bid-2864-24-award.pdf

PDF 33 KB Posted

Attached to
UPS Maintenance, Inspection, Repair, Parts and Replacement Services
Solicitation number
Bid 2864-24
Issued by
Belknap County, New Hampshire

About this file

This is a bid award summary document from the New Hampshire Division of Procurement Support Services for RFB 2864-24, UPS Maintenance, Inspection, Repair, Parts, and Replacement Services. The solicitation encompasses uninterruptible power supply (UPS) equipment maintenance services across five New Hampshire counties: Coos, Grafton, Hillsborough, Merrimack, and Rockingham. The contract includes approximately 80 pieces of equipment from multiple manufacturers including APC, MGE, Mitsubishi, Toshiba, Eaton, Powervar, and others. Required services encompass semi-annual minor inspections, annual major inspections, break-fix services, and 7x24x365 telephone support with two-hour callback and four-hour on-site emergency repair commitments. The bid closing date was January 2, 2024, at 11:00 AM, with the contract term spanning five years from May 1, 2024, through April 30, 2029, with potential two-year extension options available.

The bid summary reflects total bid amounts ranging from $261,857.42 to $1,067,500.00 across four participating vendors: EOLA Power, Ore Power LLC, United Power System, and DC Group. The awarded contract value totals $261,857.42. Vendor qualifications required include certification as an authorized service provider for specified UPS brands, comprehensive general liability insurance of $1,000,000 per occurrence, workers' compensation coverage, and registration with the New Hampshire Secretary of State. Pricing structure includes annual maintenance rates, labor rates stratified by county and service category, and parts markup limited to 10%. Successful vendors must provide quarterly and annual usage reports detailing services, parts replacements, and recycling documentation. Participating local entities may leverage the statewide contract through individual purchase orders on an optional basis.

View the file

Other files

File Type Posted
addendum-1-bid-2864-24.pdf PDF
addendum-3-bid-2864-24.pdf PDF
bid-2864-24-award.pdf PDF
bid-2864-24.pdf PDF
addendum-2-bid-2864-24.pdf PDF
attachment-1-bid-2864-24-rev2.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Procurement Support Services

Bureau of Purchase Property

RFB Bid Summary

Gary S. Lunetta

Director

(603) 271-2201

BELKNAP 0 $0.00 $0.00 $0.00 $0.00

CARROLL 0 $0.00 $0.00 $0.00 $0.00

CHESHIRE 0 $0.00 $0.00 $0.00 $0.00

COOS APC SU2200RTXLCD2U 1 $2,540.00 $4,525.00 $10,000.00 $2,312.81

APC SRT1500RMXLA 14 $35,560.00 $63,350.00 $98,000.00 $23,207.66

APC C1500 1 $2,540.00 $4,525.00 $7,000.00 $2,762.81

APC SRT3000XLW-IEC 2 $5,080.00 $9,050.00 $14,000.00 $3,315.38

APC SURTF30B4F30KVA 1 $5,040.00 $13,450.00 $20,000.00 $4,144.23

APC SYAF8KRMT 1 $3,790.00 $5,375.00 $12,000.00 $1,657.69

APC SURTF30B4F 1 $5,040.00 $13,450.00 $20,000.00 $2,762.81

APC SRT6KXLT 1 $2,540.00 $4,525.00 $12,000.00 $1,657.69

APC SRT1500RMXLA-NC 1 $2,540.00 $4,525.00 $7,000.00 $1,657.69

APC SURT20KRMXLT 2 $7,580.00 $24,900.00 $40,000.00 $8,841.00

APC SRT2200RMXLA-NC 1 $2,540.00 $4,525.00 $7,000.00 $2,762.81

APC SURT15KRMXLT 2 $7,580.00 $22,300.00 $34,000.00 $8,841.00

APS UPS SRT 5000VA RM208V 1 $2,540.00 $4,525.00 $7,000.00 $2,210.25

Cyber Power 550 3 $7,620.00 $13,575.00 $21,000.00 $3,315.39

Eaton 9355 1 $5,040.00 $11,150.00 $20,000.00 $5,525.62

Eaton 9155 5 $25,200.00 $55,750.00 $85,000.00 $27,628.10

Eaton 9390-40-80 (VRLE Sealed)

$6,290.00 $14,500.00 $27,000.00 $6,078.20

Eaton Trip Lite Smart 1500 13 $33,020.00 $58,825.00 $91,000.00 $21,550.10

Liebert APM 1 $6,290.00 $14,500.00 $27,000.00 $5,525.62

MGE Galaxy 4000 72-173005-00/50kVA 1 $6,290.00 $12,950.00 $25,000.00 $5,641.79

MGE Comet 72-160400-44/150kVA 2 $17,580.00 $34,870.00 $60,000.00 $14,366.64

MGE Comet 72-160400-44/100kVA 2 $15,080.00 $32,870.00 $60,000.00 $14,366.64

Mitsubishi 2033D 2 $15,080.00 $25,900.00 $54,000.00 $11,051.24

Mitsubishi

UP1133B - A603SU-2

60/80

$15,080.00 $25,900.00 $54,000.00 $13,261.52

Mitsubishi

UP9933A-

A803DU/80kVA

$22,620.00 $43,500.00 $81,000.00 $19,892.28

Mitsubishi 3033C/7.5kVA-50k VA 1 $6,290.00 $12,950.00 $20,000.00 $3,315.38

Powervar Security Plus UPS 1 $2,540.00 $4,525.00 $15,000.00 $3,867.94

Powervar 5.0KVA 1 $2,540.00 $4,525.00 $7,000.00 $3,315.38

Powervar 4.0KVA 1 $2,540.00 $4,525.00 $7,000.00 $3,315.38

Schneider Electric APC 360 4 $10,160.00 $18,100.00 $28,000.00 $6,630.80

Toshiba G9000/80kVA 1 $7,540.00 $11,950.00 $27,000.00 $7,183.32

AVC VAC Silicon SL240KG 1 $10,040.00 $5,000.00 $42,500.00 $7,735.87

UPS SRT 5000 VA 1 $2,540.00 $4,525.00 $7,000.00 $3,315.38

APC SRT5KXLT 1 $2,540.00 $4,525.00 $7,000.00 $3,315.38

APC SU2200RTXLCD2U 1 $2,540.00 $4,525.00 $7,000.00 $2,762.81

Triplite SU2200RTXLCD2U 1 $2,540.00 $4,525.00 $7,000.00 $2,762.81

STRAFFORD 0 $0.00 $0.00 $0.00 $0.00

SULLIVAN 0 $0.00 $0.00 $0.00 $0.00

$311,910.00 $602,990.00 $1,067,500.00 $261,857.42

Non-Compliant

EOLA Power

Term Total

Ore Power, LLC

Term Total

United Power

System

Term Total

DC Group

Term Total Model Number

Agency

Requisition #

Bid Closing

Statewide

N/A

1/2/2024 @ 11:00 AM

QTYCounty Manufacturer

Bid Description

RFB#

Agent Name

INDICATES AWARD:

UPS Maintenace, Inspection, Repair, Parts, and Replacemnet Services

2864-24

Lincoln Adams

TOTAL

ROCKINGHAM

No Equipment currently listed for Strafford County

No Equipment currently listed for Sullivan County

No Equipment currently listed for Belknap County

No Equipment currently listed for Carroll County

No Equipment currently listed for Carroll County

GRAFTON

HILLSBOROUGH

MERRIMACK

Page 1/1

File details come from the government source that posted it. Updated .