This is a Base Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida, detailing construction and landscaping line items with associated specifications and quantities. The project encompasses site preparation, stormwater management systems, hardscape improvements, and vegetative measures across multiple focal points and urban forest areas. Key construction elements include clearing and grubbing, structure removal, mobilization and demobilization, biofilters, earthfill placement at nine focal points, urban forest tree boxes, drainage systems, concrete structures (inlets, curbing, and ribbon curbs), asphalt work, steel reinforcement, HDPE piping in multiple diameters, rock riprap materials, metal sign fabrication, geotextile installation, pervious pavers (PowerBlock system), and sodding with centipede grass covering 800 square yards. The project also includes underground storage tanks (R-tanks) and planting measures for nine focal points where plants and trees are supplied by the county. A pre-bid meeting is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions must be submitted through the Santa Rosa County Procurement Portal by 12:00 p.m. on Friday, February 13, 2026, with sealed bids due by 10:00 a.m. on Friday, February 20, 2026, at which time proposals will be publicly opened.
The pricing table utilizes a template format requiring bidders to provide unit costs for materials and installation, with taxable designations for applicable line items. Quantities vary significantly across line items, from single job items to substantial quantities such as 2,400 linear feet of ribbon curb, 316 and 392 linear feet of 4-inch and 12-inch HDPE pipe respectively, 1,000 tons of crushed aggregate beneath pavers, and 30,150 square feet of pervious pavers. Santa Rosa County Board of County Commissioners encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises, with no discrimination based on race, color, religion, national origin, disability, sex, or age. The Board reserves the right to waive bid irregularities, reject any or all bids for documented reasons, and award the bid determined to be in the county's best interest.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_Template
| Table 1 | Line Item | Description | Construction Specification Number from Specs Binder Attachment | Unit of Measure | Quantity | Taxable | Unit Cost | SF | # 1-2 gall plants | $/SF material Cost | $/SF install cost | cost of install plantings |
| 1 | Clearing and Grubbing | 2 | Job | 1 | ||||||||
| 2 | Structure Removal | 3 | Job | 1 | ||||||||
| 3 | Pollution Control | 5 | Job | 1 | ||||||||
| 4 | Construction Surveys | 7 | Job | 1 | ||||||||
| 5 | Mobilization and Demobilization | 8 | Job | 1 | ||||||||
| 6 | Traffic Control | 9 | Job | 1 | ||||||||
| 6 | Water for Construction | 10 | Lump Sum | 1 | ||||||||
| 7 | Removal of Water | 11 | Lump Sum | 1 | ||||||||
| 7 | Biofilters-Focal Point 1-9 Complete and In Place | 21 | Lump Sum | |||||||||
| 7 | Excavation-Focal Point 1-9 Per Plans | 21 | Lump Sum | 1 | ||||||||
| 7 | Earthfill-Placement of Earth Material | 23 | Lump Sum | 1 | ||||||||
| 8 | Earthfill-Focal Point 1-Complete and In Place | 23 | Lump Sum | 1 | 39 | 5 to 8 | ||||||
| 9 | Earthfill-Focal Point 2-Complete and In Place | 23 | Lump Sum | 1 | 39 | 5 to 8 | ||||||
| 10 | Earthfill-Focal Point 3-Complete and In Place | 23 | Lump Sum | 1 | 77 | 8 to 10 | ||||||
| 11 | Earthfill-Focal Point 4-Complete and In Place | 23 | Lump Sum | 1 | 77 | 8 to 10 | ||||||
| 12 | Earthfill-Focal Point 5-Complete and In Place | 23 | Lump Sum | 1 | 62 | 6 to 8 | ||||||
| 13 | Earthfill-Focal Point 6-Complete and In Place | 23 | Lump Sum | 1 | 62 | 6 to 8 | ||||||
| 14 | Earthfill-Focal Point 7-Complete and In Place | 23 | Lump Sum | 1 | 32 | 4 to 6 | ||||||
| 15 | Earthfill-Focal Point 8-Complete and In Place | 23 | Lump Sum | 1 | 32 | 4 to 6 | ||||||
| 16 | Earthfill-Focal Point 9-Complete and In Place | 23 | Lump Sum | 1 | 24 | 4 to 5 | ||||||
| 17 | Earthfill-Urban Forest Tree Boxes-Complete and In Place | 23 | Lump Sum | 1 | ||||||||
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | 23 | Lump Sum | 1 | ||||||||
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 24 | Lump Sum | 1 | ||||||||
| 18 | Topsoiling | 26 | Job | 1 | ||||||||
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 32 | Each | 3 | ||||||||
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 32 | Job | 1 | ||||||||
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 32 | Linear Feet | 2400 | ||||||||
| 22 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 32-A | Job | 1 | ||||||||
| 23 | Asphalt-Thermoplastic Striping | 32-A | Job | 1 | ||||||||
| 23 | Steel Reinforcement-For Concrete Structures | 34 | Lump Sum | 1 | ||||||||
| 24 | Plastic Pipe-4" Diam. HDPE Pipe | 45 | Linear Feet | 316 | ||||||||
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 45 | Linear Feet | 392 | ||||||||
| 26 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 61 | Ton | 100 | ||||||||
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 61 | Ton | 1000 | ||||||||
| 28 | Rock Riprap-Drainage Swales within Landscape Islands | 61 | Ton | 300 | ||||||||
| 29 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 81 | Each | 10 | ||||||||
| 30 | Contractor Quality Control-Testing Etc. | 94 | Job | 1 | ||||||||
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 95 | Lump Sum | 1 | ||||||||
| 31 | Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county) | 440 | Lump Sum | 1 | ||||||||
| 32 | Vegetative Measures-sodding-centipede | 440 | Square Yards | 800 | ||||||||
| 32 | Excavation-R-Tanks Per Plans | Lump Sum | 1 | |||||||||
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In Place | Lump Sum | 1 | |||||||||
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | Lump Sum | 1 | |||||||||
| 33 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In Place | Square Feet | 30150 |