B514_Att_08_Bid_Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Bldg. 514 Subfloor Removal & Epoxy Coating
Solicitation number
N0025326Q0005
Issued by

About this file

This is a Bid Form template for solicitation N0025326Q0005 for Building 514 Subfloor Removal and Epoxy Floor coating at Naval Undersea Warfare Center (NUWC) Division, Keyport. The form is designed for contractors to submit detailed pricing proposals organized by line items, with separate columns for material costs, labor costs, equipment costs, and total line item pricing. Contractors are required to provide comprehensive task descriptions with sufficient detail to enable technical and price evaluation, including labor hours and rates by trade (HVAC technicians, electricians, general laborers, etc.), material quantities and unit costs, and equipment rental or usage fees. The form includes example rows demonstrating the expected level of detail for tasks such as air handler installation, site mobilization/demobilization, and equipment rental, which contractors must delete before submission.

The bid form requires contractors to calculate subtotals for all direct costs and apply overhead and profit markups as separate line items, with final pricing submitted as a Firm Fixed Price proposal amount for CLIN 0001 (Base Bid). All formulas used in calculating totals must be preserved in the spreadsheet rather than hard-entered as values. The solicitation is a 100% small business set-aside with NAICS code 238190 (size standard $19M annual revenue), requires FOB Destination pricing, and mandates that all responses be submitted via email to the identified Navy contracting officers with no paper copies accepted. Failure to complete all required representations, certifications, and sections of the RFQ prior to the closing deadline will result in rejection of the offer.

View the file

Other files

File Type Posted
B514_Att_13_PPI_Answers.pdf PDF
B514_N0025326Q00050001.pdf PDF
B514_Att_02_Wage_Det.pdf PDF
B514_Att_03_Guide_Safety.pdf PDF
B514_Att_09_PPI_Form.docx DOCX document
B514_Att_06_Schedule_of_Values.xlsx XLSX spreadsheet
B514_Att_10_Safety_Data.docx DOCX document
B514_Att_12_SOW.pdf PDF
B514_Att_01_Material_Equip.xlsx XLSX spreadsheet
B514_Att_04_Guide_Environmental.pdf PDF
B514_Att_11_OSHA.pdf PDF
Solicitation - N0025326Q0005.pdf PDF
B514_Att_05_Guide_OPSEC.pdf PDF
B514_Att_07_Past_Performance.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

Bid Form Solicitation Number:N0025326Q0005Contractor:
PID Description:Building 514 Subfloor Removal and Epoxy FloorDate:
Project Location:Naval Undersea Warfare Center Division, Keyport
Note:Refer to Statement of Work
Instructions:Contractor to complete for all items required. Description should be sufficient to allow for technical and price evaluation in accordance with Section L instructions. Example rows are provided for guidance only to demonstrate the expected level of detail and should be deleted by contractor prior to completion.

Please leave all formulas utilized in calculating totals as formulas, rather than hard entering numbers in the "total" cells.

CLIN 0001 - Base BidQuantityUnitUnit RateMaterial TotalLabor TotalEquipment TotalLine Item Total
Building 514 Subfloor Removal and Epoxy Floor
ITEMDESCRIPTION OF TASKS
A (example)Air Handler1Unit$1,000.00$1,000.00$1,000.00
A (example)Labor to Install Air Handler: HVAC Tech15Hrs$65.00$975.00$975.00
A (example)Labor to Install Air Handler: Electrician3Hrs$85.00$255.00$255.00
A (example)Misc. Materials to install Air Handler (piping, ducting, electrical supplies, etc)1Lot$250.00$250.00$250.00
A (example)Equipment (scissor lift)2day$100.00$200.00$200.00
B (example)Site mobilization/demobilization$0.00
B (example)Labor for site mob/demob: General Laborer15Hrs$45.00$675.00$675.00
B (example)Labor for site mob/demob: SSHO2Hrs$85.00$170.00$170.00
B (example)Equipment (Truck and Trailer to haul air handler and materials to job site)1day$450.00$450.00$450.00
B (example)Equipment (dump trailer for debris haul off)2day$250.00$500.00$500.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14<OFFEROR TO INSERT ROWS AS NECESSARY>
Subcontractor Performance Value
Prime Contractor & Project Management Costs
Subtotal
General Home Office Overhead (%)
General Field Overhead (%)
General and Administrative (%)
Profit (%)
Bond
CLIN 0001 Firm Fixed Price Proposal Amount