B514_Att_01_Material_Equip.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Bldg. 514 Subfloor Removal & Epoxy Coating
- Solicitation number
- N0025326Q0005
About this file
This file is an Installed Equipment Contract template and example for documenting equipment and materials installed during a federal construction project. The template is designed to track equipment installations for Building 514 Subfloor Removal & Epoxy Coating project at Naval Undersea Warfare Center (NUWC) Division, Keyport under Contract N0025326Q0005. Contractors must complete the spreadsheet with detailed information for each asset installed, including building and room numbers, equipment descriptions, quantities, unit of measure, total installed costs (labor and material for both removal and installation), supplier contact information, manufacturer details (name, model number, serial number), warranty dates, and the asset number of any equipment removed. Each item with a unit of issue of "EACH" requires a separate line item.
The example provided demonstrates the required documentation format using two Breathing Air Filters and carpet installation. The Breathing Air Filters, supplied by Atlas Copco (Model FTX345BU) at $2,400.00 each, include manufacturer warranty expiration of 3/12/21 and installation date of 3/12/17. The carpet installation for rooms 116, 117, and 118 totaling 300 square feet was supplied by Mohawk through a Carpets vendor at $4,200.00. Contractors must submit completed spreadsheets to the government, which will assign new asset numbers during the FMS intake process. The template emphasizes that costing data must encompass all labor and material expenses associated with both removal of existing assets and installation of new equipment, and that digital submission via email to designated Navy contacts is required rather than paper copies or company quote forms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B514_N0025326Q00050001.pdf | ||
| B514_Att_13_PPI_Answers.pdf | ||
| B514_Att_04_Guide_Environmental.pdf | ||
| B514_Att_08_Bid_Form.xlsx | XLSX spreadsheet | |
| B514_Att_11_OSHA.pdf | ||
| B514_Att_02_Wage_Det.pdf | ||
| B514_Att_03_Guide_Safety.pdf | ||
| B514_Att_09_PPI_Form.docx | DOCX document | |
| B514_Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| B514_Att_10_Safety_Data.docx | DOCX document | |
| B514_Att_12_SOW.pdf | ||
| Solicitation - N0025326Q0005.pdf | ||
| B514_Att_05_Guide_OPSEC.pdf | ||
| B514_Att_07_Past_Performance.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Equipment
| Contract No: | |||||||||||||||
| Project Title: | Building 514 Subfloor Removal & Epoxy coating | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Notes: |
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. |
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. |
| 3. Enter equipment installed in column B and equipment removed in column O. |
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
Example
| Contract No: | NXXXXX-21-C-XXXX | ||||||||||||||
| Project Title: | Replace Breathing Air Filters and Install Carpet | ||||||||||||||
| Asset Number | Description | Long Description | Building No. | Room No. | Asset Qty | UOM | Replacement Cost | Supplier/Vendor | Manufacture | Model No. | Serial No. | Manufacture Warranty Expiration Date | Installation Date | Equipment Removed | |
| New Asset Number | |||||||||||||||
| (Note 4) | Description of Equipment or materials Installed | ||||||||||||||
| (Note 3) | Additional Relevant Information (e.g. size, capacity, limits, etc…) | Building # | Room Number of installed equipment | Quantity | |||||||||||
| (Note 1) | Standard Unit of Measure for asset installed | Cost (material and labor to remove (if applicable) and install asset | |||||||||||||
| (Note 2) | Name/Address/Email/ | ||||||||||||||
| Phone Number | Manufacturer | Model number of installed equipment | Serial number of installed equipment | MM/DD/YYYY | |||||||||||
| (Where no Manufacture Warranty use Contract Warranty Date) | MM/DD/YYYY | ||||||||||||||
| Asset Number of removed asset |
(if no label present on asset this column is Not Applicable) (Note 3)
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004356 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1H | |||
| Breathing Air Filter | located behind cabinet next to AHU-1 op switch | 5094 | 101 | 1 | EA | $2,400.00 | Atlas - 1234 Street Way, America WA 98383 atlas@msn.com/ | ||
| 360-123-4567 | Atlas Copco | FTX345BU | STB0004357 | 3/12/21 | 3/12/17 | 5094-0-101-154A-40-1J | |||
| CARPET | 5094 | 116, 117, 118 | 300 | SQFT | $4,200.00 | Carpets - 156 Lumber Way, |
Bert WA 98317 carpets@msn.com
| 360-266-0154 | Mohawk | MOHAWH - STRBU | N/A | 3/21/19 | 3/12/17 | N/A |
| Notes: | ||||||
| 1. When installing assets with a unit of issue of "EACH", there must be a separate line item for each asset. | ||||||
| 2. Costing data is to include the cost (labor and material) of removing the old asset and installing the new asset. | ||||||
| 3. Enter equipment installed in column B and equipment removed in column O. | ||||||
| 4. This column is not necessary for the final submittal from the contrator. FMS will create asset number when they receive the spreadsheet from the government. |
File details come from the government source that posted it. Updated .