Attachment_12_-_Special_Topic_12-1_or_Contractor_Suggested_TO_(16_Apr_14).docx

DOCX document 27 KB Posted

Attached to
Laser Simulation, Analysis and Research (LSAR)
Solicitation number
BAA-RVKD-2014-0001
Issued by

About this file

Format for Special Topic Area 12-1 or Contractor-Suggested Task Orders

View the file

Other files

File Type Posted
Questions_and_Answers_26_Jul.docx DOCX document
SIFT_QA_20180723.pdf PDF
Attch_5_-_SIFT_Section_K_Reps_Certs.pdf PDF
Attch_2_-_SIFT_Supp_Req_20180629.pdf PDF
BAA-RVKD-2014-0001_Call_0007_SIFT.pdf PDF
Attch_4_-_SIFT_Draft_DD_254_20171117.pdf PDF
Attch_3_-_SIFT_Draft_CDRLs_A001-A006.pdf PDF
Attch_1_-_SIFT_SOO_20180629.pdf PDF
Attch_6_-_Cost_Proposal_Inst_20161019.pdf PDF
FLARE_CALL-0006_Q&As.pdf PDF
BAA-RVKD-2014-0001_Call_0006_FLARE__w_6_Attachments_20180319.pdf PDF
COSMO_QA_20171115.pdf PDF
BAA-RVKD-2014-0001_Call_0004_BARD_Q&A_(20170607).pdf PDF
Attachment_4_-_BARD_DD_Form_254.pdf PDF
Attachment_5_-_BARD_Section_K.pdf PDF
Attachment_1_-_BARD_SOO.pdf PDF
BAA_RVKD-2014-0001_Call_0004_BARD.pdf PDF
Attachment_2_-_BARD_SOW_Supplement.pdf PDF
Attachment_3_-_BARD_DD_Form_1423__CDRLS.pdf PDF
Attachment_6_-_BARD_Cost_Proposal_Instructions.pdf PDF
Guide_to_Preparing_CSOW.pdf PDF
LSAR_BAA_Amend_02_06_Mar_2017.pdf PDF
q&a.docx DOCX document
SOO_-_Phased_Array__25Aug2016.docx DOCX document
1_-_Statement_of_Objectives.pdf PDF
3_-_Contract_Data_Requirements_List_(Draft).pdf PDF
BAA-RVKD-2014-0001_Call_0003_(Final).pdf PDF
6_-_Cost_Proposal_Instructions.pdf PDF
5_-_Proposal_Adequacy_Checklist.pdf PDF
4_-_Contract_Security_Classification_Specification_(Draft).pdf PDF
2_-_Supplemental_Requirements.pdf PDF
7_-_Representations_and_Certifications.pdf PDF
1_-_Statement_of_Objectives.pdf PDF
BAA-RVKD-2014-0001_CALL_0002_(ALMS)_Q A_(06_Jun_2016).pdf PDF
BAA-RVKD-2014-0001_Call_0002_Amend_1_(24_May_2016).pdf PDF
BAA-RVKD-2014-0001_CALL_0002_(ALMS)_Q A_(23_May_2016).pdf PDF
Attch_4_-_ALMS_Draft_DoD_Security_Classification_Specification_DD_Form_254.pdf PDF
Attch_1_-_ALMS_SOO_(05_May_2016).pdf PDF
BAA-RVKD-2014-0001_Call_0002_(05_May_2016).pdf PDF
Attch_2_-_ALMS_SOW_Supplemental_Requirements_(05_May_2016).pdf PDF
Attch_3_-_ALMS_Draft_CDRL_DD_Form_1423_A001-A007.pdf PDF
Attch_5_-_Proposal_Adequacy_Checklist_(Jan_2014).pdf PDF
Attch_7_-_Representations_and_Certifications_(Section_K).pdf PDF
Attch_6_-_Cost_Proposal_Instructions_(06_Nov_2015).pdf PDF
Contract_awards.docx DOCX document
CALL_0001_-_LEAMER_v1_(17_Apr_15)(Amendment_3).docx DOCX document
Call_0001 _Summary_of_Changes_(Amendment_3).docx DOCX document
Q A_for_Call_0001_(version_6).docx DOCX document
Call_0001 _Summary_of_Changes_(Amendment_2).docx DOCX document
CALL_0001_-_LEAMER_v1_(11_Dec_14)(Amendment_2).docx DOCX document
Show 40 more

Latest 50 of 80 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LASER EFFECTS ASSESSMENT, MODELING, AND RESEARCH (LEAMR)

Technical Area 12 – Laser Interaction Testing Special Topic Area 12-1 16 April 2014

1. Special Topic Areas The Contractor has the opportunity to present a Contractor Statement of Work (CSOW) describing a novel solution to one or more of the following topics:

1.1. Non-contact high heating rate (several 100º C/sec) material properties measurements, specifically:

1.1.1. Optical (absorptance, reflectance and transmission)

1.1.2. Specific heat

1.1.3. Thermal conductivity

1.1.4. Thermal diffusivity

1.2. Experimental laser/material interaction imagery that can accomplish the following:

1.2.1. Record interaction through flames and smoke

1.2.2. Surface response to laser interaction at high irradiance values

1.2.3. Plume attenuation and species quantification

1.3. Data collection under high heating rate environments

1.3.1. Target thermal and structural response under rapidly changing thermal environments

1.4. Novel laser diagnostics in the areas of:

1.4.1. Beam quality and imagery

1.4.2. Irradiance

1.4.3. Power

1.5. Development of imaging system test-beds to include:

1.5.1. Design and fabrication

1.5.2. Operation

2. Format for CSOW The contractor shall propose to the above topics using the following format for response

· INTRODUCTION

· BACKGROUND

· SCOPE

· TECHNICAL REQUIREMENTS

· TRAVEL:

· SCHEDULE, DATA ITEMS:

· Start Work:

· End Work:

· Deliverable list and schedule

File details come from the government source that posted it. Updated .