This document provides details for a federal solicitation to rehabilitate the Salt River Visitor Contact Station at Salt River Bay in the U.S. Virgin Islands. The solicitation number is 140P2021R0158 and is being conducted as a total small business set-aside. The work includes rehabilitating the visitor contact station building and site. A mandatory pre-proposal conference and site visit will be held on October 21, 2021 at 1pm Atlantic Standard Time at the project site as specified in clause 52.236-27 of the solicitation package. Interested parties should review the attached solicitation package for full requirements, specifications, response instructions and dates. The contracting agency is the Department of the Interior National Park Service National Office.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION DOCUMENTS
A/E FIRM
PRIME/ARCH:
LIOLLIO ARCHITECTURE
CHARLESTON, SC
MEP:
DWG INC.
MOUNT PLEASANT, SC
STRUCTURAL:
4SE
CHARLESTON, SC
Mark Sheet REVISION Date Initial QUALITY DESIGN CERTIFICATION Prepared in Accordance with Design
Variance from Design Development (Title I)
OR
OR
Development (Title I)
Approved by Superintendent on
Construction Drawing Not Preceded by Design Development (Title I)
Drawing No.
Drawing No.
Project Manager Date
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
DENVER SERVICE CENTER REGION ISLAND TERRITORY
SOUTHEAST ST CROIX VIRGIN ISLANDS
SALT RIVER BAY
TITLE OF PROJECT
SHEET
PMIS/PKG NO.
OF
SALT RIVER BAY NATIONAL HISTORICAL PARK
SALT RIVER BAY NATIONAL HISTORICAL PARK & ECOLOGICAL PRESERVE
NAME OF PARK
LOCATION WITHIN PARK
251127CIVIL + LANDSCAPE:
STANTEC
NORTH CHARLESTON, SC
REHABILITATE SALT RIVER VISITOR
CONTACT STATION
DRAWING NO.
170432
08/02/2021FINAL CONSTRUCTION DOCUMENTS
REHABILITATE VISITOR CONTACT STATION
SITE LOCATION
SITE LOCATION
SITE LOCATION
ST. CROIX
DOUGLAS
DENK
Digitally signed by
DOUGLAS DENK
Date: 2021.08.19 13:25:25 -06'00'
✔ 399-170432
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
251127
170432
1698/
/2
:5 0:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
PROJECT INFORMATION &
INDEX
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
A0. 01 ASSEMBLY TYPES
A0. 02 MOCK-UP PANEL (OPTION)
A0. 03 FINISH LEGEND & ROOM SCHEDULE
A0. 04 SIGNAGE SCHEDULE AND DETAILS
A1. 01 ARCHITECTURAL SITE PLAN (BASE)
A1. 02 DEMOLITION PLAN - LOWER LEVEL (BASE)
A1. 03 DEMOLITION PLAN - MAIN LEVEL (BASE)
A1. 04 OVERALL FLOOR PLAN - LOWER LEVEL (BASE)
A1. 05 OVERALL FLOOR PLAN - MAIN LEVEL (BASE)
A1. 06 OVERALL FLOOR PLAN - MAIN LEVEL (OPTION)
A1. 07 ENLARGED FLOOR PLANS (BASE)
A1. 08 ENLARGED FLOOR PLANS (OPTION)
A1. 09 FLOOR PATTERN PLAN (BASE)
A1. 10 FLOOR PATTERN PLAN (OPTION)
A1. 11 REFLECTED CEILING PLAN - LOWER LEVEL (BASE)
A1. 12 REFLECTED CEILING PLAN - MAIN LEVEL (BASE)
A1. 13 REFLECTED CEILING PLAN - MAIN LEVEL (OPTION)
A1. 14 ROOF PLAN (BASE)
A1. 15 ROOF PLAN (OPTION)
A2. 01 DEMOLITION ELEVATIONS (BASE)
A2. 02 OVERALL ELEVATIONS (BASE)
A2. 03 OVERALL ELEVATIONS (OPTION)
A2. 04 BUILDING "A" ELEVATIONS (BASE)
A2. 05 BUILDING "B" ELEVATIONS (BASE)
A2. 06 BUILDING "C" ELEVATIONS (OPTION)
A2. 07 BUILDING "D" & "E" ELEVATIONS (BASE)
A2. 08 BUILDING "F" & "G" ELEVATIONS (OPTION)
A3. 01 SITE SECTIONS (BASE)
A3. 02 SITE SECTIONS (BASE)
A3. 03 SITE SECTIONS (OPTION)
A3. 04 BUILDING SECTIONS
A3. 05 BUILDING SECTIONS (OPTION)
A3. 06 WALL SECTIONS
A3. 07 WALL SECTIONS
A3. 08 WALL SECTIONS (OPTION)
A4. 01 ENLARGED TOILET PLANS & ELEVATIONS
A5. 01 WALL BASE DETAILS
A5. 02 ROOF DETAILS
A5. 03 SECTION DETAILS
A5. 04 SECTION DETAILS
A6. 01 OPENING SCHEDULES & TYPES
A6. 02 SHUTTER DETAILS
A6. 03 DOOR DETAILS
A6. 04 DOOR DETAILS
A6. 05 INTERIOR DOOR & WINDOW SILL DETAILS
A6. 06 DOOR SILL DETAILS
A6. 07 WINDOW DETAILS
A6. 08 OPENING DETAILS
A6. 09 GATE AND RAILING DETAILS
A6. 10 GATE AND RAILING DETAILS
A7. 01 INTERIOR ELEVATIONS
A7. 02 CASEWORK DETAILS
A7. 03 CASEWORK DETAILS
Sheet Number Sheet Name
ARCHITECTURAL
G0. 00 COVER SHEET
G0. 01 PROJECT INFORMATION & INDEX
G0. 02 GRAPHIC SYMBOLS & ABBREVIATIONS
G0. 03 MOUNTING & CLEARANCE DIAGRAMS
G0. 04 EXISTING FLOOR PLAN - LOWER LEVEL
G0. 05 EXISTING FLOOR PLAN - MAIN LEVEL
G0. 06 EXISTING PLAN - ROOF
G0. 07 CODE REVIEW
G0. 08 ACCESSIBILITY PLAN (BASE BID)
G0. 09 ACCESSIBILITY PLAN (OPTION)
G0. 10 LIFE SAFETY PLANS (BASE BID)
G0. 11 LIFE SAFETY PLANS (OPTION)
GENERAL
DRAWING INDEX
CIVIL
C1. 01 PROJECT NOTES
C1. 02 PROJECT NOTES
C1. 03 EXISTING CONDITIONS
C2. 00 STAGING PLAN
C2. 01 DEMOLITION PLAN BASE BID
C2. 02 DEMOLITION PLAN - BID OPTION
C2. 03 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1
C2. 04 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2
C2. 05 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 - BID OPTION
C2. 06 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 - BID OPTION
C2. 07 EROSION AND SEDIMENT CONTROL DETAILS 1
C2. 08 EROSION AND SEDIMENT CONTROL DETAILS 2
C2. 09 EROSION AND SEDIMENT CONTROL DETAILS 3
C3. 00 OVERALL SITE PLAN
C3. 01 SITE ENLARGEMENT - BASE BID
C3. 02 SITE DIMENSION PLAN - BASE BID
C3. 03 SITE PLAN ENLARGEMENT - BID OPTION C
C3. 04 SITE PLAN - BID OPTIONS D, E, & F
C3. 05 SITE DIMENSION PLAN - BID OPTIONS D, E, & F
C3. 06 SITE DIMENSION ENLARGEMENT
C3. 07 SITE DETAILS 1
C3. 08 SITE DETAILS 2
C3. 09 SITE DETAILS 3
C3. 10 SITE DETAILS 4
C3. 11 SITE DETAILS 5
C3. 12 SITE DETAILS 6
C4. 01 GRADING AND DRAINAGE PLAN 1
C4. 02 GRADING AND DRAINAGE PLAN 2
C4. 03 GRADING AND DRAINAGE PLAN - BID OPTION
C4. 04 DRAINAGE PROFILES
C4. 05 DRIVEWAY PROFILE - BID OPTION E
C4. 06 DRAINAGE DETAILS 1
C4. 07 DRAINAGE DETAILS 2
C5. 01 UTILITY PLAN
C5. 02 UTILITY PROFILE 1
C5. 03 UTILITY PROFILE 2
C5. 04 UTILITY DETAILS 1
C5. 05 UTILITY DETAILS 2
C5. 06 UTILITY DETAILS 3
S0. 01 GENERAL NOTES
S1. 0 SLAB PLAN
S1. 0A SLAB PLAN DETAIL AREA B
S1. 0B SLAB PLAN DETAIL C
S1. 0C SLAB PLAN BLDGS. E & D
S1. 1 ROOF PLAN
S1. 1A ROOF PLAN DETAIL - BUILDING A
S1. 1B ROOF PLAN DETAIL - AREA B
S1. 1C ROOF PLAN DETAIL - BUILDINGS D & E
S1. 2 CONCRETE REPAIR PLAN
S1. 3 CONCRETE REPAIR PLAN DETAIL
S1. 4 BALCONY REPAIR PLAN
S2. 1 FOUNDATION / SLAB DETAILS
S2. 2 FOUNDATION / SLAB DETAILS
S2. 3 COURTYARD WALL PLAN DETAIL
S2. 4 FOUNDATION / SLAB DETAILS
S3. 1 ROOF FRAMING DETAILS
S3. 2 ROOF FRAMING DETAILS
S3. 3 ROOF FRAMING DETAILS
S3. 4 ROOF FRAMING DETAILS
S3. 5 ROOF FRAMING DETAILS
S5. 1 MASONRY DETAILS
S5. 2 CONCRETE WALL & COLUMN DETAILS
STRUCTURAL
Sheet Number Sheet Name
M0. 01 MECHANICAL NOTES & LEGENDS
M0. 02 MECHANICAL SCHEDULES
M0. 03 MECHANICAL DETAILS
M0. 04 MECHANICAL DETAILS
M1. 01 LOWER LEVEL MECHANICAL PLAN
M1. 02 MAIN LEVEL MECHANICAL PLAN
MECHANICAL
P0. 01 PLUMBING NOTES & LEGENDS
P0. 02 PLUMBING SCHEDULES
P0. 03 PLUMBING DETAILS
P1. 01 LOWER LEVEL DOMESTIC WATER PLAN
P1. 02 MAIN LEVEL DOMESTIC WATER PLAN
P1. 03 LOWER LEVEL SANITARY & VENT PLAN
P1. 04 MAIN LEVEL SANITARY & VENT PLAN
PLUMBING
E0. 01 ELECTRICAL NOTES & LEGENDS
E0. 02 ELECTRICAL LIGHTING CONTROL DETAILS
E0. 03 ELECTRICAL LIGHTING FIXTURE SCHEDULE
E0. 04 ELECTRICAL SCHEDULES AND DETAILS
E0. 05 ELECTRICAL SCHEDULES AND DETAILS
E0. 06 ELECTRICAL SCHEDULES AND DETAILS
E0. 07 ELECTRICAL SCHEDULES AND DETAILS
E0. 08 TELECOMMUNICATIONS RISER DIAGRAM
E0. 09 ELECTRICAL DETAILS
E0. 10 ELECTRICALGROUNDING DETAIL
E0. 11 ELECTRICAL RISER DIAGRAM - BASE BID
E0. 12 ELECTRICAL RISER DIAGRAM - BID OPTION A
E0. 13 ELECTRICAL PC MOUNTING DETAILS
E0. 14 LIGHTING PROTECTION DETAILS
E1.01 LOWER LEVEL ELECTRICAL DEMOLITION PLAN
E1. 02 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
E1. 03 ELECTRICAL SITE PLAN
E2. 01 LOWER LEVEL POWER & TELECOM PLAN
E2. 02 FIRST FLOOR POWER & TELECOM PLAN
E2. 03 ROOF POWER & TELECOM PLAN
E3. 01 LOWER LEVEL LIGHTING PLAN
E3. 02 FIRST FLOOR LIGHTING PLAN
E4. 01 LOWER LEVEL SYSTEMS PLAN
E4. 02 FIRST FLOOR SYSTEMS PLAN
ELECTRICAL
Sheet Number Sheet Name
L1. 00 LANDSCAPE PLAN
L1. 01 LANDSCAPE ENLARGEMENT PLAN - BASE & BID OPTION A
L1. 02 LANDSCAPE ENLARGEMENT PLAN - BID OPTION B & C
L1. 03 LANDSCAPE NOTES AND SCHEDULE
L1. 04 LANDSCAPE DETAILS
LANDSCAPE
ALIGN
INSULATION (LOOSE OR BATT)
METAL
NON-FERROUS ALUMINUM
WOOD (FINISH)
WOOD (CONTINUOUS)
WOOD (BLOCKING)
INTERRUPTED MEMBER
STONE
CONCRETE
ACOUSTICAL TILE
CARPET
PLASTER WITH LATH
GYPSUM BOARD
INSULATION (RIGID)
GLASS (LARGE SCALE)
SAND OR GROUT
BRICK
CONCRETE MASONRY UNIT
PLYWOOD
REVISION REFERENCE
DESCRIPTION OF SIMILAR OR OPPOSITE
SHEET WHERE SHOWN
AREA TO BE DETAILED
SHEET WHERE SHOWN
DETAIL NUMBER
ELEVATION DESIGNATION
XX
W.9
W.9
COLUMN GRIDS
ROOM
NAME
999999
ROOM NAME
DOOR TAGS
WINDOW TAG
CALLOUT
REFERENCE
SECTION
REFERENCE
Ref label
AXXX
SIM
XX
AXXX
XXX
XX
XXX
DOOR NUMBER
CONSTRUCTION
ELEVATION
REFERENCE
SHEET WHERE SHOWN
SECTION DESIGNATION
DESCRIPTION OF SIMILAR OR OPPOSITE
WINDOW TYPE
NOTES &
SYMBOLS
SHEET NOTE
MODIFIED AREA
DRAWING TITLE
MILLWORK
MILLWORK
MILLWORK TAG
FNXXX
CWXXX
FURNITURE TYPE
ROOM TAG
ROOM NUMBER
AREA
COLUMN GRID LINE
GRID REFERENCE NUMBER
ALIGN WITH ESTABLISHED
SURFACES
FURNITURE TAG
FINISH
LEVEL MARKER
LEVEL IDENTIFICATION
FLOOR ELEVATION
X1
CENTERLINE
X1
FINISH
WALL FINISH
TAGS
FLOOR FINISH
TAG
FLOOR FINISH
TRANSITION
XX-01
XX-01 FINISH EXTENTS
WALL BASE FINISH
WALL FINISH
FINISH EXTENTS
WALL FINISH
ELEVATION FINISH
TAG FINISH
MILLWORK ABOVE
DRAWING NUMBER
DRAWING TITLE
SCALE
GRAPHIC SYMBOLS
SECTION INDICATIONS
X
BUILDING
ASSEMBLY
ASSEMBLY
DESIGNATION
XX
TOILET ACCESSORY
TYPEACCESSORY TAGS
WALL / ROOF / SLAB
CONSTRUCTION
SHEET WHERE SHOWN
CURTAINWALL /
STOREFRONT
TAG
CURTAINWALL /
STOREFRONT
TAG
XXX
SCALE:
A102 A101 1/8" = 1'-0" View Name
XXX.XXX
SIM
INTERIOR
ELEVATION
REFERENCE
X
XXXXX
SHEET NUMBER
INTERIOR ELEVATION DESIGNATION
ABREVIATIONS
A
ACCES ACCESSORY
ACOUS ACOUSTIC(AL)
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
ALT ALTERNATE
ALUM ALUMINUM
ANNUNC ANNUNCIATOR
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPL APPLIANCE
ARCH ARCHITECT(URAL)
AUTO AUTOMATIC
AVG AVERAGE
& AND
@ AT
B
BLDG BUILDING
BOLLD BOLLARD
BD BOARD
BLKG BLOCKING
B.O. BOTTOM OF
BRDLM BROADLOOM
BU BUILT UP
C
CAB CABINET
CPT CARPET
CEM CEMENT(ITIOUS)
CER CERAMIC
CI CONTRACTOR INSTALLED
CLG CEILING
COATG COATING
COILG COILING
CONC CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS(ATION)
CONTR CONTRACT(OR)
COV COVER
CMU CONCRETE MASONRY UNIT
CPT CARPET
CS CONTRACTOR SUPPLIED
CT CERAMIC TILE
D
D DEPTH
DBL DOUBLE
DEPT DEPARTMENT
DES DESIGN(ED)
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DSCON DISCONNECT
DWGS DRAWINGS
DWR DRAWER
E
EA EACH
ELAST ELASTOMERIC
ELEC ELECTRICAL
EMBED EMBEDD(ED)(ING)
ENGR ENGINEER(ED)
ENTR ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP JT EXPANSION JOINT
EXPS EXPOSE(D)
EXT EXTERIOR
F
FAB FABRICATION
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FHV FIRE HOSE VALVE
FIN FINISH
FLDG FOLDING
FPLC FIREPLACE
FRT FIRE RETARDANT TREATED
FRMG FRAMING
FLR FLOOR(ING)
FURN FURNITURE
FRP FIBERGLASS REINFORCED PLASTIC
FWC FABRIC WALL COVERING
FWP FABRIC WRAPPED PANEL
FXD FIXED
FXTR FIXTURE
R
RDR READER
RECES RECESSED
RECPT RECEPTACLE
REF REFER(ENCE)
REFL REFLECTED
REFR REFRIGERATOR
REQD REQUIRED
RESIS RESIST(ANT)(IVE)
REINF REINFORCE(D)(ING)(MENT)
RESIL RESILIENT
REV REVISION
RFG ROOFING
RM ROOM
RO ROUGH OPENING
S
SCR SCRIBE
SECUR SECURITY
SF SQUARE FEET
SGL SINGLE
SHORG SHORING
SIM SIMILAR
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STRFR STOREFRONT
STRUCT STRUCTURAL
SURF SURFACE
SYS SYSTEM(S)
SYM SYMETRICAL
SUSP SUSPENDED
T
TBB TOP OF BOND BEAM
TEMP TEMPORARY
THK THICK
TLT TOILET
T.O. TOP OF
TRAF TRAFFIC
TRANS TRANSPARENT
TRTD TREATED
T&G TONGUE AND GROOVE
TYP TYPICAL
U
UNDRLAY UNDERLAYMENT
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VEH VEHICLE
VERT VERTICAL
VIF VERIFY IN FIELD
W
W/ WITH
W WIDTH
WC WATER CLOSET
WD WOOD
WDW WINDOW
W/O WITHOUT
WS WATER STOP
WT WEIGHT
WTRPRF WATERPROOFING
G
GA GAUGE
GALV GALVANIZED
GIR GIRDER
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GFRP GLASS FIBER REINFORCED PLASTER
GL GLASS
GR GRAD(E)(ING)
GRD BM GRADE BEAM
GYP GYPSUM
GYP BD GYPSUM BOARD
H
H HIGH
H/C HANDICAPPED
HD HEAD
HDWD HARDWOOD
HDWE HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
I
INFO INFORMATION
INSTRUM INSTRUMENT(ATION)
INSUL INSULATION
INTLK INTERLOCK(ING)
INT INTERIOR
INFILTR INFILTRATION
J
JAN JANITOR
JT JOINT
K
KIT KITCHEN
L
LAV LAVATORY
LB POUND
LT LIGHT
LVLG LEVELING
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT'L MATERIAL
MAX MAXIMUM
MDF MEDIUM DENSITY FIBERBOARD
MFD MANUFACTURED
MFR MANUFACTURER
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MIN MINIMUM
MISC MISCELLANEOUS
MLWK MILLWORK
MOIST MOISTURE
MOT MOTOR(IZED)
MTD MOUNTED
MTL METAL
N
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OH OPPOSITE HAND
OI OWNER INSTALLED
OPNG OPENING(S)
OPP OPPOSITE
OPR OPERABLE
ORNA ORNAMENTAL
OS OWNER SUPPLIED
OVFL OVERFLOW
OVHD OVERHEAD
P
PTN PARTITION
PEDTR PEDESTRIAN
PBD PARTICLE BOARD
PNL PANEL
POLYST POLYSTYRENE
PORT PORTABLE
PREFIN PREFINISHED
PREFAB PREFABRICATED
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLSTC PLASTIC
PLYWD PLYWOOD
PRTECN PROTECTION
PT PAINT
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
251127
170432
1698/
/2
:5 0:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
GRAPHIC SYMBOLS &
ABBREVIATIONS
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
TO
P
O F
R
IM
B O
TT
O
M O
F R
EF
LE
C
TI
N G
SU
R
FA
C E
MI
RR
OR
TO
P
O F
C O
N
TR
O L
SO
AP
DI
SP
EN
SE
R
W
AT
ER
C
LO
SE
T
TO
P
O F
SE
AT
TO
P
O F
SE
AT
AC
CE
SS
IB
LE
W
AT
ER
C
LO
SE
T
FL
U
SH
C
O N
TR
O
L 4"
B
EL
O W
G
AB
B
AR
. O R
IE
N
T
FL
U
SH
V
AL
VE
T
O
O
PE
N S
ID
E
O F
TO
IL
ET
S
TA
LL
TO
P
O F
O
PE
N
IN
G
NA
PK
IN
D
IS
PO
SA
L
W
AS
TE
RE
CE
PT
AC
LE
TO
P O
F O
PE
N
IN
G
" M
AX
B O
TT
O
M O
F R
EF
LE
C
TI
N G
S U
R
FA
C E
" M
AX
" M
AX
SE
E
RE
AC
H
RA
NG
ES
TO
ILE
T
PA
PE
R
DI
SP
EN
SE
R
AL
IG
N
W / T
OP
O
F
W
AL
L
MT
D.
LA
VA
TO
RY
(A
DU
LT
" T
O
TO
P
" T
O
TO
P
42" MIN.
12" MAX.
54" MIN.
" M
IN
38" MAX.
AC
CE
SS
IB
W
AT
ER
C
LO
SE
T
41" MAX.
" M
IN
" M
IN
VERTICAL GRAB
BAR
18" MAX.
16" MIN.
24" MIN. 12" MIN.
36" MIN.
AC
CE
SI
BL
E
CL
EA
R
FL
OO
R
SP
AC
E
68" MIN.
" M
IN
" M
IN
" M
IN
16" MIN. 36" MIN. 16" MIN.
8" MIN.
8" M
IN
AC
CE
SS
IB
LE
C
IR
UL
AR
A
ND
T-
SH
AP
ED
TU
RN
IN
G
SP
AC
ES
48" MIN.
" M
IN
KNEE & TOE CLEARANCE
" M
IN
18" MIN.
FRONT APPROACH - PULL SIDE
OP
TI
ON
2:
" M
IN
OP
TI
ON
1:
0"
M
IN
OPTION 2: 42" MIN.
OPTION 1: 36" MIN.
HINGE APPROACH - PULL SIDE
FRONT APPROACH - PUSH SIDE HINGE APPROACH - PUSH SIDE
" M
IN
" M
IN
TO
P
O F
R
EF
LE
C
TI
N
G
FA
C
E
FU
LL
NG
TH
MI
RR
OR
" M
IN
TO
P
O F
H O
O K
RO
BE
H
OO
K
SE
E
RE
AC
H
RA
NG
ES
BA
BY
C
HA
NG
IN
G
ST
AT
IO
N
TO
P O
F W
O
K
FA
C
E
" M
IN
" M
AX
MOUNTING DIAGRAMS
CLEARANCE DIAGRAMS
67" MINIMUM
MA
X.
ALLOWABLE ENCROACH
OTHER FIXTURES NOT
ALLOWED WITHIN THIS
AREA
FR
O M
F
IN
IS
H
FA
CE
O F
W
AL
L
" M
IN
FROM FINISH FACE OF WALL
60" MIN
16" - 18"
30" CLEAR MIN.
" C
LE
AR
M
IN
ACCESSIBLE WATER CLOSET AND LAVATORY
AF
F
" M
IN
RE
AC
H
RA
NG
E
UN
OB
ST
RU
CT
ED
" M
AX
. A
FF
AF
F
" M
IN
RE
AC
H
RA
NG
E
UN
OB
ST
RU
CT
ED
" M
AX
. A
FF
OB
ST
RU
CT
ED
H
IG
H
RE
AC
H
RA
NG
E
" M
AX
OB
ST
RU
CT
ED
H
IG
H
RE
AC
H
RA
NG
E
" M
AX
" M
AX
(ONLY W/ CLOSER &
LATCH, OTHERWISE 0")
BEYOND HINGE
22" MIN.
LATCH APPROACH - PULL SIDE
" M
IN
24" MIN.
LATCH APPROACH - PUSH SIDE
24" MIN. 42
" M
IN
+6 " W
/ C
LO
SE
R
+6 " W
/ C
LO
SE
R
+6 " W
/ C
LO
SE
R
< 2 7"
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
1698/
/2
:5 0:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
MOUNTING & CLEARANCE
DIAGRAMS
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
1. REFERENCE ANSI ICC A117.1-2017 AND ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS (ABBAS).
2. MAXIMUM DIMENSIONS FOR SINK SHALL BE TO THE TOP EDGE OF SINK.
3. PROVIDE FIRE RETARDANT TREATED WOOD BLOCKING IN WALLS FOR
ACCESSORIES.
6 7
A
D
CISTERN
CISTERN
CISTERN
SUPERVISOR
ROOM
STORAGE
ACCESS HATCH ABOVE
OUTLINE OF BALCONY ABOVE
OPENING 45" X 95"; 8" AFF
CRAWLSPACE ACCESS
STORAGE
BATHROOM
OUTLINE OF BALCONY
ABOVE
OUTLINE OF BALCONY ABOVE
SIDEWALK
OUTLINE OF BALCONY
STRUCTURAL RIBS ABOVE
38" X 80" DOOR OPENING
OPENING 13" X 13" @ 18" AFF
OUTLINE OF BALCONY ABOVE
1 2 3 4 5
G
B
C
APARTMENT
STORAGE
PARTIAL HEIGHT WALL
DS
DS
DS
KEY PLAN
A
B C
D
E
H
I
F
G
PARTITIONS
BELOW GRADE
SYMBOLS
LEGEND
EXISTING PARTITION PER BUILDING
ASSEMBLIES
CONSTRUCTION ABOVE
ARCHWAY ABOVE
REGIONS
DOWNSPOUTDS
HOSEBIBBHB
2 40 16
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
1/8" = 1'-0"
8/
/2
:5 0:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
EXISTING FLOOR PLAN -
LOWER LEVEL
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
SCALE: 1/8" = 1'-0"G0. 04
EXISTING FLOOR PLAN - LOWER LEVEL1
1. EXISTING DRAWINGS FOR REFERENCE ONLY.
2. GC TO FIELD VERIFY ALL EXISTING CONDITIONS DIMENSIONS.
3. ALL EXISTING OPENINGS, WINDOWS, AND DOORS HAVE WOOD
SHUTTERS.
UP
W.I.C.
LAUNDRY
BATHROOM STOR.
TERRACE
OFFICE
BATHROOM
DINING & KITCHEN
LIVING AREA
STORAGE
OPEN TERRACE
OBSERVATION
TOWER
WATER
HEATER
BEDROOM
BEDROOM
MASTER
BATHROOM
MASTER
BEDROOM
LIVING ROOM
BATHTUB
W.I.C.
6 7
A
D
KITCHEN
PANTRY &
STORAGE
HALLWAY
HALLWAY
HALLWAY
DINING AREA
UTILITY SINK
WATER HEATER
UNDER CABINET
DUTCH DOOR
W/ ARCH
TRANSOM
REF.
SIDEWALK
SIDEWALK
LAWN
LAWN
LAWN
BALCONY
BALCONY
BALCONY
TERRACE
RETAINING WALL
RETAINING WALL BELOW
VEGETATION BED BELOW
ALL OPENINGS HAVE
WOOD SHUTTERS
ON METAL STRAP
HINGES, TYP.
ROOF OVERHANG ABOVE;
1'-6" OFFSET
DRIVEWAY / PARKING;
SEE CIVL
VEGETATION
BED
VEGETATION
BED
1 2 3 4 5
G
B
C
6" CURB SURROUNDING
PLANT BEDS AND PARKING
VEGETATION
BED VEGETATION
BED
HBHB
DS DS
DS
DS
DS
DS
DS
KEY PLAN
A
B C
D
E
H
I
F
G
PARTITIONS
BELOW GRADE
SYMBOLS
LEGEND
EXISTING PARTITION PER BUILDING
ASSEMBLIES
CONSTRUCTION ABOVE
ARCHWAY ABOVE
REGIONS
DOWNSPOUTDS
HOSEBIBBHB
2 40 16
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
1/8" = 1'-0"
8/
/2
:5 1:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
EXISTING FLOOR PLAN -
MAIN LEVEL
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
SCALE: 1/8" = 1'-0"G0. 05
EXISTING FLOOR PLAN - MAIN LEVEL1
1. EXISTING DRAWINGS FOR REFERENCE ONLY.
2. GC TO FIELD VERIFY ALL EXISTING CONDITIONS DIMENSIONS.
DS DS
DS
DS
DS
DS
KEY PLAN
A
B C
D
E
H
I
F
G
LEGEND
CLAY SHINGLE ROOF
DS DOWNSPOUT
ROOFS
SYMBOLS
2 40 16
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
1/8" = 1'-0"
8/
/2
:5 1:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
EXISTING PLAN - ROOF
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
SCALE: 1/8" = 1'-0"G0. 06
EXISTING PLAN - ROOF1
1. EXISTING DRAWINGS FOR REFERENCE ONLY.
2. GC TO FIELD VERIFY ALL EXISTING CONDITIONS DIMENSIONS.
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
251127
170432
1698/
/2
:5 1:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
CODE REVIEW
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
CODE ANALYSIS
2018 International Existing Building Code (IEBC) 2018 International Building Code (IBC) 2018 International Energy Conservation Code (IECC)
2017 ANSI / ICC 117.1 (ANSI)
Architectural Barriers Act Accessibility Standards (ABAAS)
Online Reference:
https://codes.iccsafe.org/codes/i-codes https://www.access-board.gov/aba/
SCOPE NARRATIVE:
This project is a rehabilitation of the existing Visitor Contact Station (VCS) at Salt River Bay National Historical Park (SARI).
The VCS was substantially damaged by Hurricanes Maria in 2017 and has been inoperative since the storm.The scope of this project includes repairs and alterations to the existing building to meet current code requirements. All of the existing construction on the upper level (including walls, roof, all equipment, fixtures, etc.) is proposed to be demolished to the exisitng floor slab. The lower level exterior walls will remain and any cracks will be repaired. The existing cisterns will remain and will be reused for rainwater capture to support the rehabilitated plumbing system. The interior partitions of the lower level rooms will be demolished and existing plumbing and electrical devices will be capped or covered and abandoned in place.
Enclosed portions of the VCS will be reconstructed in the same location with reinforced masonry walls above existing foundations; these areas are noted as A, E, F, and G in the keyplan diagram. Areas B, C, and D, will be rebuilt in the same location as an open air pavilion. In areas where structural slabs span above the lower level (B, C, D, and E), the existing slabs will be strengthened with a reinforced gunite / shotcrete slab on the underside. The roof structure will be rebuilt with heavy timber joists and trusses, 2x treated wood decking, and plywood sheathing to meet structural requirements.
New mechanical systems will be provided in areas A, E, and F. New electrical, data, and IT systems will be provided throughout. A photovoltaic array is proposed for on-site power generation, with a 6 hour battery backup. The plumbing system will be reconfigured and new fixtures will be provided. Rainwater will be collected and piped into a potable water cistern;
additional stormwater collected from open air exhibit areas and the internal courtyard will be piped to a non-potable water cistern. Potable water will be used at sinks, collected, treated, and piped to the non-potable greywater cisterns. Non-potable greywater will be used to flush toilets. A new septic system will be provided for on-site sewage disposal.
This project will utilize the Prescriptive Compliance Method to satisfy the requirements of the IEBC. All reconstructed portions of the structure will comply with requirements for new construction under the 2018 IBC. All work on the lower level of the structure will be limited to minor repairs and maintenance.
2018 IEBC NOTES:
301.3.1 Prescriptive Compliance Method – Alterations, additions, and changes of occupancy complying with Chapter 5 of this code in buildings complying with the International Fire Code, shall be considered in compliance with the provisions of this code.
301.5 Compliance with Accessibility – Accessibility requirements for existing buildings shall comply with the 2009 edition of
ICC A117.1
Note – project is also subject to requirements of ABAAS. Where difference in requirement occurs, the most restrictive requirement has been applied.
302.3 Additional Codes – Alterations, repairs, additions, and changes of occupancy to existing buildings shall comply with applicable provisions of the International Energy Conservation Code, International Fire Code, International Plumbing Code, International Private Sewage Disposal Code, and NFPA 70. Where Provisions of the other codes conflict with provisions of this code, the provisions of this code shall take precedence.
302.4 Existing Materials – Materials already in use in a building in compliance with requirements or approvals in effect at the time of their erection or installation shall be permitted to remain in use unless determined by the building official to be unsafe.
302.5 New and replacement Materials – Except as otherwise required or permitted by this code, materials permitted by the applicable code for new construction shall be used. Like materials shall be permitted for repairs and alterations provided that unsafe conditions are not created.
302.6 Occupancy and Use – the occupancy and use of a building shall be determined in accordance with Chapter 3 of the International Building Code.
305.6 Accessibility of Alterations – A facility that is altered shall comply with the applicable provisions in Chapter 11 of the International Building Code, unless technically infeasible.
Exceptions:
1. The altered element or space is not required to be on an accessible route
2. Accessible means of egress required by Chapter 10 of the IBC are not required to be provided in exisitng facilities
305.7 Alterations affecting an area containing a primary function – Where an alteration affects the accessibility to, or contains an area of primary function, the route to the primary function area shall be accessible. The accessible route to the primary function area shall include toilet facilities and drinking fountains serving the area of primary function.
402.1 Repairs: Glazing in Hazardous Location – replacement glazing in hazardous locations shall comply with the safety glazing requirements of the IBC.
503.1 Prescriptive Compliance for Alterations – Except as provided by Section 302.4, 302.5 or this section, alterations to any building or structure shall comply with the requirements of the International Building Code for new construction. Alterations shall be such that the existing building or structure is not less complying with the provisions of the IBC than the existing building or structure was prior to the alteration.
2018 IBC NOTES:
302.1 Occupancy Classification
Primary: Assembly (A-3) (Most Restrictive) Business Educational Storage (S-2)
Table 504.3 Allowable Building Height = Occupancy A / B / E, Non-Sprinklered, Type IIIB = 55 feet
Actual building height = 16’ (Complies)
Table 504.4 Allowable Number of Stories Above Grade Plane = Occupancy A / B / E, Non-Sprinklered, Type IIIB = 2 Stories Actual number of stories = 2 (Complies
Table 506.2 Allowable area = Occupancy A-3 Non-Sprinklered, Type IIIB = 9,500 SF Actual area = 5,365 SF (gross) (Complies)
508.3.1 Non-separated occupancy classification – nonseparated occupancies shall be individually classified in accordance with Section 302.1. The requirements of this code shall apply to each portion of the building based on the occupancy of that space. In addition, the most restrictive provisions of Chapter 9 that apply to the non-separated occupancies shall apply to the total non-separated occupancy area.
2018 IBC NOTES (CONTINUED):
Table 509 Incidental Use separation – Stationary storage battery systems having an energy capacity greater than the threshold quantity specified in Table 1206.2 of the IFC shall provide 2 hour separation / protection in Group A occupancy.
Note – 2 HR fire separation to be provided at PV storage battery enclosure if batteries are included in final project scope.
Table 601 Fire Resistance Rating Requirements for Building Elements:
Type IIIB Construction:
Primary structural frame: 0 Exterior Bearing Walls: 2
See Exception from Table 602 Interior Bearing walls: 0 Nonbearing Exterior walls: 0 Nonbearing Interior walls: 0
Table 602 Fire Separation Distance: If separation distance > or = 30 feet no rating of exterior walls required for Group A
705.3 Buildings on the same lot – Exception 1: Two or more buildings on the same lot shall either be regulated as separate buildings or shall be considered as portions of one building if the aggregate area of such buildings is within the limits specified in Chapter 5 for a single building. Where the buildings contain different occupancy groups or are of different types of construction, the area shall be that allowed for the most restrictive occupancy or construction.
Table 705.8 Maximum area of exterior wall openings Building to be unsprinklered, with no opening protections Where fire separation distance > 30 feet, there is no limit
705.8.5 Vertical Separation of Openings – Openings in exterior walls in adjacent stories shall be separated vertically by 5 feet or more. Exception 1 – separation not required in buildings less than 3 stories.
720.2 Concealed Installation – insulating materials, where installed in buildings of any type of construction, shall have a flame spread index of not more than 25 and a smoke-developed index of not more than 450.
803.13 Interior Finish Requirements based on Occupancy:
Occupancy Group A-3, nonsprinklered =
Class A for Interior Exit Stairways / ramps, exit passage ways, corridors, and enclosures for exit access stairways and ramps Class C for Rooms and Enclosed Spaces
903.2.1.3 Group A-3 – An automatic sprinkler system is required where one of the following conditions exist:
1. The fire area exceeds 12,000 SF
2. Actual area <12,000 SF
3. The fire area has an occupant load of more than 300
4. Actual occupant load <300
5. The fire area is located on a floor other than the level of exit discharge serving such occupancies
6. Does not apply; discharge is located on level of fire area NOTE – No Automatic sprinkler system is required or provided
907.2.1 Fire Alarm in Group A Occupancy – Fire alarm not required where occupancy < 300 people and occupant load is no more than 100 persons above or below the lowest level of exit discharge.
A fire Alarm system will be provided at NPS request.
918.1 Radio Coverage – Emergency responder radio coverage shall be provided in all new buildings in accordance with section 510 of the International Fire Code.
Table 1004.5 Maximum Floor Area per Occupant:
Assembly (exhibit gallery and museum) = 30 net = 145 occupants Assembly = 15 net = 33 occupants Business Areas = 150 Gross = 12 occupants Accessory Storage Areas, Mechanical Equipment Room = 300 Gross = 6 occupants Total = 196
1004.7 Outdoor Areas – Yards, patios, courts and similar outdoor areas accessible to and usable by the building occupants shall be provided with means of egress and the occupant load shall be assigned in accordance with the anticipated use.
Outdoor terrace areas to be calculated at 30 net as part of primary Assembly exhibit area occupancy.
1004.9 Posting of Occupant Load – Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place near the main exit from the space.
1005.3.2 Required Capacity Based on Occupant Load =
.3” / Occupant for stairways .2” / Occupant for other egress components
Table 1006.2.1 – Spaces with one exit Group A / E = if >49 occupants, 2 exits are required Group B = if >49 occupants, 2 exits are required Common Path of Travel for Unsprinklered Building =
Group A / E: where <30 occupants = 75 feet Group A / E / B: where >30 occupants = 75 feet Group B: where <30 occupants = 100 feet
1007.1 Two Exits or exit access doorways – where two exits are required from any portion of the exit access, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the building or area to be served measured in a straight line between them.
1009.1 Accessible means of egress – Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress is required by Section 1006.2 or 1006.3 from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress.
1010.1.2.1 Direction of swing – Pivot or side hinged swinging doors/gates shall swing in the direction of egress where serving a room or area containing an occupant load of 50 or more.
2018 IBC NOTES (CONTINUED):
1010.2 Gates – Gates serving the means of egress system shall conform to the applicable requirements for doors
1015.6 Mechanical Equipment, systems, and devices – Exception: Guards are not required where personal fall arrest anchorage connector devices that comply with ANSI/ASSE Z 359.1 are installed.
Table 1017.2 Exit Access Travel Distance Group A / E / B occupancy without sprinkler system = 200 feet
1020.4 Dead ends – where more than one exit or exit access doorway is required, dead end corridors shall not exceed 20 feet.
1029.2 Assembly Main Exit – no main exit required as occupant load is less than 300.
1103.2.9 Equipment Spaces – Spaces frequented only by service personnel for maintenance, repair, or occasional monitoring of equipment are not required to be accessible.
1104 – Accessible route to be provided from parking are to all areas of facility
1106 – Accessible parking Where < 50 spaces provided, 2 accessible space required, 1 of which will be van accessible
1109.2.1 Family or assisted used toilet and bathing rooms – In assembly occupancies an accessible family or assisted use toilet room shall be provided where an aggregate of six or more male and female water closets is required.
Required number of fixtures = 3; no family / assisted toilet required.
2406.4.1 Safety Glazing – to be provided at windows and doors as required
2902 Minimum Plumbing Facilities Calculated Occupancy = 196 occupants = 98 Men / 98 Women Assembly (A-3) Requirements =
Water Closets = Men = 1 / 125 = 1 required Women = 1 / 65 = 2 required
Lavatories Men = 1 / 200 = 1 required Women = 1 / 200 = 1 required
Showers – Not Required Drinking Fountains
1 /500 Occupants = 1 required; note – accessible bottled water dispenser to be provided inside office / VCS to satisfy requirement.
Service Sink – 1 required
2018 IECC NOTES:
Table C301.1 Climate Zones – US Virgin Islands is Climate zone 1, Hot-Humid
C402.1 Prescriptive Building Envelope Requirements Roofs
Attic Insulation = R38 Walls (above grade)
Mass = R5.7 ci Walls (below grade) = no requirement Floors = no requirement Slab on grade floors
Unheated slabs = no requirement Opaque Doors
Nonswinging = R4.75
C402.4 Prescriptive Fenestration Requirements (Zone 1) Vertical Fenestration U Factor Requirements
Fixed fenestration = 0.50 Operable Fenestration = 0.65 Entrance Doors = 1.10
Solar Heat Gain Coefficient Projection Factor (PF) <.2 = 0.25 (SEW) or 0.33 (N)
0.2 </= PF < 0.5 = 0.30 (SEW) or 0.37 (N) PF >/= 0.5 = 0.4 (SEW or N)
C402.4.1 Maximum area – Maximum area of fenestration, not including opaque doors and opaque spandrel panels, shall not be greater than 30% of the gross above grade wall area.
C402.5.1 Air Barriers – A continuous air barrier shall be provided
C402.5.1.2.1 Air Barrier Materials – Cast in place concrete, or fully grouted masonry, or a Portland cement parge, or gypsum plaster having a thickness of not less than 5/8” shall satisfy the requirements for a continuous air barrier. Concrete masonry walls coated with either one coat of block sealer or two applications of a paint or sealer coating shall also satisfy requirements.
C402.5.7 Vestibules – Vestibules are not required in Climate Zone 1
C403 – Natural Ventilation – to be provided through operable fenestration
C503.1 Existing Buildings – Alterations shall comply with the requirements of Section C503 and the code for new construction. Alterations to an existing building, building system, or portion thereof shall conform to the provisions of this code as those provisions relate to new construction without requiring the unaltered portions of the exisitng building or building system to comply with this code.
6'6'
A
D
1 2 3 4 5
G
B
C
FEC
EXIT GATE WITH SIGNAGE
CLEAR WIDTH = 3'-10"
DOOR CAPACITY = 230
LOAD = 111
EXIT GATE WITH SIGNAGE
CLEAR WIDTH = 3'-10"
DOOR CAPACITY = 230
LOAD = 111
ACCESSIBLE PARK
ACCESSIBLE PARK
ACCESSIBLE WALK
SL
O
PE
CLASSROOM
PAVILION
INTERPRETIVE
GALLERY
VISITOR
CONTACT
STATION
BREAK
AREA
STORAGE
JANITOR
MEN RR
WOMEN RR
FAMILY RR
STAIR & HANDRAIL - SEE
CIVIL DRAWINGS
TURN DOWN WALK.
SEE CIVIL DRAWINGS
FOR EXTENTS
FEC
RAMP AND HANDRAIL.
SEE NOTE 2
AED
DN
1. ALL SLABS AND COURTYARD FINISHES TO COMPLY WITH AMERICAN
CONCRETE INSTITUTE RECOMMENDED SLOPES AND CROSS SLOPES.
2. ACI-117.1R14, 5.8.2.1 SPECIFIED DIMENSIONS FOR DESIGN AND CROSS-SLOPES
REQUIRED MAXIMUMS ARE THE FOLLOWING:
- THE RUNNING SLOPE OF WALKING SURFACES SHALL NOT BE STEEPER
THAN 1:25 (4.0% MAX). THE CROSS SLOPE OF WALKING SURFACES
SHALL NOT BE STEEPER THAN 1:66.6 (1.5% MAX).
- RAMPS RUNS SHALL HAVE A RUNNING SLOPE NOT STEEPER THAN
1:13.3 (7.5% MAX)
- CROSS SLOPES OF RAMP RUNS AND 'LEVEL AREAS' SHALL NOT BE
STEEPER THAN 1:66.6 (1.5% MAX).
3. PROVIDE ABA TRANSITION THRESHOLDS AT AREAS THAT EXCEED THE
ALLOWABLE ELEVATION DIFFERENCE.
4. LOWER LEVEL EXISTING FLOOR FINISHES TO REMAIN
5. FLOOR ACCESS DOOR TO RECEIVE TILE FINISH
6. REFER TO CIVIL DRAWINGS FOR ALL FINISH GRADES
KEY PLAN
A
B C
D
E
H
I
F
LEGEND
ROOM NAME AND
ROOM NUMBER
FEC
FIRE EXTINGUISHER CABINETFIRE SAFETY
EXIT SIGN
FE
FIRE EXTINGUISHER, BRACKET
MOUNTED
SYMBOLS ROOM NAME
ACCESSIBLE PATH
ACCESSIBLE PATH
DOOR / EXIT APPROACH
W
ID
TH
O
F
DO
OR
W
ID
TH
O
F
DO
OR
" M
IN
5' - 0" 4' - 0"
3'
0"
2 40 16
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
1/8" = 1'-0"
8/
/2
:5 1:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
ACCESSIBILITY PLAN (BASE
BID)
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
SCALE:A2. 02 G0. 08 1/8" = 1'-0"
1 ACCESSIBILITY PLAN - MAIN LEVEL (BASE BID)
6'6'
A
D
1 2 3 4 5
G
B
C
FE
EXIT GATE WITH SIGNAGE
CLEAR WIDTH = 3'-10"
DOOR CAPACITY = 230
LOAD = 111
EXIT GATE WITH SIGNAGE
CLEAR WIDTH = 3'-10"
DOOR CAPACITY = 230
LOAD = 111
ACCESSIBLE PARK
ACCESSIBLE PARK
ACCESSIBLE WALK
SL
O
PE
CLASSROOM
FEC
FEC
FEC
FE
CONFERENCE
STORAGE
OFFICE
BREAK
AREA
302JANITOR
STORAGE
VISITOR
CONTACT
STATION
MAINTENANCE
STORAGE
MEN RR
WOMEN RR
FAMILY RR
RAMP AND HANDRAIL.
SEE NOTE 2
INTERPRETIVE
GALLERY
HANDRAIL AND STAIR -
SEE CIVIL DRAWINGS
AED
DN
1. ALL SLABS AND COURTYARD FINISHES TO COMPLY WITH AMERICAN
CONCRETE INSTITUTE RECOMMENDED SLOPES AND CROSS SLOPES.
2. ACI-117.1R14, 5.8.2.1 SPECIFIED DIMENSIONS FOR DESIGN AND CROSS-SLOPES
REQUIRED MAXIMUMS ARE THE FOLLOWING:
- THE RUNNING SLOPE OF WALKING SURFACES SHALL NOT BE STEEPER
THAN 1:25 (4.0% MAX). THE CROSS SLOPE OF WALKING SURFACES
SHALL NOT BE STEEPER THAN 1:66.6 (1.5% MAX).
- RAMPS RUNS SHALL HAVE A RUNNING SLOPE NOT STEEPER THAN
1:13.3 (7.5% MAX)
- CROSS SLOPES OF RAMP RUNS AND 'LEVEL AREAS' SHALL NOT BE
STEEPER THAN 1:66.6 (1.5% MAX).
3. PROVIDE ABA TRANSITION THRESHOLDS AT AREAS THAT EXCEED THE
ALLOWABLE ELEVATION DIFFERENCE.
4. LOWER LEVEL EXISTING FLOOR FINISHES TO REMAIN
5. FLOOR ACCESS DOOR TO RECEIVE TILE FINISH
6. REFER TO CIVIL DRAWINGS FOR ALL FINISH GRADES
LEGEND
ROOM NAME AND
ROOM NUMBER
FEC
FIRE EXTINGUISHER CABINETFIRE SAFETY
EXIT SIGN
FE
FIRE EXTINGUISHER, BRACKET
MOUNTED
SYMBOLS ROOM NAME
ACCESSIBLE PATH
ACCESSIBLE PATH
DOOR / EXIT APPROACH
W
ID
TH
O
F
DO
OR
W
ID
TH
O
F
DO
OR
" M
IN
5' - 0" 4' - 0"
3'
0"
A
B C
D
E
H
I
F
KEY PLAN
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
1/8" = 1'-0"
8/
/2
:5 2:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
ACCESSIBILITY PLAN
(OPTION)
08/02/2021
Author
Checker
Designer
F
F
F
SD
SD
SD
6'
ASSEMBLY
(A3) OCCUPANCY
NET @ 30 SF
2,894 SF
(97) OCCUPANTS
STORAGE
(S1) OCCUPANCY
GROSS @ 300 SF
49 SF
(1) OCCUPANTS
CONTACT STATION
(B) OCCUPANCY
GROSS @ 150 SF
581 SF
(4) OCCUPANTS COURT
(A3) OCCUPANCY
NET @ 30 SF
1,426 SF
(48) OCCUPANTS
185 TOTAL OCCUPANTS THIS LEVEL
OPEN AIR STRUCTURE (EXHIBITION & INTERPRETIVE)
EX
IT
A C
C
ES
S
TR
AV
EL
D
IS
TA
N
C E
2'
ACCESSIBLE PARK
ACCESSIBLE PARK
ACCESSIBLE WALK
EX
IT
A C
C
ES
S
TR
AV
EL
D
IS
TA
N
C E
1'
4"
74|23075|230
70' - 0" MIN REQUIRED
70' - 2" SEPARATION DISTANCE
4|340
GREATEST DIAGONAL 134' - 5"
ASSEMBLY
(A3) OCCUPANCY
NET @ 15 SF
488 SF
(33) OCCUPANTS
BREAK ROOM
(B) OCCUPANCY
GROSS @ 150 SF
269 SF
(2) OCCUPANTS
FEC
FEC
AED
AED
LEGEND
ROOM NAME, SF, AND
OCCUPANT LOAD
PRIMARY EGRESS
FEC
FIRE EXTINGUISHER CABINET
FIRE SAFETY
OCCUPANCY
TYPES
ASSEMBLY (A-3)
BUSINESS (B)
STORAGE (S-1)
EXIT SIGN
FE
FIRE EXTINGUISHER, BRACKET
MOUNTED
SYMBOLS
ROOM NAME
XX SF
# OCC
XX | XXX
EXIT
LOAD | CAPACITY
2-HOUR RATED PARTITIONRATED WALLS
LIFE SAFETY AED AUTOMATED EXTERNAL DIFIBRILLATOR
& FIRST AID KIT
1. REFER TO SHEETS G 03 AND G 04 FOR ADDITIONAL NOTES, SYMBOLS AND
SCHEDULES.
2. PUBLIC ENTRY GATES SIGNAGE TO READ "THIS GATE TO REMAIN OPEN AND
UNLOCKED WHEN THIS SPACE IS OCCUPIED". PROVIDE GATE WITH THE ABILITY TO
LOCK IN OPEN & CLOSED POSITIONS.
3. GATES DESIGNATED AS EXITS REQUIRE PANIC DEVICE HARDWARE
4 PROVIDE AUTOMATED EXTERNAL DEFIBRILLATOR (AED) & WALL MOUNTED CABINET
IN BUILDING A (VISITOR CONTACT STATION) & BUILDING D/E (CLASSROOM) AS PART
OF BASED BID. PROVIDE AED IN BUILDING F (OFFICE) AS PART OF OPTION "I". BASIS
OF DESIGN FOR AED TO BE "HEARTSTART FRX" BY PHILIPS, MODEL #861304. BASIS OF
DESIGN WALL CABINET TO BE ALLIED MEDICAL PRODUCTS MODEL #AMP-14SQ-SR.
COORDINATE LOCATION WITH CONTRACTING OFFICER.
5 PROVIDE FIRST AID KIT IN BUILDING A (VISITOR CONTACT STATION), LAW
ENFORCEMENT OFFICE (ROOM #004) & BUILDING D/E (CLASSROOM) AS PART OF
BASED BID. PROVIDE FIRST AID KIT IN BUILDING F (OFFICE) AS PART OF OPTION "I".
BASIS OF DESIGN TO BE "LARGE, 50 PERSON KIT", MODEL # 91140 BY ACME. FIRST AID
KIT MUST MEET REQUIREMENTS OF ANSI Z308.1-2015 AND OSHA 1910.51b.
COORDINATE LOCAITON WITH CONTRACTING OFFICER.
KEY PLAN
A
B C
D
E
H
I
F
G
CISTERNS
NON-OCCUPIED SPACE
STORAGE
(S1) OCCUPANCY
GROSS @ 300 SF
424 SF
(2) OCCUPANTSMECHANICAL
(S1) OCCUPANCY
GROSS @ 300 SF
111 SF
(1) OCCUPANTS
6 OCCUPANTS THIS LEVEL
FE
FE
2 | 170
1 | 170
MECHANICAL
(S1) OCCUPANCY
GROSS @ 300 SF
169 SF
(1) OCCUPANTS
FE
FE
LAW ENFORCEMENT
(B) OCCUPANCY
GROSS @ 150
175 SF
(2) OCCUPANTS
2 | 170
1|170
2 40 16
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
As indicated
8/
/2
:5 2:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
LIFE SAFETY PLANS (BASE
BID)
08/02/2021
PUTNAM
SCHIMPF
BOWMAN
SCALE: 3/32" = 1'-0"G0. 10
LIFE SAFETY PLAN - MAIN LEVEL1
SCALE: 3/32" = 1'-0"G0. 10
LIFE SAFETY PLAN - LOWER LEVEL2
F
F
SD
SD
SD
6'6'
ASSEMBLY
(A3) OCCUPANCY
NET @ 30 SF
2,894 SF
(97) OCCUPANTS
STORAGE
(S1) OCCUPANCY
GROSS @ 300 SF
49 SF
(1) OCCUPANTS
COURT
(A3) OCCUPANCY
NET @ 30 SF
1,426 SF
(48) OCCUPANTS
190 TOTAL OCCUPANTS THIS LEVEL
FEC
OPEN AIR STRUCTURE (EXHIBITION & INTERPRETIVE)
EX
IT
A C
C
ES
S
TR
AV
EL
D
IS
TA
N
C E
2'
ACCESSIBLE PARK
ACCESSIBLE PARK
ACCESSIBLE WALK
EX
IT
A C
C
ES
S
TR
AV
EL
D
IS
TA
N
C E
1'
4"
76|23077|230
70' - 0" MIN REQUIRED
70' - 7" SEPARATION DISTANCE
36|170
4|340
GREATEST DIAGONAL 134' - 5"
STORAGE
(S1) OCCUPANCY
GROSS @ 300SF
184 SF
(1) OCCUPANTS
ADMINISTRATION
(B) OCCUPANCY
GROSS @ 150 SF
528 SF
(4) OCCUPANTS
CONTACT STATION
(B) OCCUPANCY
GROSS @ 150 SF
581 SF
(4) OCCUPANTS ASSEMBLY
(A3) OCCUPANCY
NET @ 15 SF
488 SF
(33) OCCUPANTS
BREAK ROOM
(B) OCCUPANCY
GROSS @ 150 SF
269 SF
(2) OCCUPANTS
FEC
FEC
4|170
AED
/8
/8
EX
IT
A C
C
ES
S
TR
AV
EL
D
IS
TA
N
C E
4'
0"
CISTERNS
NON-OCCUPIED SPACE
STORAGE
(S1) OCCUPANCY
GROSS @ 300 SF
424 SF
(2) OCCUPANTSMECHANICAL
(S1) OCCUPANCY
GROSS @ 300 SF
111 SF
(1) OCCUPANTS
6 OCCUPANTS THIS LEVEL
FE
FE
2 | 170
1 | 170
MECHANICAL
(S1) OCCUPANCY
GROSS @ 300 SF
169 SF
(1) OCCUPANTS
FE
FE
LAW ENFORCEMENT
(B) OCCUPANCY
GROSS @ 150
175 SF
(2) OCCUPANTS
2 | 170
LEGEND
ROOM NAME, SF, AND
OCCUPANT LOAD
PRIMARY EGRESS
FEC
FIRE EXTINGUISHER CABINET
FIRE SAFETY
OCCUPANCY
TYPES
ASSEMBLY (A-3)
BUSINESS (B)
STORAGE (S-1)
EXIT SIGN
FE
FIRE EXTINGUISHER, BRACKET
MOUNTED
SYMBOLS
ROOM NAME
XX SF
# OCC
XX | XXX
EXIT
LOAD | CAPACITY
2-HOUR RATED PARTITIONRATED WALLS
LIFE SAFETY AED AUTOMATED EXTERNAL DIFIBRILLATOR
& FIRST AID KIT
1. REFER TO SHEETS G 03 AND G 04 FOR ADDITIONAL NOTES, SYMBOLS AND
SCHEDULES.
2. PUBLIC ENTRY GATES SIGNAGE TO READ "THIS GATE TO REMAIN OPEN AND
UNLOCKED WHEN THIS SPACE IS OCCUPIED". PROVIDE GATE WITH THE ABILITY TO
LOCK IN OPEN & CLOSED POSITIONS.
3. GATES DESIGNATED AS EXITS REQUIRE PANIC DEVICE HARDWARE
4 PROVIDE AUTOMATED EXTERNAL DEFIBRILLATOR (AED) & WALL MOUNTED CABINET
IN BUILDING A (VISITOR CONTACT STATION) & BUILDING D/E (CLASSROOM) AS PART
OF BASED BID. PROVIDE AED IN BUILDING F (OFFICE) AS PART OF OPTION "I". BASIS
OF DESIGN FOR AED TO BE "HEARTSTART FRX" BY PHILIPS, MODEL #861304. BASIS OF
DESIGN WALL CABINET TO BE ALLIED MEDICAL PRODUCTS MODEL #AMP-14SQ-SR.
COORDINATE LOCATION WITH CONTRACTING OFFICER.
5 PROVIDE FIRST AID KIT IN BUILDING A (VISITOR CONTACT STATION), LAW
ENFORCEMENT OFFICE (ROOM #004) & BUILDING D/E (CLASSROOM) AS PART OF
BASED BID. PROVIDE FIRST AID KIT IN BUILDING F (OFFICE) AS PART OF OPTION "I".
BASIS OF DESIGN TO BE "LARGE, 50 PERSON KIT", MODEL # 91140 BY ACME. FIRST AID
KIT MUST MEET REQUIREMENTS OF ANSI Z308.1-2015 AND OSHA 1910.51b.
COORDINATE LOCAITON WITH CONTRACTING OFFICER.
KEY PLAN
A
B C
D
E
H
I
F
G
SCALE:
SALT RIVER BAY NATIONAL HISTORICAL PARK
REHABILITATE SALT RIVER VISITOR CONTACT STATION
TITLE OF SHEETSUB SHEET NO.DESIGNED:
DATE:
TECH. REVIEW:
PMIS/PKG NO.
DRAWING NO.
SHEET
OF
CADD:
SHEET NOTES
251127
170432
As indicated
8/
/2
:5 2:
C
:\U se rs \A ar on
\D oc um en ts \2
0_ N
PS
S
AR
I-V
C S_
0C
D _C
EN
TR
AL
_D
PN
R
_C
ZM
_a ar on Q
N B5
L.
rv t
G0.
LIFE SAFETY PLANS
(OPTION)
08/02/2021
PUTNAM
Checker
Designer
SCALE: 3/32" = 1'-0"G0. 11
LIFE SAFETY PLAN - MAIN LEVEL (Option)1
SCALE: 3/32" = 1'-0"G0. 11
LIFE SAFETY PLAN - LOWER LEVEL (OPTION)2
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_n ot es
.d w g
/0
8/
:2
AM B
y:
Pr or oc k, Jo hn
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_n ot es
.d w g
/0
8/
:2
AM B
y:
Pr or oc k, "Camp Site"
40 30
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_e x_ co nd .d w g
/0 8/
:3
AM B
y:
Pr or oc k, Jo hn
SCALE IN FEET
02040 40
40 30 o o o o
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LDLD
LD
LD
LD
LD
LD
LD
LDLDLDLD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD LD LD LD LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LDLD
LD
LD
LD
LD
LD
o o o o o o o o o o o o o o o o
LD
o
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_d em o.
dw g
/0 8/
:3
AM B
y:
Pr or oc k, Jo hn
01530 30
40 30 o o o o
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LDLD
LD
LD
LD
LD
LD
LD
LDLDLDLD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD LD LD LD LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LDLD
LD
LD
LD
LD
LD
o o o o o o o o o o o o o o o o
LD
o
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_d em o.
dw g
/0 8/
:3
AM B
y:
Pr or oc k, Jo hn
40 30 o o o o
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LDLD
LD
LD
LD
LD
LD
LD
LDLDLDLD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD LD LD LD LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LDLD
LD
LD
LD
LD
LD
o o o o o o o o o o o o o o o o
LD
o
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_d em o.
dw g
/0 8/
:3
AM B
y:
Pr or oc k, Jo hn
40 30 o o o oX X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
TS DCM PS
o o o o o o o o o o o o o o o o o o
SF
LD
TS
DC
M
PS
X
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_e ro sio n.
dw g
/0
8/
0:
A
M B y:
Pr or oc k, Jo hn
40 30 o o o o
32 33
36 37
38 39
X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
TS DCM PS
o o o o o o o o o o o o o o o o o o
SF
LD
TS
DC
M
PS
X
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_e ro sio n.
dw g
/0
8/
0:
A
M B y:
Pr or oc k, Jo hn
40 30 o o o oX X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
TS DCM PS
o o o o o o o o o o o o o o o o o o
SF
LD
TS
DC
M
PS
X
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_e ro sio n.
dw g
/0
8/
0:
A
M B y:
Pr or oc k, Jo hn
40 30 o o o o
32 33
36 37
38 39
X X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
TS DCM PS
o o o o o o o o o o o o o o o o o o
SF
LD
TS
DC
M
PS
X
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_e ro sio n.
dw g
/0
8/
0:
A
M B y:
Pr or oc k, Jo hn
OVERLAP
VARIES
VARIES
3'
WATTLE SLOPE PROTECTION
WATTLE JOINT DETAIL
STAKE DETAIL
2" M
AX
WATTLE OVERLAP DETAIL
V:
\1
4\ ac tiv e\
9\ la nd
_d ev el op m en t\ dr aw in gs \s he et s\
_e ro sio n.
dw g
/0
8/
0:
A
M B y:
Pr or oc k, Jo hn
NOT TO SCALE
WATTLE EROSION CONTROL DETAIL
SLOPE
INSTALLATION
EARTH ANCHOR
(EA) DETAIL
Drawing Not To Scale
Disclaimer:
The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance.
3B
3A
*NOTE:
In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the HP-TRMs.
3"(7.5cm)
12"(30cm)
6" (15cm)
6" (15cm)
4"-6" (10 - 15cm)
Earth Anchor
Earth Anchor
Staples/Stakes
Sheet 1 of 2.
Drawn on: 03-07-11 5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-722-2040
www.nagreen.com
1. Prepare soil before installing high-performance turf reinforcement mats (HP-TRMs), including any necessary application of lime, fertilizer, and seed.
2. Begin at the top of the slope by anchoring the HP-TRMs in a 6” (15
cm) deep x 6” (15cm) wide trench with approximately 12” (30 cm) of
HP-TRMs extended beyond the up-slope portion of the trench.
Anchor the HP-TRMs with a row of staples and anchors approximately 12” (30 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to compacted soil and fold remaining 12” (30 cm) portion of
HP-TRMs back over seed and compacted soil. Secure HP-TRMs over compacted soil with a row of staples/stakes spaced approximately 12" (30 cm) apart across the width of the HP-TRMs.
3. Roll the HP-TRMs (A) down or (B) horizontally across the slope.
HP-TRMs will unroll with appropriate side against the soil surface. All HP-TRMs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide.
4. The edges of parallel HP-TRMs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the HP-TRM type.
5. Consecutive HP-TRMs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap.
Staple through overlapped area, approximately 12"(30cm) apart across entire HP-TRM width.
Drawing Not To Scale
Disclaimer:
The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance.
A B
C
A B C
CRITICAL POINTS
A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope
Vertices
Load Bearing Plate
Tendon
Anchor Head (Load-Locked
Position)
Em be dm en t
(A s D es ign ed
NOTES:
* The performance of ground anchoring devices is highly dependent on numerous site/project specific variables. It is the sole responsibility of the project engineer and/or contractor to select the appropriate anchor type and length. Anchoring shall be selected to hold the mat in intimate contact with the soil subgrade and resist pullout in accordance with the project's design intent.
* Anchor Pattern Guide can vary based on earth anchor and blanket selection.
* If desired, the system can be soil-filled and sodded after TRM installation. Sod should be staples/staked according to plan specifications.
Earth Anchor Detail
Sheet 2 of 2.
2"-5" (5-12.5cm)
3.3' (1m)
6' (1.8m)
3' (0.9m)
4' (1.2m)
1.6' (0.5m)
2' (0.6m)
0.7 Anchors per SQ.YD.
(0.8 Anchors per SQ. M.)
A B
C D
2"-5" (5-12.5cm)
2"-5" (5-12.5cm)
2"-5" (5-12.5cm)
2"-5" (5-12.5cm)
6' (1.8m)
3.3' (1m)
3.3' (1m)
3' (0.9m)
3.3' (1m)
3.3' (1m)1.6'
(0.5m)
3' (0.9m)
1.5'(0.45m)
2"-5" (5-12.5cm)
2"-5" (5-12.5cm)
2"-5" (5-12.5cm)
1.15 Anchors per SQ.YD.
(1.35 Anchors per SQ. M.)
1.7 Anchors per SQ.YD.
(2.0 Anchors per SQ. M.)
2.3 Anchors per SQ.YD.
(2.7 Anchors per SQ. M.)
St ee p Sl op es
Sh al lo w
S lo pe s
Channel & Shoreline Slopes
2:1
3:1
1.6' (0.5m)
0.7 Anchors/SQ.YD.(0.8 Anchors/SQ. M.)
1.15 Anchors/SQ.YD.(1.35 Anchors/SQ. M.)
1.7 Anchors/SQ.YD.(2.0 Anchors/SQ. M.)
2.3 Anc
ho rs/
SQ.YD.(2
.7
Anc ho rs/
SQ. M
.) 1:1
Drawn on: 03-07-11 5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-722-2040
www.nagreen.com
SLOPE
INSTALLATION
EARTH ANCHOR
(EA) DETAIL
*NOTE:
In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the HP-TRMs.
1. Prepare soil before installing high-performance turf reinforcement mats (HP-TRMs), including any necessary application of lime, fertilizer, and seed.
2. Begin at the top of the slope by anchoring the HP-TRMs in a 6” (15
cm) deep x 6” (15cm) wide trench with approximately 12” (30 cm) of
HP-TRMs extended beyond the up-slope portion of the trench.
Anchor the HP-TRMs with a row of staples and anchors approximately 12” (30 cm) apart in the bottom of the trench.