=86 Tc=5.30 MIN.
AutoCAD SHX Text POST BASIN A1 OFF-SITE AREA=2.21 AC. 2.21 AC. AC. CN=82 Tc=11.54 MIN.
AutoCAD SHX Text POST BASIN A2 ON-SITE AREA=1.54 AC. 1.54 AC. AC. CN=90 Tc=8.50 MIN.
AutoCAD SHX Text
PROJECT DISTURBED AREA
AutoCAD SHX Text
%%P2.18 ACRES
AutoCAD SHX Text
TOTAL SITE AREA
AutoCAD SHX Text
%%P6.11 ACRES
AutoCAD SHX Text
POST-DEVELOPED CONDITIONS DRAINAGE BASINS (DB):
AutoCAD SHX Text
POST BASIN A1 ON-SITE
AutoCAD SHX Text
2.99 ACRES 86 5.30 MIN
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
POST BASIN A1 OFF-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
POST BASIN A2 OFF-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
POST BASIN A2 ON-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
POST BASIN A3 OFF-SITE
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
POST BASIN A1 ON-SITE BYPASS
AutoCAD SHX Text
CN
AutoCAD SHX Text Tc
AutoCAD SHX Text
1.58 ACRES 96 5.00 MIN
AutoCAD SHX Text
2.21 ACRES 82 11.54 MIN
AutoCAD SHX Text
0.05 ACRES 93 5.00 MIN
AutoCAD SHX Text
1.54 ACRES 90 8.50 MIN
AutoCAD SHX Text
0.14 ACRES 97 5.00 MIN
AutoCAD SHX Text
AutoCAD SHX Text
%%UBAR SCALE
AutoCAD SHX Text 80'
AutoCAD SHX Text 40'
AutoCAD SHX Text 80'
1" = 80'
S T
ACACACACAC
AC
AC
S T
S T
S T
S T
S T S T
S T
S T
S T
S T
S T
S T S T
S T
S T
BOLBOLBOL BOLBOLBOLBOL BOL
BOL
S T
C
, C
O
LU
M
BI
A
EN
G
IN
EE
R
IN
G
S
ER
VI
C
ES
ENGINEERING
COLUMBIA
DULUTH, GEORGIA 30096
2862 BUFORD HIGHWAY
SUITE 200
(770) 925-0357
ENGINEERING
COLUMBIA
DATEREVISIONS
DRAWING TITLE
DRAWING NO.
FILE NAME:
DRAWN BY:
PROJECT NO.
DATE:
SCALE:CIVIL ENGINEERS * LAND PLANNERS
* LANDSCAPE ARCHITECTS * SURVEYORS
6170.05-Hydro
1"=80'
07/20/26COMMENTS
PA
R
KI
N
G
IM
PR
O
VE
M
EN
TS
N O
R C
R O
SS
, G
A
L
AW
R
EN
C
EV
IL
LE
S
T
D O
W N
TO
W
N N
O R
C R
O
SS
ST
O
R M
E
XH
IB
IT
F O
R
06/05/26
6170.05
KG
EX D
MAP
BMP
LEGEND
AutoCAD SHX Text
WINGO STREET
AutoCAD SHX Text
JONES STREET
AutoCAD SHX Text
LAWRENCEVILLE STREET
AutoCAD SHX Text
SOIL GROUP: MCF
AutoCAD SHX Text SOIL GROUP: ToA
AutoCAD SHX Text
AutoCAD SHX Text
%%UBAR SCALE
AutoCAD SHX Text 60'
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text 1" = 60'
AutoCAD SHX Text
PPA = PERMEABLE PAVERS SYSTEM
AutoCAD SHX Text
BIO AREA = BIORETENTION AREA
WQ UNIT = CONTECH CDS HYDRODYNAMIC SEPARATOR
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CIVIL ENGINEERS * LAND PLANNERS LANDSCAPE ARCHITECRTS *SURVEYORS
AutoCAD SHX Text
2862 BUFORD HIGHWAY SUITE 200 DULUTH, GEORGIA 30096 (770) 925-0357
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
PROJECT LOCATION:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
EX E1
AutoCAD SHX Text
CITY OF NORCROSS
AutoCAD SHX Text
PARKING IMPROVEMENTS
AutoCAD SHX Text
NORCROSS, GA
AutoCAD SHX Text
DRY POND A OCS DETAIL
AutoCAD SHX Text 6170.05
AutoCAD SHX Text 07/20/26
AutoCAD SHX Text
C-1 DRY POND A OCS DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
MANHOLE LADDER PER CITY REQUIREMENTS ON SPACING AND TYPE
AutoCAD SHX Text
6" THICK CONCRETE TOP
AutoCAD SHX Text
6"X6"X6" PEDESTAL (TYPICAL-4 CORNERS)
AutoCAD SHX Text
18" RCP OUTLET PIPE INV=1012.72
AutoCAD SHX Text
5'X5'X8" BASE TOP ELEV=1012.72
AutoCAD SHX Text
4'X4' CONCRETE OCS
AutoCAD SHX Text
24" MANHOLE ACCESS
AutoCAD SHX Text
3' WEIR OPEN 1-SIDE INV=1016.50
AutoCAD SHX Text
3' WEIR OPEN 2-SIDES INV=1017.75
AutoCAD SHX Text
100-YR PONDING ELEV=1019.39
AutoCAD SHX Text
TOP OF STRUCTURE ELEV=1020.50
AutoCAD SHX Text
TOP OF DAM ELEV=1020.00
AutoCAD SHX Text
1.25" ORIFICE (CHANNEL PROTECTION) INV=1013.22
AutoCAD SHX Text
ED 25-YR PONDING ELEV=1018.44
AutoCAD SHX Text
(SEE ORIFICE END-CAP DETAIL)
AutoCAD SHX Text PERMANENT 24" HALF-ROUND PERFORATED CMP RETROFIT WITH HINGED LID OF EXPANDED METAL WITH "X " OPENING34"X " OPENING12" OPENING
1' WEIR OPEN 1-SIDE INV=1015.00
DRY POND A
DRY POND A CROSS-SECTION
C
, C
O
LU
M
BI
A
EN
G
IN
EE
R
IN
G
S
ER
VI
C
ES
ENGINEERING
COLUMBIA
DULUTH, GEORGIA 30096
2862 BUFORD HIGHWAY
SUITE 200
(770) 925-0357
ENGINEERING
COLUMBIA
DATEREVISIONS
DRAWING TITLE
DRAWING NO.
FILE NAME:
DRAWN BY:
PROJECT NO.
DATE:
SCALE:CIVIL ENGINEERS * LAND PLANNERS
* LANDSCAPE ARCHITECTS * SURVEYORS
6170.05-Hydro
NTS
07/20/26COMMENTS
PA
R
KI
N
G
IM
PR
O
VE
M
EN
TS
N O
R C
R O
SS
, G
A
L
AW
R
EN
C
EV
IL
LE
S
T
D O
W N
TO
W
N N
O R
C R
O
SS
ST
O
R M
E
XH
IB
IT
F O
R
06/05/26
6170.05
KG
EX E2
CROSS-SECTION
DRY POND A
AutoCAD SHX Text
SEE ORIFICE END CAP DETAIL
AutoCAD SHX Text
CONCRETE BASE
AutoCAD SHX Text
SEE DETAIL GDOT D-44 FOR HALF ROUND INFO
AutoCAD SHX Text
BOTTOM ELEV.=1013.22
AutoCAD SHX Text
#57 STONE SHALL COVER ENTIRE FACE OF HALF ROUND CMP
AutoCAD SHX Text
PERMANENT HALF ROUND 24" CMP TO ELEVATION 1015.00
AutoCAD SHX Text
C-1 OCS TOP=1020.50
AutoCAD SHX Text
WALL ELEV.=1020.50
AutoCAD SHX Text NOTE: ATTACH HALF ROUND CMP TO STRUCTURE WHERE CONTACT OCCURS WITH L-BRACKETS 6" OC VERTICAL WELDED TO THE FULL ROUND AND EPOXY-BOLTED INTO THE CONCRETE STRUCTURE
AutoCAD SHX Text
100-YR ELEV.=1019.39
AutoCAD SHX Text
SCALE:NTS
AutoCAD SHX Text
18" RCP INV=1012.72
AutoCAD SHX Text
0.61' FREEBOARD
AutoCAD SHX Text
EXISTING PIPE
AutoCAD SHX Text
CHANNEL PROTECTION THREADED END CAP WITH 1.25" ORIFICEINV=1013.22
AutoCAD SHX Text
BOTTOM OF POND ELEV.=1013.22
AutoCAD SHX Text
CP ELEV.=1015.00
AutoCAD SHX Text
C-1 OCS TOP=1020.50
AutoCAD SHX Text
100-YR ELEV.=1019.39
AutoCAD SHX Text
WALL ELEV.=1020.50
AutoCAD SHX Text
25-YR ELEV.=1018.44
AutoCAD SHX Text
TOP OF DAM ELEV=1020.00
0.61' FREEBOARD
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
CIVIL ENGINEERS * LAND PLANNERS LANDSCAPE ARCHITECRTS *SURVEYORS
AutoCAD SHX Text
2862 BUFORD HIGHWAY SUITE 200 DULUTH, GEORGIA 30096 (770) 925-0357
AutoCAD SHX Text
PROJECT NO.:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CLIENT:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
PROJECT LOCATION:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
EX E3
AutoCAD SHX Text
CITY OF NORCROSS
AutoCAD SHX Text
PARKING IMPROVEMENTS
AutoCAD SHX Text
NORCROSS, GA
AutoCAD SHX Text
ORIFICE END-CAP DETAIL
AutoCAD SHX Text 6170.05
AutoCAD SHX Text 07/20/26
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text #4's @ 3" O.C. MAX WELDED
AutoCAD SHX Text 1.5"
AutoCAD SHX Text 1.5"
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TRASH RACK DETAIL
AutoCAD SHX Text
ANCHOR BOLT DRILLED AND GROUTED IN PLACE (SEE NOTE 1)
AutoCAD SHX Text 6"
AutoCAD SHX Text
1. " ANCHORED BOLTS (EMBEDDED 3") 34" ANCHORED BOLTS (EMBEDDED 3") 2. TRASH RACK ARE SCHEMATIC. CONTRACTOR SHALL VERIFY ALL TRASH RACK ARE SCHEMATIC. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF THE WEIR OPENING PRIOR TO FABRICATION. SUBMIT SHOP DRAWINGS FOR REVIEW BY THE ENGINEER PRIOR TO FABRICATION
AutoCAD SHX Text 1.5"
AutoCAD SHX Text
ANCHOR BOLT DRILLED AND GROUTED IN PLACE (SEE NOTE 1)
12"
C
, C
O
LU
M
BI
A
EN
G
IN
EE
R
IN
G
S
ER
VI
C
ES
ENGINEERING
COLUMBIA
DULUTH, GEORGIA 30096
2862 BUFORD HIGHWAY
SUITE 200
(770) 925-0357
ENGINEERING
COLUMBIA
DATEREVISIONS
DRAWING TITLE
DRAWING NO.
FILE NAME:
DRAWN BY:
PROJECT NO.
DATE:
SCALE:CIVIL ENGINEERS * LAND PLANNERS
* LANDSCAPE ARCHITECTS * SURVEYORS
6170.05-Hydro
NTS
07/20/26COMMENTS
PA
R
KI
N
G
IM
PR
O
VE
M
EN
TS
N O
R C
R O
SS
, G
A
L
AW
R
EN
C
EV
IL
LE
S
T
D O
W N
TO
W
N N
O R
C R
O
SS
ST
O
R M
E
XH
IB
IT
F O
R
06/05/26
6170.05
KG
EX F
TABLE
STORM PIPE
T
V
V
T
V
V
T V
V
T V
V
T
VV
T
S T
S T
S T
ACACACACAC
AC
AC
S T
S T S T
S TS T
S T
S T S T
S T S T
S T S T
S T
S T
S T
S T S T
S TS T
S TS T
WV
TCWV
WV
WV
FHW
WM
S T
UP
WV
UP
W
WM
ICVICV
W
WM
FH
ICV
ICV
S T
S T
S T
S T
W
WM
W
WM WW
FH
WV
TC
BOLBOLBOL BOLBOLBOLBOL BOL
BOL
PED
W
WM W
WM
W
WM
W
WMWV
W
WM
W
WM W
WM
W
WM
W
WM
W
WM
W
WM
FH
WV
T
PED
WV
WVFH
WV W
WM
WV
WV
FH
WV
W
WM
WV
W
WM
T
T
T
PED
W
WM
W
WMICVICV
ICV
STMH
TOP=1039.64
INV OUT=1036.63
15" R C
P
STMH
TOP=1039.38
INV IN=1036.56
INV OUT=1035.88
BOTTOM BOX=1035.97
18" RCP
STMH
TOP=1034.15
INV IN=1031.03 (A)
INV IN=1031.02 (B)
INV OUT=1030.71 (C)
18" RCP
24" RCP
(A)
(B)
(C)
STMH
TOP=1034.73
INV IN=1031.22
INV OUT=1031.08
18" RCP
STMH
TOP=1035.59
INV IN=1031.62
INV OUT=1031.56
BOTTOM BOX=1031.69
15" RCP
(A)
(B) (C)
DI
TOP=1035.15
INV IN=1032.31 (A)
INV IN=1032.25 (B)
INV OUT=1032.21 (C)
15" RCP
8" D
IP
(A)
(B) (C)
DI
TOP=1035.84
INV IN=1033.30 (A)
INV IN=1033.09 (B)
INV OUT=1032.99 (C)
DI
TOP=1035.73
INV OUT=1034.10
18"R C
P
24" CMP
STMH
TOP=1038.81
INV IN=1035.15
INV OUT=1034.93
DI
TOP=1044.95
INV IN=1041.58 (A)
INV IN=1040.79 (B)
INV OUT=1040.24 (C)
18" RCP
18" RCP
(A) (B)
(C)
18" R C
PSTMH
TOP=1046.64
INV IN=1043.10
INV OUT=1042.90
BOTTOM BOX=1043.03
STMH
TOP=1049.72
INV IN=1046.10
INV OUT=1045.97
BOTTOM BOX=1046.33
STMH
TOP=1046.99
INV IN=1043.79
INV OUT=1042.22
DI
TOP=1045.69
INV IN=1042.26
INV IN=1041.43
BOTTOM BOX=1042.04
18" RCP
24" RCP
STMH
TOP=1032.40
INV IN=1029.40
INV OUT=1029.00
15" R C
P
15" RCP 24" RCP
15" RCP
24" RCP
STMH
TOP=1030.80
INV OUT=1027.99
STMH
TOP=1031.18
INV IN=1028.03 (A)
INV IN=1027.86 (B)
INV IN=1027.60 (C)
INV OUT=1027.44 (D)
BOTTOM BOX=1027.50
(A)
(B)
(C) S T
(D)
STMH
TOP=1026.11
INV OUT=1023.47 STMH
TOP=1026.33
INV IN=1023.37 (A)
INV IN=1023.22 (B)
INV OUT=1023.11 (C)
BOTTOM BOX=1023.11
(A) (B)
(C)
30" RCP
STMH
TOP=1019.40
INV OUT=1016.90
15" RCP 30" RCP
STMH
TOP=1019.75
INV IN=1016.61 (A)
INV IN=1015.89 (B)
INV OUT=1015.38 (C)
(A)
(B)
(C)
30" RCP
DI
TOP=1015.51
INV IN=1010.90
INV OUT=1009.64
(A)
(B)
(C)
(D)
18" PVC
CURB INLET
TOP=1014.27
INV IN=1008.95 (A)
INV IN=1008.10 (B)
INV IN=1005.96 (C)
INV OUT=1005.72 (D)
18" PVC
18" PVC
DI
TOP=1013.85
INV IN=1009.31
INV OUT=1009.17
STMH
TOP=1014.62
INV IN=1011.35
INV OUT=1011.29
DI
TOP=1014.41
INV IN=1010.68
INV OUT=1010.61
18" RCP
15" RCP
STMH
TOP=1013.55
INV IN=1011.01
INV OUT=1008.64
STMH
TOP=1012.33
INV IN=1008.84
INV IN=1004.13
INV OUT=1003.98
DI
TOP=1026.93
INV OUT=1023.03
12" R C
P
18" RCP
STMH
TOP=1024.46
INV IN=1021.56
INV IN=1021.45
INV OUT=1021.43
BOTTOM BOX=1021.49
(A)
(C)
STMH
TOP=1023.95
INV IN=1019.62 (A)
INV IN=1019.55 (B)
INV OUT=1019.43 (C)
DI
TOP=1023.33
INV IN=1019.77
INV OUT=1019.70
18" RCP
15" R C
P
DI
TOP=1023.84
INV IN=1020.88
INV OUT=1020.44
DI
TOP=1023.86
INV IN=1021.51
INV OUT=1021.46
HEADWALL
INV=1011.94
STMHTOP=1025.02
TOP=1025.02
INV IN=1021.88 (A)
INV IN=1021.16 (B)
INV OUT=1020.89 (C)
D O
U
BLE
24" R C
P (E)
STMH
TOP=1030.26
INV OUT=1028.26
SITE DATA
C
, C
O
LU
M
BI
A
EN
G
IN
EE
R
IN
G
S
ER
VI
C
ES
ENGINEERING
COLUMBIA
DULUTH, GEORGIA 30096
2862 BUFORD HIGHWAY
SUITE 200
(770) 925-0357
ENGINEERING
COLUMBIA
DATEREVISIONS
DRAWING TITLE
DRAWING NO.
FILE NAME:
DRAWN BY:
PROJECT NO.
DATE:
SCALE:CIVIL ENGINEERS * LAND PLANNERS
* LANDSCAPE ARCHITECTS * SURVEYORS
6170.05-Hydro
1"=200'
PA
R
KI
N
G
IM
PR
O
VE
M
EN
TS
N O
R C
R O
SS
, G
A
L
AW
R
EN
C
EV
IL
LE
S
T
D O
W N
TO
W
N N
O R
C R
O
SS
ST
O
R M
E
XH
IB
IT
F O
R
06/05/26
6170.05
KG
EX G
DRAINAGE MAP
DOWNSTREAM
AutoCAD SHX Text
FIRE DEPARTMENT CONNECTION
AutoCAD SHX Text
EXISTING CITY HALL BUILDING
AutoCAD SHX Text
EXISTING FIRE HYDRANT
AutoCAD SHX Text
EXISTING FIRE HYDRANT
AutoCAD SHX Text
EXISTING FIRE HYDRANT
AutoCAD SHX Text
EXISTING FIRE HYDRANT
AutoCAD SHX Text
SOIL GROUP: MCF
AutoCAD SHX Text SOIL GROUP: ToA
AutoCAD SHX Text
SOIL GROUP: WHD
AutoCAD SHX Text
SOIL GROUP: MCF
AutoCAD SHX Text
SOIL GROUP: WHD
AutoCAD SHX Text SOIL GROUP: Ub
AutoCAD SHX Text
SOIL GROUP: WHD
AutoCAD SHX Text
SOIL GROUP: HYB
AutoCAD SHX Text SOIL GROUP: Cfs
AutoCAD SHX Text SOIL GROUP: PgC2
AutoCAD SHX Text SOIL GROUP: PgC2
AutoCAD SHX Text
SOIL GROUP: ARE
AutoCAD SHX Text SOIL GROUP: WkB
AutoCAD SHX Text SOIL GROUP: PgD2
AutoCAD SHX Text SOIL GROUP: Ub
AutoCAD SHX Text SOIL GROUP: PfC2
AutoCAD SHX Text
EXISTING FIRE HYDRANT
AutoCAD SHX Text DOWNSTREAM DRAINAGE BASIN 58.79 AC. CN=74 Tc=20.50 MIN.
AutoCAD SHX Text
ON-SITE DRAINAGE BASIN 6.11 AC
AutoCAD SHX Text
10%%% TOTAL DOWNSTREAM BASIN
AutoCAD SHX Text
%%P64.90 ACRES
AutoCAD SHX Text
TOTAL SITE AREA
AutoCAD SHX Text
%%P6.11 ACRES
AutoCAD SHX Text
AutoCAD SHX Text
%%UBAR SCALE
AutoCAD SHX Text 200'
AutoCAD SHX Text 100'
AutoCAD SHX Text 200'
1" = 200'
APPENDIX A
Project Name: Downtown Norcross Parking Improvements
Project Number: 6170.05
Project Street Address or nearest Intersection: 65 Lawreceville St
City: Norcross
County: Gwinnett
State: Georgia
Zip Code: 30071
Permitting Jurisdiction: City of Norcross
Max Pre-Developed Curve Number Required: 55
LL:
6254 -196, -241, -195, -248, -193, -192, -242, -198, 6254A005, 6254A004B
District: 9
Acreage: 6.11
Tax Parcel(s):
R6254 -196, -241, -195, -248, -193, -192, -242, -198, R6254A005, R6254A004B
Current Land Use: Commercial parking lot use
Proposed Land Use: Commercial parking lot use
Flood Zone X
Firm Panel: 13135C0082G
SCS 24-HR Rainfall (in.)
1-yr 3.28
2-yr 3.70
5-yr 4.40
10-yr 5.01
25-yr 5.88
50-yr 6.58
100-yr 7.30
* Acreage includes sliver of Skin Alley
SITE DATA INFORMATION
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
Site Data Information - 1/26
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 1.59 1 D 98
Open Space: Good Condition (grass cover <75%) 0.56 0 D 80
Open Space: Good Condition (grass cover <75%) 0.21 0 A 39
Wood or forest land: good cover 0.03 0 D 77
Wood or forest land: good cover 0.54 0 A 30
Total Acreage (ac): 2.93
Impervious (ac): 1.59
Weighted CN: 77
Jurisdiction Maximum CN: 55
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 1.43 1 D 98
Open Space: Good Condition (grass cover <75%) 0.15 0 D 80
Total Acreage (ac): 1.58
Impervious (ac): 1.43
Weighted CN: 96
Jurisdiction Maximum CN: 55
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 0.79 1 D 98
Open Space: Good Condition (grass cover <75%) 0.71 0 D 80
Open Space: Good Condition (grass cover <75%) 0.02 0 A 39
Wood or forest land: good cover 0.23 0 D 77
Wood or forest land: good cover 0.21 0 A 30
Street and roads: Gravel (including ROW) 0.25 1 D 91
Total Acreage (ac): 2.21
Impervious (ac): 0.94
Weighted CN: 82
Jurisdiction Maximum CN: N/A
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
PRE-DEVELOPED CURVE NUMBER CALCULATIONS
PRE-DEVELOPED ON-SITE DRAINAGE BASIN A1
Area
(acres)
PRE-DEVELOPED ON-SITE DRAINAGE BASIN A1 BYPASS
Area
(acres)
PRE-DEVELOPED OFF-SITE DRAINAGE BASIN A1
Area
(acres)
Pre-Developed CN Calculations - 2/26
Soil Group
Curve
Number
Impervious areas 1.11 1 D 98
Open Space: Good Condition (grass cover <75%) 0.50 0 D 80
Total Acreage (ac): 1.61
Impervious (ac): 1.11
Weighted CN: 92
Jurisdiction Maximum CN: 55
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 0.04 1 D 98
Open Space: Good Condition (grass cover <75%) 0.02 0 D 80
Total Acreage (ac): 0.05
Impervious (ac): 0.04
Weighted CN: 93
Jurisdiction Maximum CN: N/A
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 0.13 1 D 98
Open Space: Good Condition (grass cover <75%) 0.01 0 D 80
Total Acreage (ac): 0.14
Impervious (ac): 0.13
Weighted CN: 97
Jurisdiction Maximum CN: N/A
Area
(acres)
PRE-DEVELOPED OFF-SITE DRAINAGE BASIN A3
Area
(acres)
PRE-DEVELOPED OFF-SITE DRAINAGE BASIN A2
Area
(acres)
PRE-DEVELOPED ON-SITE DRAINAGE BASIN A2
Pre-Developed CN Calculations - 3/26
Soil Group
Curve
Number
Impervious areas 1.99 1 D 98
Open Space: Good Condition (grass cover <75%) 0.52 0 D 80
Open Space: Good Condition (grass cover <75%) 0.34 0 A 39
Wood or forest land: good cover 0.03 0 D 77
Wood or forest land: good cover 0.02 0 A 30
Pave Drain 0.01 0 D 61
Pave Drain 0.07 0 A 61
A1 Total Acreage (ac): 2.99
A1 Impervious (ac): 1.99
A1 Weighted CN: 86
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 1.43 1 D 98
Open Space: Good Condition (grass cover <75%) 0.15 0 D 80
A1 BYPASS Total Acreage (ac): 1.58
A1 BYPASS Impervious (ac): 1.43
A1 BYPASS Weighted CN: 96
*Hydrologic Soil Group are assumed to be D for this basin
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 0.79 1 D 98
Open Space: Good Condition (grass cover <75%) 0.71 0 D 80
Open Space: Good Condition (grass cover <75%) 0.02 0 A 39
Wood or forest land: good cover 0.23 0 D 77
Wood or forest land: good cover 0.21 0 A 30
Street and roads: Gravel (including ROW) 0.25 1 D 91
N/A Total Acreage (ac): 2.21
N/A Impervious (ac): 0.94
N/A Weighted CN: 82
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
Area
(acres)
POST-DEVELOPED ON-SITE DRAINAGE BASIN A1
POST-DEVELOPED CURVE NUMBER CALCULATIONS
Area
(acres)
POST-DEVELOPED OFF-SITE DRAINAGE BASIN A1
POST-DEVELOPED ON-SITE DRAINAGE BASIN A1 BYPASS
Area
Post-Developed CN Calculations - 4/26
Soil Group
Curve
Number
Impervious areas 0.04 1 D 98
Open Space: Good Condition (grass cover <75%) 0.02 0 D 80
N/A Total Acreage (ac): 0.05
N/A Impervious (ac): 0.04
N/A Weighted CN: 93
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 1.01 1 D 98
Open Space: Good Condition (grass cover <75%) 0.42 0 D 80
Pave Drain 0.11 0 D 61
A2 Total Acreage (ac): 1.54
A2 Impervious (ac): 1.01
A2 Weighted CN: 90
Land Cover Type and Condition Hydrologic
Soil Group
Curve
Number
Impervious areas 0.13 1 D 98
Open Space: Good Condition (grass cover <75%) 0.01 0 D 80
N/A Total Acreage (ac): 0.14
N/A Impervious (ac): 0.13
N/A Weighted CN: 97
POST-DEVELOPED OFF-SITE DRAINAGE BASIN A2
Area
(acres)
POST-DEVELOPED ON-SITE DRAINAGE BASIN A2
Area
(acres)
POST-DEVELOPED OFF-SITE DRAINAGE BASIN A3
Area
Post-Developed CN Calculations - 5/26
SHEET FLOW
Surface description (Table 3.1.5-2) Woods: dense underbrush
Woods: dense underbrush
Grass: bermuda grasses Grass: dense grasses Grass: bermuda grasses
Manning's roughness coefficient, n 0.800 0.800 0.410 0.240 0.410
Flow fall, H (ft) 3.70 6.00 3.50 4.50 4.00
Flow length, L (ft) 50 50 50 50 50
Two-yr 24-hr rainfall, P2 (in) 3.70 3.70 3.70 3.70 3.70
Land slope, S = H/L (ft/ft) 0.074 0.120 0.070 0.090 0.080
(3.1.8) (min) 11.83 9.75 7.09 4.18 6.72
SHALLOW CONCENTRATED FLOW
Surface description Unpaved Paved Unpaved Unpaved Unpaved
Flow fall, H (ft) 11.40 4.00 4.50 0.50 3.20
Flow length, L (ft) 157.66 57.82 134.26 7.51 119.83
Watercourse slope, S = H/L (ft/ft) 0.072 0.069 0.034 0.067 0.027
Average velocity, V (3.1.9 & 3.1.10) (fps) 4.34 5.35 2.95 4.16 2.64
(3.1.7) (min) 0.61 0.18 0.76 0.03 0.76
SHALLOW CONCENTRATED FLOW
Surface description Paved Unpaved Paved Unpaved Paved
Flow fall, H (ft) 1.40 18.50 5.24 3.20 7.54
Flow length, L (ft) 16.6 249.81 225.19 24.48 224.55
Watercourse slope, S = H/L (ft/ft) 0.084 0.074 0.023 0.131 0.034
Average velocity, V (3.1.9 & 3.1.10) (fps) 5.90 4.39 3.10 5.83 3.73
(3.1.7) (min) 0.05 0.95 1.21 0.07 1.00
SHALLOW CONCENTRATED FLOW
Surface description Paved Paved Paved
Flow fall, H (ft) 1.40 3.14 5.20
Flow length, L (ft) 16.6 37.5 91.9
Watercourse slope, S = H/L (ft/ft) 0.084 0.084 0.057
Average velocity, V (3.1.9 & 3.1.10) (fps) 5.90 5.88 4.84
(3.1.7) (min) 0.05 0.11 0.32
PIPE FLOW *Avg. Pipe Diameter Used
Pipe Diameter (in) 21.75 22.7 15 18 15
Cross sectional flow area, A (ft ) 2.58 2.81 1.23 1.77 1.23
Wetted perimeter, Pw (ft) 5.69 5.94 3.93 4.71 3.93
Hydraulic radius, R = A/Pw (ft) 0.45 0.47 0.31 0.38 0.31
Flow fall, H (ft) 15.8 15.5 0.23 23.04 0.23
Flow length, L (ft) 547 437.73 10.67 527.52 10.67
Channel slope, S = H/L (ft/ft) 0.029 0.035 0.022 0.044 0.022
Pipe Material Concrete Concrete Concrete Concrete Concrete
Manning's roughness coefficient, n 0.013 0.013 0.013 0.013 0.013
(3.1.11) (fps) 11.49 13.09 7.75 12.46 7.75
(3.1.7) (min) 0.79 0.56 0.02 0.71 0.02
Total Time of Concentration, Tc (min) 13.33 11.54 9.08 5.30 8.50
TIME OF CONCENTRATION CALCULATIONS
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
DRAINAGE BASIN: Pre Basin A1 on-Site Pre/Post Basin A1 Off-
Site
DRAINAGE BASIN: Pre Basin A1 on-Site Pre/Post Basin A1 Off-
Site
Post Basin A1 on-Site Post Basin A2 On-Site
Post Basin A1 on-Site Post Basin A2 On-SitePre Basin A2 On-Site
Pre Basin A2 On-Site
T� =
0.42 nL
P
.�S
T� = L
60 V
V =
1.49 R
�⁄ S � n
T� = L
60 V
T� = L
60 V
T� = L
60 V
Time of Concentration Calculations - 6/26
Stormwater Pond A
Drainage Basin = A1
Drainage Basin Area = 2.99 Ac. 130,244.40 sf
Drainage Basin CN = 86
Tc = 12.00 minutes
Impervious Area = 1.99 Ac. 66.7 % Impervious
Pervious Area = 1.00 Ac.
Bottom Elevation = 1013.22 Ft
Top Elevation = 1020.00 Ft
Contour Spacing = 1 Ft
Stage Elevation Area Incremental Total
(ft) (ft) (SF) Vol. (CF) Vol. (CF)
0.00 1013.22 0 0 0
0.78 1014.00 4,185 1632 1632
1.78 1015.00 4,430 4308 5940
2.78 1016.00 4,671 4551 10490
3.78 1017.00 4,910 4791 15281
4.78 1018.00 5,146 5028 20309
5.78 1019.00 5,379 5263 25571
6.78 1020.00 5,609 5494 31065
POND A
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
POND STAGE STORAGE CALCULATIONS
Ponds Stage Storage Calculations - 7/26
Channel Protection Volume for Stormwater Pond A
Direct Runoff for 1-Year 24 Hour Storm
(P - 0.2S)
Modified Rainfall Runoff Equation 3.1.5
P + 0.8S with no Runoff Reduction
P = 3.28 inches
1000 - 10 CN = 86
CN
S = 1.58
Qd = 1.93 inches
Ia = 0.32 Ia = (200/CN)-2
Ia/P = 0.10
Tc(hrs) = 0.20 or 12.00 min
850.00 qo/qi= 0.020
Vs/Vr = 0.654
Volume to Detain for 24-hours (Eq 3.3.10)
CPV1yr = 4,871 CF
Area= 46,196 sf = 1.06 AC
1014.75 FT
Elevation value was interpolated from stage storage chart
24-hour Release Calculations
Orifice Equation (3.4.1, 3.4.3.3, and Average Release Rate Equation) t = time to drain pond
CPV1yr = 4871 CF
Ao = Area of the orifice = πr
1.33 inches
Ao = 0.0096 SF
H = top volume elev. - elevation at center of orifice
H = 1014.75 -1013.28
H = 1.48 ft t = 24.00 hours
1.25 inches
Orifice Invert El. = 1013.22 ft Top of WQv Elevation
STREAM CHANNEL PROTECTION CALCULATIONS
qu (cfs/mi /in) =
Qd =
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
Orifice Diameter= Round down
Storage Elevation CPV1Yr= t = WQv
0.6Ao(2gH) 0.5
(3600)
Calculated Orifice Diam. =
(Vs/Vr)(Qd)(A ft
S = from figure 3.1.5-6 from figure 3.3.5-1 for 24 hours
CPV = Vs =
CP Calculations - 8/26
Runoff Reduction Volume for Bioretention Area A
Direct Runoff for Runoff Reduction Area (Eq 3.1.19 and 3.1.20)
Total Area to BMP = 0.10 acres
Total Impervious Area = 0.09 acres
I (%) 90.0
Rv = 0.05 + I(0.009)
I = 90.0 % impervious
Rv = 0.86
RRR = 1.0"(Rv)
RRR = 0.86 inches
Runoff Reduction Volume (RRV)
0.10 ac or 4,356 sf
312 CF
Sizing the Bioretention Volume
VP = PV + VES*(N)
Solve for PV
408 SF x-section area of island
0.5 ft ponding depth
PV = 204 CF ponding volume
Solve for VES
2.5 ft soil/gravel media depth
VES= 1,020 CF volume of engineeered soils
Solve for VP
PV = 204 CF Ponding Vol
VES = 1,020 CF Vol Eng. Soils/gravel
N = 0.4 soil/gravel porosity
Provided RRv: VP = 612 CF Total Volume
RR % Credit = 100%
Adj. Provided RRv: VP = 612 CF must be greater than: 312 CF
RRV Min =
12 in./ft
RR POND Treated Area (ac)=
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
BIORETENTION AREA RUNOFF REDUCTION CALCULATIONS
RRv = RRR x (Drainage Area Acres x 43,560 sf/ac)
RR Bioretention Area Calculations - 9/26
Drawdown Time for Bioretention Area A tf =
Filter Bed Depth (df) = 2.5 ft
Ponding Above Bed (hf) = 0.5 ft
Infiltration Rate (k) = 0.48 in/hr
0.96 ft/day
Required Af = 408 SF
Time to Drain Bioretention (t f) = 16 hours
RRv df k (hf + df) Af
RR Bioretention Area Calculations - 10/26
Runoff Reduction Volume for Bioretention Area B
Direct Runoff for Runoff Reduction Area (Eq 3.1.19 and 3.1.20)
Total Area to BMP = 0.07 acres
Total Impervious Area = 0.06 acres
I (%) 90.0
Rv = 0.05 + I(0.009)
I = 90.0 % impervious
Rv = 0.86
RRR = 1.0"(Rv)
RRR = 0.86 inches
Runoff Reduction Volume (RRV)
0.07 ac or 3,049 sf
219 CF
Sizing the Bioretention Volume
VP = PV + VES*(N)
Solve for PV
377 SF x-section area of island
0.5 ft ponding depth
PV = 189 CF ponding volume
Solve for VES
2.5 ft soil/gravel media depth
VES= 943 CF volume of engineeered soils
Solve for VP
PV = 189 CF Ponding Vol
VES = 943 CF Vol Eng. Soils/gravel
N = 0.4 soil/gravel porosity
Provided RRv: VP = 566 CF Total Volume
RR % Credit = 100%
Adj. Provided RRv: VP = 566 CF must be greater than: 219 CF
RRV Min =
RRv = RRR x (Drainage Area Acres x 43,560 sf/ac)
12 in./ft
RR POND Treated Area (ac)=
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
BIORETENTION AREA RUNOFF REDUCTION CALCULATIONS
RR Bioretention Area Calculations - 11/26
Drawdown Time for Bioretention Area B
Filter Bed Depth (df) = 2.5 ft
Ponding Above Bed (hf) = 0.5 ft
Infiltration Rate (k) = 0.48 in/hr
0.96 ft/day
Required Af = 377 SF
Time to Drain Bioretention (t f) = 12 hours
RRv df
RR Bioretention Area Calculations - 12/26
Runoff Reduction Target Volume for Permeable Pavers
Drainage Basin BMP Name =
Contributing Drainage Basin Area = 0.72 Ac.
Impervious Area = 0.62 Ac.
Runoff Reduction Target Volume
RRv = (P) (Rv) (A) / 12
P = 1.0 inches Target runoff reduction rainfall
Rv = 0.05 + 0.009 (I) Volumetric runoff coefficient
I = 86 % impervious
Rv = 0.825
A = 31,363 SF Area draining to the practice
12 = Unit conversion factor (in/ft)
RRv = 2,156 CF
VPMIN ≥ RRv (target) / RR%
RRV (target) = 2,156 CF
RR% = 100 Runoff Reduction percentage using Table 4.1.3-2
VPMIN = 2,156 CF
Storage Volume Provided
Actual Storage Volume Provided
VP = PV + VES (N)
PV = 0 CF Ponding Volume
VES = AP * d Volume of Engineered Soils
AP = 3,290 SF Area of Permeable Paver System d = 1.00 Ft Depth of gravel
VES = 3289.65 CF
N = 0.40
VP = 1,316 CF
Determine if Minimum Storage Volume was Met
VP ≥ VPMIN
1,316 ≥ 2,156
Runoff Reduction requirements are not met
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
PERMEABLE PAVERS RUNOFF REDUCTION CALCULATIONS
PPA1
RR Permeable Pavers Calculations - 13/26
Drawdown Time for Permeable Pavers PPA1
Filter Bed Depth (df) = 1.00 ft
Ponding Above Pavers (hf) = 0.00 ft
Infiltration Rate (k) = 0.48 in/hr
0.96 ft/day
Required Af = 3,290 SF
Time to Drain Bioretention (t f) = 16 hours
RRv df
RR Permeable Pavers Calculations - 14/26
Contributing Drainage Basin Area = 0.03 Ac.
Impervious Area = 0.02 Ac.
Runoff Reduction Target Volume
RRv = (P) (Rv) (A) / 12
P = 1.0 inches Target runoff reduction rainfall
Rv = 0.05 + 0.009 (I) Volumetric runoff coefficient
I = 67 % impervious
Rv = 0.65
A = 1,307 SF Area draining to the practice
12 = Unit conversion factor (in/ft)
RRv = 71 CF
VPMIN ≥ RRv (target) / RR%
RRV (target) = 71 CF
RR% = 100 Runoff Reduction percentage using Table 4.1.3-2
VPMIN = 71 CF
Storage Volume Provided
Actual Storage Volume Provided
VP = PV + VES (N)
PV = 0 CF Ponding Volume
VES = AP * d Volume of Engineered Soils
AP = 1,325 SF Area of Permeable Paver System d = 1.00 Ft Depth of gravel
VES = 1325.46 CF
N = 0.40
VP = 530 CF
Determine if Minimum Storage Volume was Met
VP ≥ VPMIN
530 ≥ 71
Runoff Reduction requirements are met
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
PERMEABLE PAVERS RUNOFF REDUCTION CALCULATIONS
PPA2
RR Permeable Pavers Calculations - 15/26
Drawdown Time for Permeable Pavers PPA2
Filter Bed Depth (df) = 1.00 ft
Ponding Above Pavers (hf) = 0.00 ft
Infiltration Rate (k) = 0.48 in/hr
0.96 ft/day
Required Af = 1,325 SF
Time to Drain Bioretention (t f) = 1 hours
RRv df
RR Permeable Pavers Calculations - 16/26
Contributing Drainage Basin Area = 0.01 Ac.
Impervious Area = 0.010 Ac.
Runoff Reduction Target Volume
RRv = (P) (Rv) (A) / 12
P = 1.0 inches Target runoff reduction rainfall
Rv = 0.05 + 0.009 (I) Volumetric runoff coefficient
I = 100 % impervious
Rv = 0.95
A = 436 SF Area draining to the practice
12 = Unit conversion factor (in/ft)
RRv = 34 CF
VPMIN ≥ RRv (target) / RR%
RRV (target) = 34 CF
RR% = 100 Runoff Reduction percentage using Table 4.1.3-2
VPMIN = 34 CF
Storage Volume Provided
Actual Storage Volume Provided
VP = PV + VES (N)
PV = 0 CF Ponding Volume
VES = AP * d Volume of Engineered Soils
AP = 406 SF Area of Permeable Paver System d = 1 Ft Depth of gravel
VES = 405.9657 CF
N = 0.40
VP = 162 CF
Determine if Minimum Storage Volume was Met
VP ≥ VPMIN
162 ≥ 34
Runoff Reduction requirements are met
DOWNTOWN NORCROSS PARKING IMPROVEMENTS
PERMEABLE PAVERS RUNOFF REDUCTION CALCULATIONS
PPA3
RR Permeable Pavers Calculations - 17/26
Drawdown Time for Permeable Pavers PPA3
Filter Bed Depth (df) = 1.00 ft
Ponding Above Pavers (hf) = 0.00 ft
Infiltration Rate (k) = 0.48 in/hr
0.96 ft/day
Required Af = 406 SF
Time to Drain Bioretention (t f) = 2 hours
RRv df
RR Permeable Pavers Calculations - 18/26
Contributing Drainage Basin Area = 0.03 Ac.
Impervious Area = 0.02 Ac.
Runoff Reduction Target Volume
RRv = (P) (Rv) (A) / 12
P = 1.0 inches Target runoff reduction rainfall
Rv = 0.05 + 0.
This is the start of the file's text. The full file is on GovTribe.