This document provides the results of a geophysical survey and concrete testing performed at the Salt River Bay National Historic Site and Ecological Preserve in St. Croix, USVI. The survey identified the reinforcement and structural details of buildings A through G, and the tower, on the property. Concrete cores were extracted from walls, floors, columns, and other structural elements to determine thickness, reinforcement type and spacing, and compression strengths. The report summarizes these findings for each building, and also includes survey schematics and core sample images in its appendices. The scope of work was limited to non-destructive testing as defined in the provided scope from the National Park Service, and structural evaluations or recommendations were excluded.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEOPHYSICAL REPORT
SALT RIVER BAY NATIONAL HISTORIC
SITE AND ECOLOGICAL PRESERVE
ST. CROIX, USVI
Submitted to:
Liollio Architecture; Aaron Bowman & Rick Bousquet
Prepared by:
Manuel E. Candelario Cosme, MSCE, PE
Tanayshalí Meléndez, BSCE
Date:
January 7, 2021
Job. No 8145
This report contains 51 pages including this cover.
Table of Content
1.0 INTRODUCTION:
2.0 FIELD WORK:
2.1 Geophysical Survey:
2.2 Concrete coring and testing:
3.0 SUMMARY OF RESULTS:
3.1 Building A:
3.2 Building B:
3.3 Building C:
3.4 Building D:
3.5 Building E:
3.6 Building F:
3.6 Building G:
3.7 Building Tower:
4.0 EXCLUSIONS:
GEOPHYSICAL SURVEY PERFORMED AT
SALT RIVER BAY NATIONAL HISTORIC SITE
ST. CROIX, USVI
1.0 INTRODUCTION:
Jaca & Sierra Engineering, PSC was contracted by Rick Bousquet from Liollio Architecture to perform geophysical surveys and concrete extractions to complement a structural evaluation to be performed by others. The scope of work was defined in the Structural
Geotechnical Scope section from the Geotechnical Supplemental Scope Information document developed and provided by National Park Service (NPS). This report will present the results of the geophysical survey, concrete core extraction, and compression strength test results.
Figure 1 presents a satellite image of the approximate project site location.
Figure 1: Satellite Image of Project Site (17.779864°, -64.761695°) Satellite Imagery obtained from
Google Earth.
Project Site
Page 2 of 19 – Job No. 8145 Salt River Bay National Historic Site, St. Croix, USVI January 14, 2021
P O B o x 3 6 3 1 1 6 , S a n J u a n , P R 0 0 9 3 6 - 3 1 1 6
( 7 8 7 ) 7 6 1 - 2 5 7 0 ( 7 8 7 ) 7 4 8 - 6 9 7 0 w w w . j a c a s i e r r a . c o m
Building identifications were defined in the scope of work provided by NPS as illustrated in Figure 2 below. Refer to Appendix A for an enhanced image.
2.0 FIELD WORK:
2.1 Geophysical Survey:
The field work consisted in performing geophysical surveying of various structural elements as requested in the scope of work provided to us. In all buildings, surveys were performed on walls and ground slabs with the purpose of identifying the spacing and cover
Figure 2: Salt Bay River Historic Site.
Page 3 of 19 – Job No. 8145 of the steel rebars (if any). This data was used to develop the schematics presented in
Appendix A.
The geophysical survey was performed by means of the Ground Penetration Radar
(GPR) with SIR 3000 computer and 1600 MHz antenna and radio detection equipment known as the Pipe Duct Locator (PDL). The GPR method consists of trailing an antenna through the test area while a periodic pulse is transmitted and received. The electromagnetic wave pulses are transmitted at the antennas center frequency of 300 and 1600 Mhz. Pulses propagate through the test medium directly under the antenna. The energy is reflected to the receiver whenever a change in electric impedance is encountered, such as the one produced by a steel rebar, conduit, void, or metal obstruction. The received signal is amplified and filtered in the
GPR computer. The antenna 1600 mhz was used to identify existing steel reinforcement and used to determine its spacing in different walls thought the structure.
A distance wheel odometer records distance along the test path, allowing for the determination of relative location of features from the starting point. A GPR survey is designed by establishing an “X, Y” axis and performing scans along parallel lines drawn at an offset distance. In this case, an offset of approximately 10 ft was used between surveys.
The resulting raw data is obtained in the form of echo amplitude versus time. The material’s dielectric constant is used to define velocity which is then used to convert echo time data to echo depth.
Page 4 of 19 – Job No. 8145
The conversion may be explained by the following equation:
VEM = c/εr0.5, D = (VEM T)/2 where "VEM" is the materials electromagnetic velocity, "c" is the speed of light, "εr" is the dielectric constant, "D" is depth below ground surface, and "T" is the two-way radar pulse travel time. Scans are typically viewed as waterfall plots of all scans along test path.
Lightness or darkness of the plot indicates amplitude and polarity.
2.2 Concrete coring and testing:
After completion of the geophysical surveys, concrete cores were performed at various locations (including walls, floor slabs and columns) with the purpose of identifying the thickness of the elements and to test the compressive strengths of the extracted samples. A total of sixty-one (61) cores (completed as per ASTM C42) were distributed as follows:
● Twenty-three (23) cores on walls (Buildings A, E, F, G);
● Fourteen (14) cores on walls (Buildings B, C, D);
● Twenty-three (23) cores on floor slabs;
● One (1) core on the closed staircase.
The location of the cores is illustrated in Appendix A. The following subsections present a summary of the findings at each Building.
Page 5 of 19 – Job No. 8145
3.0 SUMMARY OF RESULTS:
3.1 Building A:
A total of 9 cores were completed on this building: 4 on walls; 3 on floor slabs; 2 on columns. The following table provides a summary of the findings.
Table 1: Results Building A
Core ID Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
8 Column Reinforced Concrete Steel Rebars 10 to 12 1023 10 12 to 32
11 Floor Slab Concrete Wire Mesh 7 to 8 2752 11 to 12 11 to 12 M-1 Wall Masonry None 7 to 8 - - - M-2 Wall Masonry None 7 to 8 - - - M-3 Wall Masonry None 7 to 8 - - - M-4 Wall Masonry None 7 to 8 - - -
ASF-1 Floor Slab Concrete Wire Mesh 7 to 8 4650 11 to 12 11 to 12 ASF-2 Floor Slab Concrete Wire Mesh 7 to 8 3980 11 to 12 11 to 12
AWF-1 Column Reinforced Concrete Steel Rebars 10 to 12 1350 10 12 to 32
3.2 Building B:
A total of 11 cores were completed on this building: 6 on walls; 4 on floor slabs; 1 on columns. The following table provides a summary of the findings.
Page 6 of 19 – Job No. 8145
Table 2: Results Building B
Core
ID
Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
2 Column Reinforced Concrete Steel Rebars 10 to 12 1497 8 to 9 16 to 24
10 Floor Slab Concrete Wire Mesh 7 to 8 2364 6 to 7 6 to 7 M-5 Wall Masonry None 7 to 8 - - - M-6 Wall Masonry None 7 to 8 - - - M-7 Wall Masonry None 7 to 8 - - - M-8 Wall Masonry None 7 to 8 - - -
BWB-1 Wall Masonry None 7 to 8 - - - BWB-2 Wall Masonry None 7 to 8 - - - BSF-1 Floor Slab Concrete Wire Mesh 5 to 6 1580 10 to 12 10 to 12 BSF-2 Floor Slab Concrete Wire Mesh 5 to 6 2420 10 to 12 10 to 12 BSF-3 Floor Slab Concrete Wire Mesh 5 to 6 3780 10 to 12 10 to 12
3.3 Building C:
A total of 12 cores were completed on this building: 4 on walls and 8 on floor slabs.
The following table provides a summary of the findings.
Table 3: Results Building C
Core ID Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
5 Wall Reinforced Concrete Steel Rebars 6 to 7 1826 7.5 to 8 24 to 27
6 Floor Slab Concrete Wire Mesh 4 to 5 3104 6 to 7 6 to 7 M-9 Wall Masonry None 7 to 8 - - - M-11 Floor Slab Concrete Wire Mesh 7 to 8 - 6 to 7 6 to 7
CWB-1 Wall Masonry None 7 to 8 - - - CSL-1 Floor Slab Concrete Rebars 8 to 9 2580 10 to 12 14 to 18 CSL-2 Floor Slab Concrete Rebars 4 to 5 2130 10 to 12 14 to 18 CSL-3 Floor Slab Concrete Rebars 8 to 9 1480 10 to 12 14 to 18 CSB-1 Floor Slab Concrete Rebars 7 3540 6 to 7 6 to 7 CSF-1 Floor Slab Concrete Rebars 8 to 9 2450 7 to 8 17 to 18 CSF-2 Floor Slab Concrete Rebars 8 to 9 3940 7 to 8 17 to 18 CSF-3 Floor Slab Concrete Rebars 7 to 8 1080 11 to 12 11 to 12
Page 7 of 19 – Job No. 8145
3.4 Building D:
A total of 6 cores were completed on this building: 4 on columns and 2 on floor slabs. The following table provides a summary of the findings.
Table 4: Results Building D
Core ID Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
3 Column Reinforced Concrete Steel Rebars 10 to 12 1289 9 to 10 20 to 23
7 Column Reinforced Concrete Steel Rebars 10 to 12 2114 9 20 to 23
DWB-1 Wall Masonry None 6 to 7 1510 - - DWB-2 Wall Masonry None 6 to 7 1790 - - DSF-1 Floor Slab Concrete Wire Mesh 8 to 9 1790 10 to 12 14 to 18 DSF-2 Floor Slab Concrete Wire Mesh 8 to 9 2310 10 to 12 14 to 18
3.5 Building E:
A total of 8 cores were completed on this building: 7 on walls and 1 on floor slabs.
The following table provides a summary of the findings.
Table 5: Results Building E
Core
ID
Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
1 Wall Reinforced Concrete Steel Rebars 6 to 7 2017 6 to 10 12 to 20
M-12 Wall Masonry None 6 to 7 - - - M-13 Wall Masonry None 7 to 8 - - - M-14 Wall Masonry None 6 to 7 - - - M-15 Wall Masonry None 6 to 7 - - - M-16 Wall Masonry None 6 to 7 - - - M-17 Wall Masonry None 6 to 7 - - - ESF-1 Floor Slab Concrete Rebars 5 to 6 3420 6 to 8 17 to 20
Page 8 of 19 – Job No. 8145
3.6 Building F:
A total of 10 cores were completed on this building: 6 on walls and 4 on floor slabs.
The following table provides a summary of the findings.
Table 6: Results
Building F
Core
ID
Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
1 Floor Slab Concrete Wire Mesh 5 to 6 4226 6 to 7 6 to 7 M-18 Wall Masonry None 7 to 8 - - - M-19 Wall Masonry None 7 to 8 - - - M-20 Wall Masonry None 7 to 8 - - - FSF-1 Floor Slab Concrete Wire Mesh 5 to 6 2010 6 to 7 6 to 7 FSF-2 Floor Slab Concrete Wire Mesh 5 to 6 1200 6 to 7 6 to 7 FSF-3 Floor Slab Concrete Wire Mesh 5 to 6 4510 6 to 7 6 to 7
FWB-1 Wall Masonry None 7 to 8 - - - FWB-2 Wall Masonry None 7 to 8 - - - FWB-3 Wall Masonry None 7 to 8 - - -
3.6 Building G:
A total of 4 cores were completed on this building: all cores on walls. The following table provides a summary of the findings.
Table 7: Results Building G
Core
ID
Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
M-21 Wall Masonry None 7 to 8 - - - M-22 Wall Masonry None 7 to 8 - - - M-23 Wall Masonry None 7 to 8 - - - M-24 Wall Masonry None 7 to 8 - - -
Page 9 of 19 – Job No. 8145
3.7 Building Tower:
Only one core was performed at a wall. The following table provides a summary of the findings.
Table 8: Results Tower
Core
ID
Tested Element Type Reinforcement Thickness
(inches) Compression Strength (psi)
Vertical Spacing (inches)
Horizontal Spacing (inches)
9 Wall Reinforced Concrete Steel Rebars 7 to 8 3613 9 to 11 8 to 12
4.0 EXCLUSIONS:
This report excludes any structural evaluation and engineering recommendation. The scope of work consisted in the Structural Testing and Investigation section from the
Geotechnical Supplemental Scope Information document developed and provided by
National Park Service (NPS) which stated the type of testing to be conducted.
Note that these results are based on geophysical survey, concrete core extraction, and compression strength test results chosen by the client, which are considered as representative of the entire elements from which they were obtained.
Page 10 of 19 – Job No. 8145
We wish to thank you for the opportunity of being of service.
Cordially, JACA & SIERRA ENGINEERING, PSC
Manuel E. Candelario Cosme, MSCE, PE
Tanayshalí Meléndez Santana, BSCE
Enclosures Appendix A: Surveyed Areas and Building Divisions Appendix B: Concrete Cores- Building A Appendix C: Concrete Cores- Building B Appendix D: Concrete Cores- Building C Appendix E: Concrete Cores- Building D Appendix F: Concrete Cores- Building E Appendix G: Concrete Cores- Building F Appendix H: Concrete Cores- Building T
Appendix A
Surveyed Areas and Building Divisions
Appendix A: Surveyed Areas and Building Divisions
Appendix A1: First Level Wall Cores Summary
AWF-1
M-1
M-3 M-2
M-4
M-18
M-19 M-20
M-21
M-5
M-6 M-7
M-8 M-9
M-13
M-12
M-14
M-17
M-15
M-16
Legend:
Wall
Reinforced Concrete
Masonry
Appendix A2: Basement Level Wall Cores Summary
FWB-3
FWB-2
FWB-1
BWB-1 BWB-2
CWB-1
DWB-2
DWB-1
Legend:
Wall
Reinforced Concrete
Masonry
Drill bit *Note: Drill bit were performed to confirm masonry wall.
Appendix A3: First Level Slab Cores Summary
ASF-2
CSF-3 M-11
CSL-1 CSL-2
CSL-3
CSF-1
DSF-1
CSF-1
ESF-1FSF-1
FSF-2
FSF-3
BSF-3 BSF-2 BSF-1
ASF-1
Legend:
Slab
RC Floor Slab
Appendix A4: Basement Level Slab Cores Summary
CSB-1
Legend:
Appendix B
Concrete Cores- Building A
A
Appendix B: Concrete Cores - Building A
Legend:
Wall
Reinforced Concrete
Masonry
Slab
RC Floor Slab
ASF-1
ASF-2
M-2
M-3
AWF-1M-1
M-4
A Vertical Rebar Spacing= 10 inches.
NOTES:
Horizontal Rebar Spacing Varies=12.00 , 22.00 and 32.00 inches.
Concrete cover = 2.30 inches (Applies to horizontal and vertical rebar spacings).
Extracted Core No.8
Sewer Pipe
32”
12”
22”
Appendix B1: Concrete Cores - Building A
A
Rebar Spacing= 11.00 to 12.00 inches.
Concrete cover =4.00 inches (Steel Wire
Mesh reinforcement)
Extracted Core No.11
Appendix B2: Concrete Cores - Building A
Appendix C
Concrete Cores- Building B
B
BSF-3 BSF-2 BSF-1
M-5
M-6 M-7
M-8
Appendix C: Concrete Cores - Building B – 1st Level
Legend:
Wall
Reinforced Concrete
Masonry
BWB-1 BWB-2
Appendix C1: Concrete Cores - Building B – Basement Level
Legend:
Wall
Reinforced Concrete
Masonry
Vertical Rebar Spacing = 9.00 to 10.00 inches.
Concrete Cover =3.00 inches.
Rebar Spacing= 15.00 to
17.00 inches. Concrete Cover= of 2.00 inches.
Rebar Spacing=28.00 inches. Concrete Cover= 2.00 inches.
Horizontal Rebar Spacing= 15.00 to
17.00 inches.
Concrete Cover = 2.00 inches.
Appendix C2: Concrete Cores - Building B
Horizontal Rebar Spacing=
16.00 to 24.00 inches.
Concrete Cover= 2.00 inches.
Vertical Rebar Spacing= 8.00 to 9.00 inches.
Concrete Cover= 2.50 inches.
Extracted Core No.2
Appendix C3: Concrete Cores - Building B
Spacing= 6.00 to 7.00 in.
(Steel Reinforcement)
Extracted Core No.10
Extracted Core No.10 (extracted one core with Wire Mesh Steel Reinforcement)
Appendix C4: Concrete Cores - Building B
Appendix D
Concrete Cores- Building C
C
M-11
CSF-3
CSL-1 CSL-2
CSL-3
CSF-1
M-9
Appendix D: Concrete Cores - Building C – 1st Level
Legend:
Wall
Reinforced Concrete
Masonry
CSB-1
Appendix D1: Concrete Cores - Building C – Basement Level
Legend:
Vertical Rebar Spacing= 7.50 to 8.00 inches.
Concrete Cover = 2.00 inches.
Horizontal Rebar Spacing= 24.00 to
27.00 inches. Concrete Cover= 1.50 inches.
Extracted Core No.5
Appendix D2: Concrete Cores - Building C
Rebar Spacing = 6.00 to
7.00 inches (Wire Mesh
Steel Reinforcement)
Extracted Core No.6
Appendix D3: Concrete Cores - Building C
Appendix E
Concrete Cores- Building D
D
DSF-1
DSF-2
Appendix E: Concrete Cores - Building D – 1st Level
Legend:
Wall
Reinforced Concrete
Masonry
DWB-1
DWB-2
Appendix E1: Concrete Cores - Building D – Basement Level
Legend:
Wall
Reinforced Concrete
Masonry
Horizontal Rebar
Spacing= 20.00 to
23.00 inches.
Concrete Cover=
4.00 to 5.00 inches.
Vertical Rebar Spacing = 8.50 inches.
Concrete Cover= 5.00 to 6.00 inches.
Extracted Core No.7
Appendix E2: Concrete Cores - Building D
20.00 to 23.00 inches.
Concrete Cover= 1.50 inches.
Vertical Rebar Spacing= 9.00 to
10.00 inches.
1.50 in. of cover approx.
Extracted Core No.3
Appendix E3: Concrete Cores - Building D
Vertical Rebar Spacing= 8.00 to 9.00 inches. Concrete Cover= 3.00 inches.
Horizontal Rebar Spacing=
18.00 to 21.00 inches.
Concrete Cover=
4.00 inches.
Appendix E4: Concrete Cores - Building D
Vertical Rebar Spacing= 10.00 to
12.00 inches.
Concrete Cover=
7.00 inches. .
Horizontal Rebar Spacing= 14.00 to 18.00 inches. Concrete Cover=
6.00 inches.
Note:
Slab Thickness = 8 to 9 inches.
Appendix E5: Concrete Cores - Building D
Appendix F
Concrete Cores- Building E
E
M-13
ESF-1
M-14
M-17
M-16
M-15 M-12
Appendix F: Concrete Cores - Building E
Legend:
Wall
Reinforced Concrete
Masonry
Masonry Block Wall
Vertical Rebar Spacing= 6.00 to
10.00 inches. Concrete Cover=
5.00 inches.
Horizontal Rebar Spacing= 12.00 and 20.00 inches. Concrete
Cover= 5.00 inches.
Extracted Core No.1 (extracted one core with reinforcement rebar)
Appendix F1: Concrete Cores - Building E
17.00 to 20.00 inches. Concrete cover= 6.50 inches.
Vertical Rebar Spacing=
6.00 to 8.00 inches.
Concrete cover= 5.60 inches.
Appendix F2: Concrete Cores - Building E
Appendix G
Concrete Cores- Building F
FSF-1
M-20
F
M-19
M-18
FSF-2
FSF-3
Appendix G: Concrete Cores - Building F – 1st Level
Legend:
Wall
Reinforced Concrete
Masonry
FWB-1
F
FWB-2
FWB-3
Appendix G1: Drill Bit- Building F- Basement Level
Legend:
Wall
Drill bit*
*Note: Drill bit were performed to confirm masonry wall.
F
Vertical Rebar Spacing = 6.00 to 7.00 inches. (Wire Mesh
Steel Reinforcement)
Extracted Core No.12
Appendix G2: Concrete Cores - Building F- Basement Level
Appendix H
Concrete Cores- Building T
T
Appendix H: Concrete Cores - Building T
Legend:
Wall
Reinforced Concrete
Masonry
T Vertical Rebar Spacing=
9.00 to 11.00 inches.
Concrete Cover= 2.00 inches.
Horizontal Rebar Spacing= 8.00 to 12.00 inches. Concrete Cover=
1.00 inches.
Appendix H1: Concrete Cores - Building T
| Portada.pdf |
| SALT RIVER BAY NATIONAL HISTORIC SITE AND ECOLOGICAL PRESERVE |
| ST. CROIX, USVI |
| reporte final.pdf |
| 1.0 INTRODUCTION: |
| Figure 1: Satellite Image of Project Site (17.779864 , -64.761695 ) Satellite Imagery obtained from Google Earth. |
| 2.0 FIELD WORK: |
| 2.1 Geophysical Survey: |
| 2.2 Concrete coring and testing: |
| 3.0 SUMMARY OF RESULTS: |
| 3.1 Building A: |
| 3.2 Building B: |
| 3.3 Building C: |
| 3.4 Building D: |
| 3.5 Building E: |
| 3.6 Building F: |
| 3.6 Building G: |
| 3.7 Building Tower: |
4.0 EXCLUSIONS:
| Appendixes.pdf |
| Surveyed Areas and Building Divisions |
| Concrete Cores- Building A |
| Concrete Cores- Building B |
| Concrete Cores- Building C |
| Concrete Cores- Building D |
| Concrete Cores- Building E |
| Concrete Cores- Building F |
| Concrete Cores- Building T |
| Geophysical Survey Readings |
| Version final.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Slide Number 31 |