This is a Base Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project, prepared by Santa Rosa County Procurement. The project encompasses comprehensive site development and stormwater management improvements, including clearing and grubbing, structure removal, pollution control, construction surveys, mobilization/demobilization, and traffic control. The work involves installation of biofilters, excavation and placement of earth material across nine focal points, urban forest tree boxes, drainage systems, topsoiling, concrete structures including inlets and curbing, asphalt work, steel reinforcement, HDPE plastic piping (4-inch and 12-inch diameter), rock riprap in varying quantities (100 to 1,000 tons across multiple applications), metal sign fabrication and installation, quality control testing, geotextile materials, vegetative planting measures, sodding (800 square yards), underground storage tanks (R-tanks), and permeable pavers (30,150 square feet). The pre-bid conference was held on January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions were to be submitted through the procurement portal by 12:00 p.m. on Friday, February 13, 2026, with sealed bid submissions due by 10:00 a.m. on Friday, February 20, 2026, through the Santa Rosa County Procurement Portal.
The pricing table establishes line items with corresponding construction specification numbers, units of measure (including jobs, lump sums, each, linear feet, tons, square yards, and square feet), and quantity requirements. Bidders must provide unit costs for materials and installation labor across multiple categories, with specific attention to per-square-foot pricing for plantings. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises. The County reserves the right to waive irregularities in bids, reject any or all bids for sound documented reasons, and award the contract based on what it determines to be in the best interest of Santa Rosa County. No specific contract term length or renewal options are detailed in this pricing table document.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_Template
| Table 1 | Line Item | Description | Construction Specification Number from Specs Binder Attachment | Unit of Measure | Quantity | Taxable | Unit Cost | SF | # 1-2 gall plants | $/SF material Cost | $/SF install cost | cost of install plantings |
| 1 | Clearing and Grubbing | 2 | Job | 1 | ||||||||
| 2 | Structure Removal | 3 | Job | 1 | ||||||||
| 3 | Pollution Control | 5 | Job | 1 | ||||||||
| 4 | Construction Surveys | 7 | Job | 1 | ||||||||
| 5 | Mobilization and Demobilization | 8 | Job | 1 | ||||||||
| 6 | Traffic Control | 9 | Job | 1 | ||||||||
| 6 | Water for Construction | 10 | Lump Sum | 1 | ||||||||
| 7 | Removal of Water | 11 | Lump Sum | 1 | ||||||||
| 7 | Biofilters-Focal Point 1-9 Complete and In Place | 21 | Lump Sum | |||||||||
| 7 | Excavation-Focal Point 1-9 Per Plans | 21 | Lump Sum | 1 | ||||||||
| 7 | Earthfill-Placement of Earth Material | 23 | Lump Sum | 1 | ||||||||
| 8 | Earthfill-Focal Point 1-Complete and In Place | 23 | Lump Sum | 1 | 39 | 5 to 8 | ||||||
| 9 | Earthfill-Focal Point 2-Complete and In Place | 23 | Lump Sum | 1 | 39 | 5 to 8 | ||||||
| 10 | Earthfill-Focal Point 3-Complete and In Place | 23 | Lump Sum | 1 | 77 | 8 to 10 | ||||||
| 11 | Earthfill-Focal Point 4-Complete and In Place | 23 | Lump Sum | 1 | 77 | 8 to 10 | ||||||
| 12 | Earthfill-Focal Point 5-Complete and In Place | 23 | Lump Sum | 1 | 62 | 6 to 8 | ||||||
| 13 | Earthfill-Focal Point 6-Complete and In Place | 23 | Lump Sum | 1 | 62 | 6 to 8 | ||||||
| 14 | Earthfill-Focal Point 7-Complete and In Place | 23 | Lump Sum | 1 | 32 | 4 to 6 | ||||||
| 15 | Earthfill-Focal Point 8-Complete and In Place | 23 | Lump Sum | 1 | 32 | 4 to 6 | ||||||
| 16 | Earthfill-Focal Point 9-Complete and In Place | 23 | Lump Sum | 1 | 24 | 4 to 5 | ||||||
| 17 | Earthfill-Urban Forest Tree Boxes-Complete and In Place | 23 | Lump Sum | 1 | ||||||||
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | 23 | Lump Sum | 1 | ||||||||
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 24 | Lump Sum | 1 | ||||||||
| 18 | Topsoiling | 26 | Job | 1 | ||||||||
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 32 | Each | 3 | ||||||||
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 32 | Job | 1 | ||||||||
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 32 | Linear Feet | 2400 | ||||||||
| 22 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 32-A | Job | 1 | ||||||||
| 23 | Asphalt-Thermoplastic Striping | 32-A | Job | 1 | ||||||||
| 23 | Steel Reinforcement-For Concrete Structures | 34 | Lump Sum | 1 | ||||||||
| 24 | Plastic Pipe-4" Diam. HDPE Pipe | 45 | Linear Feet | 316 | ||||||||
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 45 | Linear Feet | 392 | ||||||||
| 26 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 61 | Ton | 100 | ||||||||
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 61 | Ton | 1000 | ||||||||
| 28 | Rock Riprap-Drainage Swales within Landscape Islands | 61 | Ton | 300 | ||||||||
| 29 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 81 | Each | 10 | ||||||||
| 30 | Contractor Quality Control-Testing Etc. | 94 | Job | 1 | ||||||||
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 95 | Lump Sum | 1 | ||||||||
| 31 | Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county) | 440 | Lump Sum | 1 | ||||||||
| 32 | Vegetative Measures-sodding-centipede | 440 | Square Yards | 800 | ||||||||
| 32 | Excavation-R-Tanks Per Plans | Lump Sum | 1 | |||||||||
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In Place | Lump Sum | 1 | |||||||||
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | Lump Sum | 1 | |||||||||
| 33 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In Place | Square Feet | 30150 |