BCMP - Final Bid Set - 5.23.24.pdf
PDF 53 MB Posted
- Solicitation number
- Rec01-24
- Issued by
- Cheyenne County, Colorado
About this file
The document is a final bid set for the General Construction Services for Billy Cordova Memorial Park, a project initiated by the Town of Buena Vista, Colorado. The project involves constructing a comprehensive park spanning approximately 33,000 square feet at 142 Raven Way, designed to serve the Upper Arkansas River Valley and honor first responders. The park will include multiple amenities such as a playground, post-tension concrete multipurpose court, outdoor workout equipment, a labyrinth, grass open-play area, a prefabricated pavilion/restroom structure, two parking areas, sidewalks, and landscaping. Two community build days are planned: one for playground equipment assembly on August 24 with Star Playgrounds, and another for community-assisted construction of the labyrinth, landscaping, and trail connection.
The project emphasizes inclusive design, exceeding ADA requirements with features like sensory boxes, adaptive equipment, and fully accessible elements. The park will connect to the existing Peaks View Trail, extending the trail system by 1,700 feet. The Town of Buena Vista has already purchased the restroom/pavilion building from Romtec, Inc., which is expected to be delivered 10-12 weeks after receiving a Notice to Proceed. The park is located on consolidated lots in the Sunset Vista IV subdivision, rezoned to Open Space & Recreation, and fully owned by the Town of Buena Vista. The project represents a strategic response to rapid growth on the southwest side of town and aims to provide a valuable recreational asset for residents and the surrounding community.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .