B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet_DRAFT.pdf

PDF 122 KB Posted

Attached to
RPC Power Factor Correction Work Package 1 - Demolition
Solicitation number
SLAC_RFP_367094
Issued by

About this file

This is a bid form breakdown for RPC Demolition using the Uniformat II classification system. The document is designated as source selection sensitive information and presents a pricing template for demolition services organized into five primary work categories: Abatement (Lead Abatement B308), Building & Equipment Demolition (Ancillary Equipment, Shell Removal, Building Steel), Hoisting & Rigging (Synchronous Condenser Removal, Motors Removal, Off-Haul & Disposal), Foundation Demolition (Reinforced Concrete), and Sitework (Site Preparation).

The pricing structure requires bidders to provide labor hours, equipment and materials costs, and unit prices for each line item. Mark-up categories include Overhead/General Conditions, Bonds and Insurance, and Contractor's Fee, each with designated rate percentages to be applied to the subtotal. The form culminates in a total proposal pricing line. All line items and pricing fields in the submitted form are currently zero, indicating this is a blank template awaiting completion by the bidding contractor.

View the file

Other files

File Type Posted
B2_07.6_NTP_Submittal_Checklist_061424_DRAFT.pdf PDF
B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf PDF
B2_06_Section_H_(Special TsCs)_DRAFT.pdf PDF
B2_04_Section_F_(Deliveries_Performance)_DRAFT.pdf PDF
B2_07.2_Subcontractor_Form_IIPP_052121_DRAFT.pdf PDF
B2_08.0_Section_K_(Rep_and_Certs)_DRAFT.pdf PDF
B2_02_Section_B_(Supplies_or_Services_and_Price_Costs)_DRAFT.pdf PDF
B2_00_RFP_Cover_DRAFT.pdf PDF
B2_03.3_SLAC BIO Adopted Codes and Standards (Updated 01012025)_DRAFT.pdf PDF
B2_07.1_DBA_WD_CA20260018_7.14.26_Mod_06_DRAFT.pdf PDF
B2_07.4_SF1413_DRAFT.pdf PDF
B2_07.3_Work_Classification_Form_367094_DRAFT.pdf PDF
B2_09.0_Section_L_Instruction_to_Offerors_DRAFT.pdf PDF
B2_01_Section_A_(Subcontract_Form)_DRAFT.pdf PDF
B2_03.0_Section_C_(Specifications_SOW)_DRAFT.pdf PDF
B2_03.1_SOW_RPC WP1 Demolition_R3_DRAFT.pdf PDF
B2_05.1_Fixed_Price_Construction_March2024_DRAFT.pdf PDF
B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI)_DRAFT.pdf PDF
B2_07.5_SubcontractorFormSQF_DRAFT.pdf PDF
B2_10_Section_M_Evaluation_Methodology_DRAFT.pdf PDF
B2_05.0_Section_G_(General_TsCs)_DRAFT.pdf PDF
B2_07.8_Construction_Subcontracts_Final_Release_DRAFT.pdf PDF
B2_07.7_Final_Inspection_Report_DRAFT.pdf PDF
B2_08.1_Reps_and_Certs_Supplement_DRAFT.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Hours Equipment and Materials Price

A ABATEMENT 0 $0.00 $0.00

A10 LEAD ABATEMENT B308 0 $0.00 $0.00

B BUILDING & EQUIPMENT DEMOLITION 0 $0.00 $0.00

B10 ANCILLARY EQUIPMENT 0 $0.00 $0.00

B20 SHELL REMOVAL 0 $0.00 $0.00

B30 BUILDING STEEL 0 $0.00 $0.00

C HOISTING & RIGGING 0 $0.00 $0.00

C10 SYNCHRONOUS CONDENSER REMOVAL 0 $0.00 $0.00

C20 MOTORS REMOVAL 0 $0.00 $0.00

C30 OFF-HAUL & DISPOSAL 0 $0.00 $0.00

D FOUNDATION DEMOLITION 0 $0.00 $0.00

D10 REINFORCED CONCRETE 0 $0.00 $0.00

E SITEWORK 0 $0.00 $0.00

E10 SITE PREPARATION 0 $0.00 $0.00

SUBTOTAL $0.00

MARK-UP Rate Price

OVERHEAD / GENERAL CONDITIONS 0.00% $0.00

BONDS AND INSURANCE 0.00% $0.00

CONTRACTOR'S FEE 0.00% $0.00

SUBTOTAL $0.00

TOTAL PROPOSAL PRICING $0.00

TOTAL

Source Selection Sensitive Information RPC Demolition

Bid Form Breakdown (Uniformat II)

TOTAL

TOTAL

TOTAL

TOTAL

BASE BID

File details come from the government source that posted it. Updated .