B2_07.4_SF1413_DRAFT.pdf

PDF 699 KB Posted

Attached to
RPC Power Factor Correction Work Package 1 - Demolition
Solicitation number
SLAC_RFP_367094
Issued by

About this file

This is Standard Form 1413, a Statement and Acknowledgment form prescribed by GSA/FAR (48 CFR 53.222(e)) for documenting subcontract awards under federal prime contracts.

The form is completed for prime contract DE-AC02-76-SF00515 held by SLAC National Accelerator Laboratory, located at 2575 Sand Hill Road, Menlo Park, CA 94025. The form documents that a subcontract has been awarded to an unnamed subcontractor by the prime contractor. The prime contract contains the Contract Work Hours and Safety Standards Act – Overtime Compensation clause. Part II of the form requires the subcontractor to acknowledge inclusion of ten specific labor standards clauses, including provisions related to payroll and basic records, withholding of funds, construction wage rate requirements, apprentices and trainees, Copeland Act compliance, labor standards subcontracts, contract termination, debarment, and certification of eligibility. The form was signed by Doreen Agbayani, Sr. Subcontract Administrator, on behalf of the prime contractor. The document is a template form with OMB Control Number 9000-0066, expiring 5/31/2027, and is authorized for local reproduction.

View the file

Other files

File Type Posted
B2_04_Section_F_(Deliveries_Performance)_DRAFT.pdf PDF
B2_07.2_Subcontractor_Form_IIPP_052121_DRAFT.pdf PDF
B2_08.0_Section_K_(Rep_and_Certs)_DRAFT.pdf PDF
B2_02_Section_B_(Supplies_or_Services_and_Price_Costs)_DRAFT.pdf PDF
B2_00_RFP_Cover_DRAFT.pdf PDF
B2_03.3_SLAC BIO Adopted Codes and Standards (Updated 01012025)_DRAFT.pdf PDF
B2_07.1_DBA_WD_CA20260018_7.14.26_Mod_06_DRAFT.pdf PDF
B2_07.3_Work_Classification_Form_367094_DRAFT.pdf PDF
B2_09.0_Section_L_Instruction_to_Offerors_DRAFT.pdf PDF
B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet_DRAFT.pdf PDF
B2_01_Section_A_(Subcontract_Form)_DRAFT.pdf PDF
B2_03.0_Section_C_(Specifications_SOW)_DRAFT.pdf PDF
B2_03.1_SOW_RPC WP1 Demolition_R3_DRAFT.pdf PDF
B2_05.1_Fixed_Price_Construction_March2024_DRAFT.pdf PDF
B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI)_DRAFT.pdf PDF
B2_07.5_SubcontractorFormSQF_DRAFT.pdf PDF
B2_10_Section_M_Evaluation_Methodology_DRAFT.pdf PDF
B2_05.0_Section_G_(General_TsCs)_DRAFT.pdf PDF
B2_07.8_Construction_Subcontracts_Final_Release_DRAFT.pdf PDF
B2_07.7_Final_Inspection_Report_DRAFT.pdf PDF
B2_08.1_Reps_and_Certs_Supplement_DRAFT.pdf PDF
B2_07.6_NTP_Submittal_Checklist_061424_DRAFT.pdf PDF
B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf PDF
B2_06_Section_H_(Special TsCs)_DRAFT.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027

Part I - Statement Of Prime Contractor

1. Prime Contract Number 2. Date Subcontract

Awarded

3. Subcontract Number

Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 1413 (REV. 10/2023)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. Prime Contractor 5. Subcontractor

a. Name a. Name

b. Street Address b. Street Address

c. City d. State e. ZIP Code c. City d. State e. ZIP Code

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:

a. Name Of Awarding Firm

b. Description Of Work By Subcontractor

8. Project 9. Location

10a. Name Of Person Signing 11. By (Signature) 12. Date Signed

10b. Title Of Person Signing

Part II - Acknowledgment Of Subcontractor

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations

Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800

F Street, NW, Washington, DC 20405.

15b. Title Of Person Signing

15a. Name Of Person Signing 16. By (Signature) 17. Date Signed

14. Name(s) Of Any Intermediate Subcontractors, If Any

A C

DB

STANDARD FORM 1413 (REV. 10/2023) BACK

1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00' Presentation Agent Standard Form 1413 - Statement and Acknowledgment Statement And Acknowledgment OMB Control Number: 9000-0066 Expiration Date: 5/31/2027 Part I - Statement Of Prime Contractor

1. Prime Contract Number

2. Date Subcontract Awarded

3. Subcontract Number Authorized For Local Reproduction Previous Edition Is Not Usable

STANDARD FORM 1413 (REV. 10/2023)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. Prime Contractor

5. Subcontractor

a. Name

a. Name

b. Street Address

b. Street Address

c. City

d. State

e. ZIP Code

c. City

d. State

e. ZIP Code

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in Item 5 by the following firm:

a. Name Of Awarding Firm

b. Description Of Work By Subcontractor

8. Project

9. Location 10a. Name Of Person Signing

11. By (Signature)

12. Date Signed 10b. Title Of Person Signing Part II - Acknowledgment Of Subcontractor

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

15b. Title Of Person Signing 15a. Name Of Person Signing

16. By (Signature)

17. Date Signed

14. Name(s) Of Any Intermediate Subcontractors, If Any A C D B

STANDARD FORM 1413 (REV. 10/2023) BACK

1. Enter the Prime Contract Number. : DE-AC02-76-SF00515
4a. Enter the Prime Contractor's Name. : SLAC National Accelerator Laboratory
4b. Enter the Prime Contractor's Street Address. : 2575 Sand Hill Road
4c. Enter the Prime Contractor's City.: Menlo Park
7a. Enter the Name of the Awarding Firm.:
10a. Enter the Name of the Person signing this form as the Prime Contractor. : Doreen Agbayani
10b. Enter the Title of the Person signing this form as the Prime Contractor. : Sr. Subcontract Administrator
8. Enter the Project name.:
9. Enter the Location. :
7b. Enter a Description of Work completed by the Subcontractor. :
5c. Enter the Subcontractor's City.:
4e. Enter the Prime Contractor's Zone Improvement Plan (ZIP) Code. : 94025
5e. Enter the Subcontractor's Zone Improvement Plan (ZIP) Code. :
4d. Enter the Prime Contractor's State.: CA
5d. Enter the Subcontractor's State.:
3. Enter the Subcontract Number. :
5a. Enter the Subcontractor's Name.:
5b. Enter the Subcontractor's Street Address.:
2. Enter the Date the Subcontract was Awarded (enter 2 digit month, 2 digit day and 4 digit year).:
12. If you are the Prime Contractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).:
6. Click here to select, "the prime contract does contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 1
6. Click here to select, "the prime contract does NOT contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
16. Sign here if you are the Subcontractor.:
15b. Enter the Title of the Person Signing this form as the Subcontractor. :
15a. Enter the Name of the Person Signing this form as the Subcontractor. :
17. If you are the Subcontractor, enter the Date you signed this form (enter 2 digit month, 2 digit day and 4 digit year).:
14a. Enter the First Name of an Intermediate Subcontractor, If Any. :
14c. Enter the Third Name of an Intermediate Subcontractor, If Any.:
14d. Enter the Fourth Name of an Intermediate Subcontractor, If Any.:
14b. Enter the Second Name of an Intermediate Subcontractor, If Any.:

File details come from the government source that posted it. Updated .