Bid_Bond_Milliken9017FR20.pdf

PDF 326 KB Posted

Attached to
Milliken Raw Water Pipeline Hardening HMGP
Solicitation number
2025-IFB - PC-064
Issued by
Napa County, California

About this file

The document is a Bid Bond form from the City of Napa Public Works Department for the Milliken Raw Water Pipeline Hardening HMGP project, with the project number 9017FR20. This bid bond is a standard contract document that requires the bidder to submit an executed contract, payment bond, performance bond, and insurance certificates within ten days of receiving a Notice of Award. The bond is set at ten percent of the maximum bid amount and remains valid for 60 days following the bid opening, unless extended by mutual agreement.

The bid bond outlines the financial and legal obligations of the bidder and surety, guaranteeing that if the bidder is awarded the contract, they will enter into the agreement and provide the required documentation. If the bidder fails to execute the contract or submit the necessary bonds and insurance certificates, the surety guarantees that the bidder will forfeit the bond sum to the City of Napa. The document includes signature lines for both the surety and the bidder, with a requirement to attach a notary acknowledgment and power of attorney.

View the file

Other files

File Type Posted
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#15_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#14_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#8_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#6_Revision).pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP_(Addendum_#3_Revision).pdf PDF
Subcontractor_List.pdf PDF
Noncollusion_Declaration.pdf PDF
Bid_Form_Milliken9017FR20.pdf PDF
Bid_Bond_Milliken9017FR20.pdf PDF
Milliken_Raw_Water_Pipeline_Hardening_HMGP.pdf PDF
Plans_2025-09-24.pdf PDF
Milliken_Pipeline_PreBid_CityofNapa_WaiverAndReleaseOfLiability.pdf PDF
Technical_Specifications.pdf PDF
2_CFR_Part_200_(in_effect_on_10-01-2017).pdf PDF
17MITRIP-17002_City_of_Napa_MSA_Exhibit_D.pdf PDF
MilPipeFEMAESA3.pdf PDF
MilPipeFEMAESA2.pdf PDF
Warranty_Bond_(1).pdf PDF
Contract_Template_(2024-2-13).docx DOCX document
MilPipeFEMAESA4.pdf PDF
Forms_0-8_Exhibit_13A-I_&_Supplemental_Forms_A-D_Section_3_Plan_Packet.pdf PDF
DavisBacon_CA20250007_downloaded20250228.pdf PDF
Payment_Bond.pdf PDF
MilPipeFEMAESA5.xlsx XLSX spreadsheet
Performance_Bond.pdf PDF
FEMA_Public_Assistance_Contracting.pdf PDF
MilPipeFEMAESA1.pdf PDF
DR4344-284_Napa_Milliken_Geotechnical_Eval_Miller_Pacific_3426.001rpt_2023-05-31.pdf PDF
Milliken_Pipeline_Available_Laydown_Space_20250821.pdf PDF
Bidder's_Questionnaire.pdf PDF
Milliken_Treatment_Plant_Directions_and_Parking.pdf PDF
Appendix_E_of_the_Title_VI_Assurances.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Napa Public Works Contract Documents Form 4.4 (2024-2-13)

Project Title ____________________ BID BOND Project Number _________________

Bid Bond

________________________________________________________ (“Bidder”) has submitted a bid, dated ___________________________, 20______ (“Bid”), to the City of Napa, a California charter city (“City”), for work on the <_______________________________________________> Project (“Project”). Under this duly executed bid bond (“Bid Bond”), Bidder as Principal and ______________________________, its surety (“Surety”), are bound to City as obligee in the penal sum of ten percent of the maximum amount of the Bid (the “Bond Sum”). Bidder and Surety bind themselves and their respective heirs, executors, administrators, successors and assigns, jointly and severally, as follows:

1. General. If Bidder is awarded the Contract for the Project, Bidder will enter into the

Contract with City in accordance with the terms of the Bid.

2. Submittals. Within ten days following issuance of the Notice of Award to Bidder, Bidder must submit to City the following:

2.1 Contract. The executed Contract, using the form provided by City in the Project contract documents (“Contract Documents”);

2.2 Payment Bond. A payment bond for 100% of the maximum Contract Price, executed by a surety licensed to do business in the State of California using the Payment Bond form included with the Contract Documents;

2.3 Performance Bond. A performance bond for 100% of the maximum Contract Price, executed by a surety licensed to do business in the State of California using the Performance Bond form included with the Contract Documents; and

2.4 Insurance/Other. The insurance certificate(s) and endorsement(s) required by the

Contract Documents, and any other documents required by the Instructions to Bidders or Notice of Award.

3. Enforcement. If Bidder fails to execute the Contract or to submit the bonds and insurance certificates as required by the Contract Documents, Surety guarantees that Bidder forfeits the Bond Sum to City. Any notice to Surety may be given in the manner specified in the Contract and delivered or transmitted to Surety as follows:

Attn: _____________________________________________________ Address: __________________________________________________ City/State/Zip: ______________________________________________ Phone: ___________________________________________________ Fax: ______________________________________________________ Email: ____________________________________________________

4. Duration and Waiver. If Bidder fulfills its obligations under Section 2, above, then this obligation will be null and void; otherwise, it will remain in full force and effect for 60 days following the bid opening, unless extended by mutual written agreement between the City, Bidder, and Surety, or until this Bid Bond is returned to Bidder, whichever occurs first.

Surety waives the provisions of Civil Code §§ 2819 and 2845.

[Signatures are on the following page.] ddemaster Text Box Milliken Raw Water Pipeline Hardening HMGP ddemaster Highlight City of Napa Public Works Contract Documents Form 4.4 (2024-2-13) ddemaster Highlight City of Napa Public Works Contract Documents Form 4.4 (2024-2-13) ddemaster Text Box

9017FR20

ddemaster Text Box Milliken Raw Water Pipeline Hardening HMGP

Doug DeMaster Highlight

Doug DeMaster Highlight

City of Napa Public Works Contract Documents Form 4.4 (2024-2-13)

Project Title ____________________ BID BOND Project Number _________________

This Bid Bond is entered into and effective on ___________________, 20_____.

SURETY:

Business Name s/__________________________________ ______________________________ Date

Name, Title

(Attach Acknowledgment with Notary Seal and Power of Attorney)

BIDDER:

Business Name s/__________________________________ ______________________________ Date

Name, Title

END OF BID BOND

ddemaster

Milliken Raw Water Pipeline Hardening HMGP ddemaster

9017FR20

Text Field0:
Text Field1:
Text Field2:
Text Field3:

File details come from the government source that posted it. Updated .