Base_Bid_Pricing_Table_Revision_2.6.26.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 26-010
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This is a Base Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida, detailing construction line items and associated costs. The project encompasses green infrastructure improvements including clearing and grubbing, structure removal, pollution control, construction surveys, mobilization and demobilization, traffic control, water management systems, biofilters, excavation, earthfill placement across nine focal points, urban forest tree boxes, drainage systems, topsoiling, concrete structures, asphalt work, steel reinforcement, plastic piping in various diameters, rock riprap, metal fabrication for signage, quality control testing, geotextile materials, vegetative planting measures, underground storage tanks, and pervious pavers. The pricing table lists 35 distinct line items with quantities measured in jobs, lump sums, each, linear feet, tons, square yards, and square feet. A pre-bid meeting is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions must be submitted through the Santa Rosa County Procurement Portal by 12:00 p.m. on Friday, February 13, 2026, with sealed bids due by 10:00 a.m. on Friday, February 20, 2026, at which time bids will be publicly opened.
The pricing table shows all line item unit costs and total costs are currently listed as $0.00, indicating that this is a revision document awaiting bidder pricing submissions. No specific contract award date, contract term, renewal options, or funding sources are identified in this pricing table document. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises, and reserves the right to waive irregularities in bids, reject any or all bids for documented reasons, and award contracts in the best interest of the County.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | Clearing and Grubbing | 1 | Job | ||
| 2 | Structure Removal | 1 | Job | ||
| 3 | Pollution Control | 1 | Job | ||
| 4 | Construction Surveys | 1 | Job | ||
| 5 | Mobilization and Demobilization | 1 | Job | ||
| 6 | Traffic Control | 1 | Job | ||
| 6 | Water for Construction | 1 | Lump Sum | ||
| 7 | Removal of Water | 1 | Lump Sum | ||
| 7 | Biofilters-Focal Point 1-9 Complete and In Place | ||||
| 1 | Lump Sum | ||||
| 7 | Excavation-Focal Point 1-9 Per Plans | ||||
| 1 | Lump Sum | ||||
| 7 | Earthfill-Placement of Earth Material | 1 | Lump Sum | ||
| 8 | Earthfill-Focal Point 1-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 9 | Earthfill-Focal Point 2-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 10 | Earthfill-Focal Point 3-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 11 | Earthfill-Focal Point 4-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 12 | Earthfill-Focal Point 5-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 13 | Earthfill-Focal Point 6-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 14 | Earthfill-Focal Point 7-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 15 | Earthfill-Focal Point 8-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 16 | Earthfill-Focal Point 9-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 17 | Earthfill-Urban Forest Tree Boxes-Complete and In Place | 6 | Each | ||
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | ||||
| 1 | Lump Sum | ||||
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 1 | Lump Sum | ||
| 18 | Topsoiling | 1 | Job | ||
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 3 | Each | ||
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 1 | Job | ||
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 2400 | Linear Feet | ||
| 22 | Structure Concrete-Mitered End Section | 1 | Each | ||
| 23 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 1 | Job | ||
| 24 | Asphalt-Thermoplastic Striping | 1 | Job | ||
| 23 | Steel Reinforcement-For Concrete Structures | 1 | Lump Sum | ||
| 25 | Plastic Pipe-4" Diam. HDPE Pipe | 316 | Linear Feet | ||
| 26 | Plastic Pipe-12" Diam. HDPE Pipe | 392 | Linear Feet | ||
| 27 | Plastic Pipe-15" Diam. HDPE Pipe | 84 | Linear Feet | ||
| 28 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 100 | Ton | ||
| 29 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 1000 | Ton | ||
| 30 | Rock Riprap-Drainage Swales within Landscape Islands | 300 | Ton | ||
| 31 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 33 | Each | ||
| 32 | Contractor Quality Control-Testing Etc. | 1 | Job | ||
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 1 | Lump Sum | ||
| 33 | Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county) | ||||
| 1 | Lump Sum | ||||
| 34 | Vegetative Measures-sodding-centipede | 800 | Square Yards | ||
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In Place | ||||
| 1 | Lump Sum | ||||
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | ||||
| 1 | Lump Sum | ||||
| 35 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In Place | ||||
| 30150 | Square Feet | ||||
| Total | $0.00 |
File details come from the government source that posted it. Updated .