B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf

PDF 170 KB Posted

Attached to
RPC Power Factor Correction Work Package 1 - Demolition
Solicitation number
SLAC_RFP_367094
Issued by

About this file

This document is a Section J attachment list for SLAC National Accelerator Laboratory's Supply Chain Management procedures.

The document provides a comprehensive index of eight required attachments for construction subcontracting activities, each with specific page counts and effective dates. Attachment 1 is the Davis Bacon Wage Determination (Mod No. 06), a 93-page document dated July 14, 2026, establishing prevailing wage requirements. Attachment 2 contains the Subcontractor Safety IIPP (Injury and Illness Prevention Program) policy, while Attachment 5 is the Subcontractor Safety Qualification Form (SQF), both dated May 21, 2021. Attachment 3 is a 7-page Work Classification Form dated July 15, 2026. Attachment 4 is the Standard Form SF1413 (2 pages, Rev. 10/2023), a federal contracting form. Attachment 6 is the NTP (Notice to Proceed) Submittal Checklist dated June 14, 2024, and Attachment 8 is the Construction Subcontracts Final Release form dated December 16, 2020. Attachment 7, the Final Inspection Report, has no date specified. These attachments collectively establish SLAC's requirements for contractor qualifications, safety compliance, wage determination, work classification, and contract administration procedures for construction subcontracting activities.

View the file

Other files

File Type Posted
B2_04_Section_F_(Deliveries_Performance)_DRAFT.pdf PDF
B2_07.2_Subcontractor_Form_IIPP_052121_DRAFT.pdf PDF
B2_08.0_Section_K_(Rep_and_Certs)_DRAFT.pdf PDF
B2_02_Section_B_(Supplies_or_Services_and_Price_Costs)_DRAFT.pdf PDF
B2_00_RFP_Cover_DRAFT.pdf PDF
B2_03.3_SLAC BIO Adopted Codes and Standards (Updated 01012025)_DRAFT.pdf PDF
B2_07.1_DBA_WD_CA20260018_7.14.26_Mod_06_DRAFT.pdf PDF
B2_07.4_SF1413_DRAFT.pdf PDF
B2_07.3_Work_Classification_Form_367094_DRAFT.pdf PDF
B2_09.0_Section_L_Instruction_to_Offerors_DRAFT.pdf PDF
B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet_DRAFT.pdf PDF
B2_01_Section_A_(Subcontract_Form)_DRAFT.pdf PDF
B2_03.0_Section_C_(Specifications_SOW)_DRAFT.pdf PDF
B2_03.1_SOW_RPC WP1 Demolition_R3_DRAFT.pdf PDF
B2_05.1_Fixed_Price_Construction_March2024_DRAFT.pdf PDF
B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI)_DRAFT.pdf PDF
B2_07.5_SubcontractorFormSQF_DRAFT.pdf PDF
B2_10_Section_M_Evaluation_Methodology_DRAFT.pdf PDF
B2_05.0_Section_G_(General_TsCs)_DRAFT.pdf PDF
B2_07.8_Construction_Subcontracts_Final_Release_DRAFT.pdf PDF
B2_07.7_Final_Inspection_Report_DRAFT.pdf PDF
B2_08.1_Reps_and_Certs_Supplement_DRAFT.pdf PDF
B2_07.6_NTP_Submittal_Checklist_061424_DRAFT.pdf PDF
B2_06_Section_H_(Special TsCs)_DRAFT.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SECTION J (REV. 06/04/12) SLAC-SCM-GEN-036 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section J – List of Attachments

Document Type Description Pages Date

Attachment 1 Davis Bacon Wage Determination – Mod No. 06 93 July 14, 2026

Attachment 2 Subcontractor Safety IIPP 1 May 21, 2021

Attachment 3 Work Classification Form 7 July 15, 2026

Attachment 4 Standard Form SF1413 2 Rev. 10/2023

Attachment 5 Subcontractor Safety Qualification Form (SQF) 5 May 21, 2021

Attachment 6 NTP Submittal Checklist 1 June 14, 2024

Attachment 7 Final Inspection Report 1 N/A

Attachment 8 Construction Subcontracts Final Release 1 December 16, 2020

File details come from the government source that posted it. Updated .