B2_07.7_Final_Inspection_Report_DRAFT.pdf
PDF 123 KB Posted
- Solicitation number
- SLAC_RFP_367094
- Issued by
-
Department of Energy Office of Science
About this file
This is a Final Inspection Report template used by SLAC National Accelerator Laboratory (located at 2575 Sand Hill Road, Menlo Park, CA 94025) to document completion of subcontracted work and authorize final payment release by Procurement. The report requires documentation of eight key completion milestones: (1) the date and attendees of the final inspection; (2) receipt and acceptance of red-line as-built drawings with dates and receiving parties; (3) receipt and acceptance of operation and maintenance manuals; (4) return of all ID badges and dosimeter badges, with a $500 penalty per unreturned dosimeter; (5) return of keys if applicable; (6) finalization of certified payrolls via LCP Tracker; (7) approval of the punch list by the Architect/Engineer, Facilities & Operations, and Subcontractor with signatures; and (8) issuance of the SLAC Building Inspection Office Final Certificate of Occupancy or Permit Card.
The report concludes with an Acknowledgement and Acceptance section requiring signatures and dates from the SLAC Project Manager, SLAC Construction Manager, and Subcontractor Project Manager. The template includes blank fields for subcontractor name, project name, subcontract number, and identifies Doreen Agbayani as the Contract Administrator (Doreena@slac.stanford.edu, phone: 650-926-7485). This template is mandatory for procurement to release final payment and serves as the official documentation that all work meets subcontract requirements.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENT
SUPPLY CHAIN MANAGEMENT
Date: MM/DD/YYYY 2575 Sand Hill Road, MS: 01
Menlo Park, CA 94025
PH: (650) 926-7485
Contract Administrator:
Doreen Agbayani Email: Doreena@slac.stanford.edu
FINAL INSPECTION REPORT
(Required by Procurement to release Final Payment)
Subcontractor Name Project Name Subcontract No
SLAC Project Manager SLAC Construction Manager SLAC Subcontract Administrator
The work was found to meet the requirements of the Subcontract as indicated below:
1. The Final Inspection was held on (Date): ; and attended by:
a. Attendees for SLAC:_____________________________________________________________
b. Attendees for Subcontractor:_______________________________________________________
2. Red-Line As-Built Drawings:
a. Received on: ; by:
b. Accepted on: ; by:
3. Operation & Maintenance Manuals:
a. Received on: ; by:
b. Accepted on: ; by:
4. All ID Badges & Dosimeter Badges received on: ($500/dosimeter not returned to SLAC)
5. Keys (if applicable) received on:
6. Certified Payrolls are complete and finalized via LCP Tracker on:
7. Punch List approved:
a. A/E: By: Signature
b. Facilities & Operations By: Signature
c. Subcontractor By: Signature
8. SLAC Building Inspection Office Final Certificate of Occupancy or Permit Card issued on:
ACKNOWLEDGEMENT AND ACCEPTANCE OF THIS FINAL INSPECTION REPORT:
Title Name Signature Date
SLAC PM
SLAC CM
Subcontractor PM