Base_Bid_Pricing_Table_Revision_2.6.26.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Santa Rosa County Administration Building Green Infrastructure
Solicitation number
26-010
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This is a Base Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida, detailing construction line items and associated costs. The project encompasses green infrastructure improvements including clearing and grubbing, structure removal, pollution control, construction surveys, mobilization and demobilization, traffic control, water management systems, biofilters, excavation, earthfill placement across nine focal points, urban forest tree boxes, drainage systems, topsoiling, concrete structures, asphalt work, steel reinforcement, plastic piping in various diameters, rock riprap, metal fabrication for signage, quality control testing, geotextile materials, vegetative planting measures, underground storage tanks, and pervious pavers. The pricing table lists 35 distinct line items with quantities measured in jobs, lump sums, each, linear feet, tons, square yards, and square feet. A pre-bid meeting is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions must be submitted through the Santa Rosa County Procurement Portal by 12:00 p.m. on Friday, February 13, 2026, with sealed bids due by 10:00 a.m. on Friday, February 20, 2026, at which time bids will be publicly opened.

The pricing table shows all line item unit costs and total costs are currently listed as $0.00, indicating that this is a revision document awaiting bidder pricing submissions. No specific contract award date, contract term, renewal options, or funding sources are identified in this pricing table document. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises, and reserves the right to waive irregularities in bids, reject any or all bids for documented reasons, and award contracts in the best interest of the County.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled

Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
1Clearing and Grubbing1Job
2Structure Removal1Job
3Pollution Control1Job
4Construction Surveys1Job
5Mobilization and Demobilization1Job
6Traffic Control1Job
6Water for Construction1Lump Sum
7Removal of Water1Lump Sum
7Biofilters-Focal Point 1-9 Complete and In Place
1Lump Sum
7Excavation-Focal Point 1-9 Per Plans
1Lump Sum
7Earthfill-Placement of Earth Material1Lump Sum
8Earthfill-Focal Point 1-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
9Earthfill-Focal Point 2-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
10Earthfill-Focal Point 3-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
11Earthfill-Focal Point 4-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
12Earthfill-Focal Point 5-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
13Earthfill-Focal Point 6-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
14Earthfill-Focal Point 7-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
15Earthfill-Focal Point 8-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
16Earthfill-Focal Point 9-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
17Earthfill-Urban Forest Tree Boxes-Complete and In Place6Each
17Excavation-Urban Forest Tree Boxes Per Plans
1Lump Sum
17Drainfill-Within Focal Point and Urban Forest Systems1Lump Sum
18Topsoiling1Job
19Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place)3Each
20Structure Concrete-Curbing-Replace Standup Curbs1Job
21Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels2400Linear Feet
22Structure Concrete-Mitered End Section1Each
23Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings1Job
24Asphalt-Thermoplastic Striping1Job
23Steel Reinforcement-For Concrete Structures1Lump Sum
25Plastic Pipe-4" Diam. HDPE Pipe316Linear Feet
26Plastic Pipe-12" Diam. HDPE Pipe392Linear Feet
27Plastic Pipe-15" Diam. HDPE Pipe84Linear Feet
28Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap100Ton
29Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers1000Ton
30Rock Riprap-Drainage Swales within Landscape Islands300Ton
31Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs33Each
32Contractor Quality Control-Testing Etc.1Job
30Geotextile-within Focal Point and Urban Forest Systems1Lump Sum
33Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county)
1Lump Sum
34Vegetative Measures-sodding-centipede800Square Yards
32Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In Place
1Lump Sum
33Excavation-PowerBlock Permeable Pavers Per Plans
1Lump Sum
35Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In Place
30150Square Feet
Total$0.00