B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf
PDF 170 KB Posted
- Solicitation number
- SLAC_RFP_367094
- Issued by
-
Department of Energy Office of Science
About this file
This document is a Section J attachment list for SLAC National Accelerator Laboratory's Supply Chain Management procedures.
The document provides a comprehensive index of eight required attachments for construction subcontracting activities, each with specific page counts and effective dates. Attachment 1 is the Davis Bacon Wage Determination (Mod No. 06), a 93-page document dated July 14, 2026, establishing prevailing wage requirements. Attachment 2 contains the Subcontractor Safety IIPP (Injury and Illness Prevention Program) policy, while Attachment 5 is the Subcontractor Safety Qualification Form (SQF), both dated May 21, 2021. Attachment 3 is a 7-page Work Classification Form dated July 15, 2026. Attachment 4 is the Standard Form SF1413 (2 pages, Rev. 10/2023), a federal contracting form. Attachment 6 is the NTP (Notice to Proceed) Submittal Checklist dated June 14, 2024, and Attachment 8 is the Construction Subcontracts Final Release form dated December 16, 2020. Attachment 7, the Final Inspection Report, has no date specified. These attachments collectively establish SLAC's requirements for contractor qualifications, safety compliance, wage determination, work classification, and contract administration procedures for construction subcontracting activities.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy
SECTION J (REV. 06/04/12) SLAC-SCM-GEN-036 PAGE 1 OF 1
SUPPLY CHAIN MANAGEMENT
Section J – List of Attachments
Document Type Description Pages Date
Attachment 1 Davis Bacon Wage Determination – Mod No. 06 93 July 14, 2026
Attachment 2 Subcontractor Safety IIPP 1 May 21, 2021
Attachment 3 Work Classification Form 7 July 15, 2026
Attachment 4 Standard Form SF1413 2 Rev. 10/2023
Attachment 5 Subcontractor Safety Qualification Form (SQF) 5 May 21, 2021
Attachment 6 NTP Submittal Checklist 1 June 14, 2024
Attachment 7 Final Inspection Report 1 N/A
Attachment 8 Construction Subcontracts Final Release 1 December 16, 2020