Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Santa Rosa County Administration Building Green Infrastructure
Solicitation number
26-010
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This is a Base Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project, prepared by Santa Rosa County Procurement. The project encompasses comprehensive site development and stormwater management improvements, including clearing and grubbing, structure removal, pollution control, construction surveys, mobilization/demobilization, and traffic control. The work involves installation of biofilters, excavation and placement of earth material across nine focal points, urban forest tree boxes, drainage systems, topsoiling, concrete structures including inlets and curbing, asphalt work, steel reinforcement, HDPE plastic piping (4-inch and 12-inch diameter), rock riprap in varying quantities (100 to 1,000 tons across multiple applications), metal sign fabrication and installation, quality control testing, geotextile materials, vegetative planting measures, sodding (800 square yards), underground storage tanks (R-tanks), and permeable pavers (30,150 square feet). The pre-bid conference was held on January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions were to be submitted through the procurement portal by 12:00 p.m. on Friday, February 13, 2026, with sealed bid submissions due by 10:00 a.m. on Friday, February 20, 2026, through the Santa Rosa County Procurement Portal.

The pricing table establishes line items with corresponding construction specification numbers, units of measure (including jobs, lump sums, each, linear feet, tons, square yards, and square feet), and quantity requirements. Bidders must provide unit costs for materials and installation labor across multiple categories, with specific attention to per-square-foot pricing for plantings. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises. The County reserves the right to waive irregularities in bids, reject any or all bids for sound documented reasons, and award the contract based on what it determines to be in the best interest of Santa Rosa County. No specific contract term length or renewal options are detailed in this pricing table document.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing_Table_Template

Table 1Line ItemDescriptionConstruction Specification Number from Specs Binder AttachmentUnit of MeasureQuantityTaxableUnit CostSF# 1-2 gall plants$/SF material Cost$/SF install costcost of install plantings
1Clearing and Grubbing2Job1
2Structure Removal3Job1
3Pollution Control5Job1
4Construction Surveys7Job1
5Mobilization and Demobilization8Job1
6Traffic Control9Job1
6Water for Construction10Lump Sum1
7Removal of Water11Lump Sum1
7Biofilters-Focal Point 1-9 Complete and In Place21Lump Sum
7Excavation-Focal Point 1-9 Per Plans21Lump Sum1
7Earthfill-Placement of Earth Material23Lump Sum1
8Earthfill-Focal Point 1-Complete and In Place23Lump Sum1395 to 8
9Earthfill-Focal Point 2-Complete and In Place23Lump Sum1395 to 8
10Earthfill-Focal Point 3-Complete and In Place23Lump Sum1778 to 10
11Earthfill-Focal Point 4-Complete and In Place23Lump Sum1778 to 10
12Earthfill-Focal Point 5-Complete and In Place23Lump Sum1626 to 8
13Earthfill-Focal Point 6-Complete and In Place23Lump Sum1626 to 8
14Earthfill-Focal Point 7-Complete and In Place23Lump Sum1324 to 6
15Earthfill-Focal Point 8-Complete and In Place23Lump Sum1324 to 6
16Earthfill-Focal Point 9-Complete and In Place23Lump Sum1244 to 5
17Earthfill-Urban Forest Tree Boxes-Complete and In Place23Lump Sum1
17Excavation-Urban Forest Tree Boxes Per Plans23Lump Sum1
17Drainfill-Within Focal Point and Urban Forest Systems24Lump Sum1
18Topsoiling26Job1
19Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place)32Each3
20Structure Concrete-Curbing-Replace Standup Curbs32Job1
21Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels32Linear Feet2400
22Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings32-AJob1
23Asphalt-Thermoplastic Striping32-AJob1
23Steel Reinforcement-For Concrete Structures34Lump Sum1
24Plastic Pipe-4" Diam. HDPE Pipe45Linear Feet316
25Plastic Pipe-12" Diam. HDPE Pipe45Linear Feet392
26Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap61Ton100
27Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers61Ton1000
28Rock Riprap-Drainage Swales within Landscape Islands61Ton300
29Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs81Each10
30Contractor Quality Control-Testing Etc.94Job1
30Geotextile-within Focal Point and Urban Forest Systems95Lump Sum1
31Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county)440Lump Sum1
32Vegetative Measures-sodding-centipede440Square Yards800
32Excavation-R-Tanks Per PlansLump Sum1
32Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In PlaceLump Sum1
33Excavation-PowerBlock Permeable Pavers Per PlansLump Sum1
33Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In PlaceSquare Feet30150

&"Helvetica Neue,Regular"&12&K000000&P