The document is a Bid Form for the Billy Cordova Memorial Park Construction Project (Project Number: 24-Rec1) issued by the Town of Buena Vista, Colorado. The bid form details a comprehensive construction project for a 33,000-square-foot park located at 142 Raven Way, featuring a base bid and an add alternate for various park elements. The project includes multiple construction components such as mobilization, earthwork, concrete installations, drainage systems, landscaping, playground equipment, outdoor fitness equipment, parking areas, sidewalks, irrigation systems, fencing, electrical work, and utility connections. The bid form provides a detailed schedule of 70 base bid items and one add alternate item, with quantities specified for each element, allowing contractors to price out the complete park development.
The bid pricing structure allows contractors to submit unit prices for each line item, with a total base bid and an optional add alternate for stabilized crusher fines paving. The project is funded by the Town of Buena Vista and includes unique community engagement elements, such as two planned Community Build Days for playground equipment assembly and trail/landscaping work. Special construction features include ADA-compliant and inclusive design elements, a memorial theme honoring first responder Billy Cordova, and integration with existing town trail systems. The project aims to serve the Upper Arkansas River Valley, with amenities designed to accommodate multiple generations and physical abilities, including play structures, sensory areas, a labyrinth, fitness equipment, and a prefabricated restroom/pavilion structure previously purchased by the town.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF CONTRACT ITEMS AND PRICES | |||||
| Base Bid - Billy Cordova Memorial Park Construction | |||||
| Project Number: 24 - Rec1 | |||||
| Item No. | Item Description | Quantity | Unit | Unit Price | Item Total |
| 1 | Mobilization | 1 | LS | $ | $ |
| 2 | Construction Surveying | 1 | LS | $ | $ |
| 3 | Construction Fencing | 800 | LF | $ | $ |
| 4 | Clearing & Grubbing (coordination only) | 0.88 | AC | $ | $ |
| 5 | Removal of Curb & Gutter | 11 | LF | $ | $ |
| 6 | Sawcuty and Removal of Asphalt | 4 | SY | $ | $ |
| 7 | Stabilized Staging Area | 1 | EA | $ | $ |
| 8 | Concrete Washout | 1 | EA | $ | $ |
| 9 | Earthwork | 1 | LS | $ | $ |
| 10 | Earthwor, Haul Off Site | 440 | CY | $ | $ |
| 11 | Drywell | 13 | EA | $ | $ |
| 12 | Drywell Grates | 3 | EA | $ | $ |
| 13 | Perforated Pipe Drainage | 678 | LF | $ | $ |
| 14 | Multi-Purpose Court Striping | 1 | EA | $ | $ |
| 15 | ADA Parking Sign | 2 | EA | $ | $ |
| 16 | Concrete Curbwall at Playground | 122 | LF | $ | $ |
| 17 | PIP Surfacing to EWF Transition | 83 | LF | $ | $ |
| 18 | Post Tension Concrete Court | 2,688 | SF | $ | $ |
| 19 | Concrete Flatwork (4'' depth) | 280 | SY | $ | $ |
| 20 | Concrete Sidewalk (6'' depth) | 270 | SY | $ | $ |
| 21 | Concrete Parking Area (6'' depth) | 155 | SY | $ | $ |
| 22 | Poured-in-Place Surfacing Concrete Slab | 320 | SY | $ | $ |
| 23 | Concrete Wheel Stops | 10 | EA | $ | $ |
| 24 | Thickened Edge Concrete | 16 | LF | $ | $ |
| 25 | Concrete/Crusher Fines Intersection | 42 | LF | $ | $ |
| 26 | Concrete Pad at Restroom Shelter (6'' depth) | 111 | SY | $ | $ |
| 27 | PIP Surfacing Edger | 155 | LF | $ | $ |
| 28 | Concrete Curb Edge | 223 | LF | $ | $ |
| 29 | Recycled Asphalt Parking Area (8'' depth) | 95 | SY | $ | $ |
| 30 | Crusher Fines Paving | 3,640 | SF | $ | $ |
| 31 | Cobble Mulch 1''-2'' | 416 | SF | $ | $ |
| 32 | Cobble Mulch 2''-4'' | 8,227 | SF | $ | $ |
| 33 | Cobble Mulch 8''-12'' | 232 | SF | $ | $ |
| 34 | Pea Gravel (4'' depth) | 580 | SF | $ | $ |
| 35 | Dry Stream Crushed Granite (6" depth) | 2,450 | SF | $ | $ |
| 36 | Mexican Cobble - Sensory Area | 21 | SF | $ | $ |
| 37 | River Cobble (2''-4'') - Sensory Area | 31 | SF | $ | $ |
| 38 | Playground Coordination | 1 | LS | $ | $ |
| 39 | Restroom - Installation & Coordination | 1 | LS | $ | $ |
| 40 | Picnic Table - Install Only | 2 | EA | $ | $ |
| 41 | ADA Picnic Table - Install Only | 1 | EA | $ | $ |
| 42 | 2-Person Back and Arms Combo | 1 | EA | $ | $ |
| 43 | 4-Person Lower Body Combo | 1 | EA | $ | $ |
| 44 | 2-Person Cross Country Ski | 1 | EA | $ | $ |
| 45 | Basketball Hoop | 1 | EA | $ | $ |
| 46 | Bike Rack - Install Only | 1 | EA | $ | $ |
| 47 | Trash Receptacle - Install Only | 1 | LS | $ | $ |
| 48 | Bench-install only | 5 | EA | $ | $ |
| 49 | Synthetic Turf - Sensory Area | 5 | SF | $ | $ |
| 50 | Boulder-Large (3'-0'') | 98 | EA | $ | $ |
| 51 | Boulder-Medium (2'-0'') | 210 | EA | $ | $ |
| 52 | Boulder-Small (1'-0'') | 78 | Ea | $ | $ |
| 53 | Meter Pedestal | 1 | EA | $ | $ |
| 54 | Service Feeder and Main Pedestal | 1 | EA | $ | $ |
| 55 | Building Electrical Branch Circuits | 1 | EA | $ | $ |
| 56 | Soil Preparation/Fine Grading | 418 | CY | $ | $ |
| 57 | Deciduous Tree - 2.5'' Caliper | 8 | EA | $ | $ |
| 58 | Evergreen Tree - 8' height | 3 | EA | $ | $ |
| 59 | Ornamental Tree - 2'' Caliper | 10 | EA | $ | $ |
| 60 | Sodding | 8,093 | SF | $ | $ |
| 61 | POC equipment | 1 | LS | $ | $ |
| 62 | Irrigation Controller | 1 | EA | $ | $ |
| 63 | Irrigation (Spray - Turf Area) | 8,093 | SF | $ | $ |
| 64 | Irrigation (Planting Beds - Drip) | 8,755 | SF | $ | $ |
| 65 | Chain Link Fence - Black Vinyl Clad | 286 | LF | $ | $ |
| 66 | Chain Link Fence - Gate | 2 | EA | $ | $ |
| 67 | 10' Chain Link Maintenance Gate | 1 | EA | $ | $ |
| 68 | 4'' Sanitary Sewer Line | 142 | LF | $ | $ |
| 69 | 2'' Water Line | 103 | LF | $ | $ |
| 70 | Water Meter | 1 | EA | $ | $ |
SUBTOTAL BASE BID PRICE
| $ | |||||
| (Words) | (Numerals) | ||||
| SCHEDULE OF SUPPLEMENTAL ITEMS AND PRICES | |||||
| Add Alternate #1 - Billy Cordova Memorial Park Construction | |||||
| Project Number: 24 - Rec1 | |||||
| Item No. | Item Description | Quantity | Unit | Unit Price | Item Total |
| 1 | Stabilized Crusher Fines Paving | 2,878 | SF | $ | $ |
| Add Alternate 1 - Replace Crushers Fines Paving ares with Stabilized Crusher Fines Paving in all areas except for the Planting Beds. |
ADD ALTERNATE 1 PRICE
| $ | |
| (Words) | (Numerals) |
| Total Contract Price for Project: 24-Rec1 Billy Cordova Memorial Park Construction: |
| The Total Contract Price to be entered shall be the sum of the Bid Base plus Add Alternate #1. |
| $ | |
| (Words) | (Numerals) |
| Date of Submittal: | |
| Firm Name: | |
| Submitted By: | |
| Title: | |
| Bidder's Legal Status: | |
| State of Incorporation: | |
| Firm's Address: | |
| City, State, Zip Code: | |
| Phone Number: | |
| Contact Email: |
Attest (Seal if Bid Proposal is by Corporation):
image1.png
File details come from the government source that posted it. Updated .