B09_SA_Amendment_5_Additional_Q_A.pdf
PDF 85 KB Posted
- Solicitation number
- 140D0425R0119
About this file
This document is an Additional Q&A for Solicitation 140D0425R0055, titled "Fort Cavazos Range Repair," dated 04/08/2025. The Q&A addresses two specific technical questions related to the project: first, the amperage of RLM lights along heating blankets for MATs 2 and 8, which is confirmed to be 5.10 amps for both thermals and lights; second, a clarification that all RLM work on Jack Mountain must be performed during a mandatory shut down. The document provides direct, concise answers to these technical inquiries, which appear to be part of the ongoing solicitation process for a range repair project at Fort Cavazos.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: 140D0425R0055 Project Name: Fort Cavazos Range Repair
Date: 04/08/2025
Additional Q&A
What is the amperage on the RLM lights along the heating blankets for MATs 2 and 8?
ANS: The amp load is 5.10 amps for the thermals and the lights.
Does all the RLM work on Jack Mountain need to be performed during mandatory shut down?
ANS: Yes.
File details come from the government source that posted it. Updated .