B514_Att_08_Bid_Form.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Bldg. 514 Subfloor Removal & Epoxy Coating
- Solicitation number
- N0025326Q0005
About this file
This is a Bid Form template for solicitation N0025326Q0005 for Building 514 Subfloor Removal and Epoxy Floor coating at Naval Undersea Warfare Center (NUWC) Division, Keyport. The form is designed for contractors to submit detailed pricing proposals organized by line items, with separate columns for material costs, labor costs, equipment costs, and total line item pricing. Contractors are required to provide comprehensive task descriptions with sufficient detail to enable technical and price evaluation, including labor hours and rates by trade (HVAC technicians, electricians, general laborers, etc.), material quantities and unit costs, and equipment rental or usage fees. The form includes example rows demonstrating the expected level of detail for tasks such as air handler installation, site mobilization/demobilization, and equipment rental, which contractors must delete before submission.
The bid form requires contractors to calculate subtotals for all direct costs and apply overhead and profit markups as separate line items, with final pricing submitted as a Firm Fixed Price proposal amount for CLIN 0001 (Base Bid). All formulas used in calculating totals must be preserved in the spreadsheet rather than hard-entered as values. The solicitation is a 100% small business set-aside with NAICS code 238190 (size standard $19M annual revenue), requires FOB Destination pricing, and mandates that all responses be submitted via email to the identified Navy contracting officers with no paper copies accepted. Failure to complete all required representations, certifications, and sections of the RFQ prior to the closing deadline will result in rejection of the offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B514_Att_13_PPI_Answers.pdf | ||
| B514_N0025326Q00050001.pdf | ||
| B514_Att_02_Wage_Det.pdf | ||
| B514_Att_03_Guide_Safety.pdf | ||
| B514_Att_09_PPI_Form.docx | DOCX document | |
| B514_Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| B514_Att_10_Safety_Data.docx | DOCX document | |
| B514_Att_12_SOW.pdf | ||
| B514_Att_01_Material_Equip.xlsx | XLSX spreadsheet | |
| B514_Att_04_Guide_Environmental.pdf | ||
| B514_Att_11_OSHA.pdf | ||
| Solicitation - N0025326Q0005.pdf | ||
| B514_Att_05_Guide_OPSEC.pdf | ||
| B514_Att_07_Past_Performance.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| Bid Form Solicitation Number: | N0025326Q0005 | Contractor: | |
| PID Description: | Building 514 Subfloor Removal and Epoxy Floor | Date: | |
| Project Location: | Naval Undersea Warfare Center Division, Keyport | ||
| Note: | Refer to Statement of Work | ||
| Instructions: | Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion. |
Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.
| CLIN 0001 - Base Bid | Quantity | Unit | Unit Rate | Material Total | Labor Total | Equipment Total | Line Item Total | |
| Building 514 Subfloor Removal and Epoxy Floor | ||||||||
| ITEM | DESCRIPTION OF TASKS | |||||||
| A (example) | Air Handler | 1 | Unit | $1,000.00 | $1,000.00 | $1,000.00 | ||
| A (example) | Labor to Install Air Handler: HVAC Tech | 15 | Hrs | $65.00 | $975.00 | $975.00 | ||
| A (example) | Labor to Install Air Handler: Electrician | 3 | Hrs | $85.00 | $255.00 | $255.00 | ||
| A (example) | Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc) | 1 | Lot | $250.00 | $250.00 | $250.00 | ||
| A (example) | Equipment (scissor lift) | 2 | day | $100.00 | $200.00 | $200.00 | ||
| B (example) | Site mobilization/demobilization | $0.00 | ||||||
| B (example) | Labor for site mob/demob: General Laborer | 15 | Hrs | $45.00 | $675.00 | $675.00 | ||
| B (example) | Labor for site mob/demob: SSHO | 2 | Hrs | $85.00 | $170.00 | $170.00 | ||
| B (example) | Equipment (Truck and Trailer to haul air handler and materials to job site) | 1 | day | $450.00 | $450.00 | $450.00 | ||
| B (example) | Equipment (dump trailer for debris haul off) | 2 | day | $250.00 | $500.00 | $500.00 | ||
| 1 | ||||||||
| 2 | ||||||||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | <OFFEROR TO INSERT ROWS AS NECESSARY> | |||||||
| Subcontractor Performance Value | ||||||||
| Prime Contractor & Project Management Costs | ||||||||
| Subtotal | ||||||||
| General Home Office Overhead (%) | ||||||||
| General Field Overhead (%) | ||||||||
| General and Administrative (%) | ||||||||
| Profit (%) | ||||||||
| Bond | ||||||||
| CLIN 0001 Firm Fixed Price Proposal Amount |