This is a Statement of Work (SOW) cover page for SLAC National Accelerator Laboratory, operated by Stanford University for the U.S. Department of Energy. The document references one primary SOW titled "Reactive Power Compensation Power Factor Correction Work Package 1 - Demolition" Revision 3, dated July 15, 2026. The cover page is part of Section C of the Supply Chain Management documentation and indicates that all referenced applicable documents are attached. The document is marked as DRAFT and uses the SLAC document control number SLAC-SCM-GEN-030. This cover sheet does not contain detailed specifications, scope details, or contractual terms; it serves as a reference page directing the reader to the attached detailed Statement of Work document for the demolition work package related to reactive power compensation and power factor correction activities.

View the file

Other files

File Type Posted
B2_07.1_DBA_WD_CA20260018_7.14.26_Mod_06_DRAFT.pdf PDF
B2_07.4_SF1413_DRAFT.pdf PDF
B2_07.3_Work_Classification_Form_367094_DRAFT.pdf PDF
B2_09.0_Section_L_Instruction_to_Offerors_DRAFT.pdf PDF
B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet_DRAFT.pdf PDF
B2_01_Section_A_(Subcontract_Form)_DRAFT.pdf PDF
B2_03.1_SOW_RPC WP1 Demolition_R3_DRAFT.pdf PDF
B2_04_Section_F_(Deliveries_Performance)_DRAFT.pdf PDF
B2_07.2_Subcontractor_Form_IIPP_052121_DRAFT.pdf PDF
B2_08.0_Section_K_(Rep_and_Certs)_DRAFT.pdf PDF
B2_02_Section_B_(Supplies_or_Services_and_Price_Costs)_DRAFT.pdf PDF
B2_00_RFP_Cover_DRAFT.pdf PDF
B2_03.3_SLAC BIO Adopted Codes and Standards (Updated 01012025)_DRAFT.pdf PDF
B2_05.1_Fixed_Price_Construction_March2024_DRAFT.pdf PDF
B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI)_DRAFT.pdf PDF
B2_07.5_SubcontractorFormSQF_DRAFT.pdf PDF
B2_10_Section_M_Evaluation_Methodology_DRAFT.pdf PDF
B2_05.0_Section_G_(General_TsCs)_DRAFT.pdf PDF
B2_07.8_Construction_Subcontracts_Final_Release_DRAFT.pdf PDF
B2_07.7_Final_Inspection_Report_DRAFT.pdf PDF
B2_08.1_Reps_and_Certs_Supplement_DRAFT.pdf PDF
B2_07.6_NTP_Submittal_Checklist_061424_DRAFT.pdf PDF
B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf PDF
B2_06_Section_H_(Special TsCs)_DRAFT.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLAC NATIONAL ACCELERATOR LABORATORY • 2575 SAND HILL ROAD • MENLO PARK • CALIFORNIA • 94025 • USA Operated by Stanford University for the U.S. Department of Energy

SECTION C (REV. 6/01/12) SLAC-SCM-GEN-030 PAGE 1 OF 1

SUPPLY CHAIN MANAGEMENT

Section C – Statement of Work

Please refer to the following attached documents and all referenced applicable documents therein which are also attached to this Section:

1. Statement of Work titled “Reactive Power Compensation Power Factor Correction Work Package 1 - Demolition” R3 dated July 15, 2026.

DRAFT

File details come from the government source that posted it. Updated .