This is a Bridge Inspection and Appraisal Report for the Tram-Lighthouse Road bridge (Structure No. 41640-00116) located at St. Marks National Wildlife Refuge in Wakulla County, Florida, managed by the U.S. Fish & Wildlife Service. The routine inspection was conducted on May 29, 2023, by Short Elliott Hendrickson, Inc., with the full report dated July 18, 2023. The bridge has an overall condition rating of GOOD (7 out of 9) and was originally constructed in 1942 and reconstructed in 2000. The structure consists of three continuous reinforced concrete tee beam spans totaling 34 feet in length with an 11-foot maximum span, 14-foot roadway width, and 15-foot deck width. The bridge carries one-lane, two-way traffic with an average daily traffic count of one vehicle and is posted with a 15-ton weight limit.
The inspection identified four recommended maintenance and repair items totaling $3,888 in estimated costs. Priority items include installing object markers (OM-3L and OM-3R) at bridge corners ($808 current year cost), placing riprap at upstream and downstream ends of the concrete slab ($2,604 current year cost), tightening bolts at curbs and bridge rail connections ($431 current year cost), and trimming vegetation obstructing the west approach load posting sign ($45 current year cost, marked as urgent). Load ratings indicate an Operating Rating of 55 tons for the HS20 truck type and an Inventory Rating of 35 tons. The bridge's structural elements show minor deterioration including insignificant deck cracking, loose timber curbs and railings, minor concrete spalling on abutments and piers, and minor scour at the downstream end of the concrete slab. The estimated remaining service life is greater than 10 years at current load limits without major repairs or rehabilitation. The next inspection is recommended in two years as a routine inspection with a check report.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION AND APPRAISAL REPORT
TRAM-LIGHTHOUSE ROAD
Bridge Number: 41640-00116
St. Marks National Wildlife Refuge
Region 4
U.S. Fish & Wildlife Service
Type of Inspection: Routine
Date of Inspection: 5/29/2023
Prepared By: Short Elliott Hendrickson, Inc
Prepared For: National Wildlife Refuge System Infrastructure Management Division Falls Church, VA
Date of Report: 7/18/2023
Type of Report: Full
PrintDate: 8/18/2023
41640 00116 7/18/2023 Rpt V4.2.1
Bridge Identification, Use, & Summary of Findings
225 Date of Report 7/18/2023
090 Inspection Date 5/29/2023
Inspector Organization Short Elliott Hendrickson, Inc
Lead Inspector David Barber, P.E.
The summary condition of the bridge is GOOD.
There are no object markers at the corners of the bridge. There is a 10" 12" drop at the downstream end of the concrete slab under the bridge and up to 6" drop at the upstream end of the concrete slab under the bridge. The timber curbs and bridge rail are loose at all bolted connections.
226 Type Use The bridge provides FWS access in the east portion of the refuge. The one lane bridge carries two way traffic. There is a locked gate just east of the bridge.
213 Public Use N 030 Year of ADT 23
029 Average Daily Traffic 000001212 In Use Y
209 Type Construction/Materials Reinforced concrete deck and girders poured monolithically, on concrete piers and abutments.
108 Wearing Surface Monolithic Concrete
107 Deck Str Type Concrete Cast in Place
106 Year Rebuilt 2000
052 Deck Width 015.0
051 Bridge Roadway Width 014.0
049 Structure Length 000034
048 Max Span Length 0011
045 Number of Main Spans 003
043 Structure Type Concrete Continuous Tee Beam
027 Year Built 1942
265 Asset Number 10015314
204 Bridge Number 41640 00116
203 Bridge Name TRAM LIGHTHOUSE ROAD
009 Location TRAM ROAD/LIGHTHOUSE ROAD
007 Facility Carried TRAM ROAD
006 Feature Intersected CANAL TO STONEY BAYOU
003 County 129 (Wakulla County)
001 State 124 (Florida)
201 Region 4202 Station St. Marks National Wildlife Refuge
Summary of Findings
Bridge Use
Bridge Features
Bridge Identification & Location ft, xxx.x ft, xxx.x xxx ft, xxxxxx ft, xxxx xxxxxx yy
PrintDate: 8/18/2023
Recommended Work & Estimated Costs Estimated Remaining Life (Item 219, Years): >10 (At current load limits without major repairs or rehabilitation)
ReplacementMaint/Repair/ Rehab
Priority Assessment
Recommendation (See Footnote 1)Item
Urgent Item j.
i.
h.
g.
f.
e.
d.
c.
b.
a.
Future Year Cost:
$890
Current Year Cost:
$808
Proj Total for Year of Est:
$370
Subtotal: $370
G.A.S.
Construction Management:
Preliminary Design
Planning/ Design/ Const. Mgmt:
Construction Contingency:
Construction Estimate:
$370
$8084Install signs in accordance with 'Sign Recommendations' in the next section of this report. 2 OM-3L and 2 OM-3R object markers. Material: $250, Labor: 4 Hours at $30/hour = $120, Adjustment for Location: None
PrintDate: 8/18/2023
ReplacementMaint/Repair/ Rehab
Priority Assessment
Recommendation (See Footnote 1)Item
Urgent Item j.
i.
h.
g.
f.
e.
d.
c.
b.
a.
Future Year Cost:
$2,871
Current Year Cost:
$2,604
Proj Total for Year of Est:
$1,450
Subtotal: $1,450
G.A.S.
Construction Management:
Preliminary Design
Planning/ Design/ Const. Mgmt:
Construction Contingency:
Construction Estimate:
$1,450
$2,6045Place riprap at upstream and downstream ends of concrete slab under bridge. Material and Labor: 10 cubic yards at $145 = $1,450, Adjustment for Location: None.
Urgent Item j.
i.
h.
g.
f.
e.
d.
c.
b.
a.
Future Year Cost:
$475
Current Year Cost:
$431
Proj Total for Year of Est:
$240
Subtotal: $240
G.A.S.
Construction Management:
Preliminary Design
Planning/ Design/ Const. Mgmt:
Construction Contingency:
Construction Estimate:
$240
$4315Tighten bolts at curbs and bridge rail connections. Install shims in post pockets to tighten rail post support. Labor: 8 hours at $30/hour = $240, Adjustment for Location: None
PrintDate: 8/18/2023
ReplacementMaint/Repair/ Rehab
Priority Assessment
Recommendation (See Footnote 1)Item
Urgent Item j.
i.
h.
g.
f.
e.
d.
c.
b.
a.
Future Year Cost:
$50
Current Year Cost:
$45
Proj Total for Year of Est:
$45
Subtotal: $45
G.A.S.
Construction Management:
Preliminary Design
Planning/ Design/ Const. Mgmt:
Construction Contingency:
Construction Estimate:
$45
$451Trim vegetation obstructing view of west approach load posting sign. Material: $0, Labor: 1 hour at $45/hour = $45, Adjustment for Location: None
Footnotes:
1/Recommended work are items noted by the inspection team on the date of inspection. Urgent items are those which pose a current threat to the strength or stability of the bridge, or involve a significant safety concern. Items are listed in their order of importance. Item 1 considered most important. Adjustments for location include geographical region and remoteness of the bridge adjustment. For multi-use structures such as water control structures or dam spillways, repair or reconstruction estimates, if applicable, are for the bridge component only.
2/Item c., when needed, is used for items up to $100,000 in construction value, except replacements, and includes a mark-up of approximately 18% assuming MMS program accomplishment. If the item is accomplished by other than MMS, the mark-up should be adjusted accordingly.
3/Items d. and e., when needed, are used for replacements, and work items over $100,000 in construction value, and use a sliding scale based on the construction estimate. If the item is accomplished by MMS, the mark-up should be adjusted accordingly.
4/Priority assessment value is a reflection of the criticality of a recommendation, with a value of 1, 2, or 3 representing a high priority safety hazard that requires immediate attention, and a 7 representing a non-urgent repair with little-or-no safety ramifications.
$3,888Totals
PrintDate: 8/18/2023
159.3
49.3
49.355.9
T3 3
T3S2
T3
HS20 35.1
303 Sign Recommendation Remarks
302 Sign Status Weight Limit 15 Tons signs at both approaches. Object markers are not in place.
301 Sign Recommendations No load posting required. Object markers are recommended at all corners of the bridge.
Tee GirderDeckElement
The load rating from 2001 is still considered valid. No significant changes in the condition of the bridge which would affect the rating were observed during the 2023 inspection. The load capacity and weight limit posting recommendations remain as shown above.
306 Rating Verified By David Barber, 5/29/2023305 Rating Prepared By Jason Triplett, 4/30/2001
304 Load Rating Remarks DECK: 6" thick flanges of tees with no asphalt or fill. Stresses Used: Concrete Compressive Stress = 3,000 psi, Reinforcing Steel Yield Stress = 60,000 psi. TEE GIRDER: 6" thick concrete slab on 5 integral concrete stems continuous over 3 spans.
Spans = 11' 0", 11' 0", 11' 0". Stems are 1' 2" wide, 15 3/4" deep. 3' 0" spacing at interior and 2' 7" spacing at exterior.
Stresses Used: Concrete Compressive Stress = 3,000 psi, Reinforcing Steel Yield Stress = 40,000 psi.
Project leaders (and others) should be aware that the posting recommendations are for the absolute maximum load levels to which a structure may safely be subjected for limited passages of the loads. Should the need arise to subject the bridge to sustained loading at or near this level, the Project Leader should contact the Regional Engineer for guidance regarding an appropriate safe load capacity.
Load posting recommendations are based on Operating rating values. See note regarding posting recommendations, below.
Op = Operating RatingIn = Inventory Rating
Important Note Regarding Posting Recommendations
Load Ratings (Tons)
Sign Recommendations
Sign Recommendations & Load Ratings
In In In In InOp Op Op Op Op
310 Element 1 320 Element 2 330 Element 3 340 Element 4 350 Element 5
PrintDate: 8/18/2023
Additional Information & Comments
211 Description of Bridge The bridge was constructed in approximately 1942 and reconstructed in 2000, and consists of three spans of reinforced concrete girders constructed monolithically with a reinforced concrete deck. The spans are supported on concrete wall piers and abutments. There is a concrete slab under the bridge. The bridge also serves as a water control structure.
255 Comparison to Previous Inspection There are no significant changes in the condition of the bridge since the previous inspection.
256 Next Inspection Recommendations The next inspection for this bridge is recommended as a routine inspection with a check report in two years.
257 Additional Comments
PrintDate: 8/18/2023
Condition Ratings (Items 218, 58, 59, 60) Code Condition Description
N Not applicable
9 Excellent
8 Very Good No problems noted.
7 Good Some minor problems noted.
6 Satisfactory Structural elements show some minor deterioration.
5 Fair All primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 Poor Advanced section loss, deterioration, spalling, or scour.
3 Serious Loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
2 Critical Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support.
Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
1 Imminent Failure Major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Bridge is closed to traffic but corrective action may put back in light service.
0 Failed Out of service; beyond corrective action.
PrintDate: 8/18/2023
218 Approaches Item Condition
Rating Remarks
218 Approaches 7
218.01 Approach Slab 7
218.02 Relief Joints N
218.03 Approach Guardrail N
218.04 Surfacing 7
218.05 Embankment 7
218.06 Signs 7
218.07 Vegetation 7
Sloped approach slabs at both ends, covered with asphalt at west, ramped with gravel at east.
Gravel, grass between wheel lines beyond east end, concrete slab covered with asphalt paving at west. Transverse crack in asphalt 2' from west end of bridge (at end of approach slab).
Retained by flared wingwalls.
'One Lane Bridge' sign at east approach on left shoulder. Posted 'Weight Limit 15 Tons' at both approaches. West sign is on left side of road and obscured by overhanging vegetation.
Grassy slopes recently trimmed.
PrintDate: 8/18/2023
058 Deck
Rating Remarks
058 Deck 7
058.01 Deck Structure 7
058.02 Expansion Joints N
058.03 Wearing Surface 7
058.04 Rideability 8
058.05 Curbs 6
058.06 Parapets/Railings 6
058.07 Drains/Drainage 7
058.08 Cleanliness 7
058.09 Utilities N
058.10 Lighting N
Reinforced concrete monolithic with girders Plywood deck forms remain in place between girders. Insignificant transverse crack with light efflorescence.
Concrete Insignificant longitudinal crack along the bridge centerline and a few other short longitudinal insignificant cracks.
Treated timber curbs bolted to deck Minor to moderate checks. Not firmly attached to the bridge. Minor rot in northwest curb, attachment bolts are no longer holding in.
Treated timber rail and posts bolted to treated timber curbs Leaning slightly at southwest. Attachments of posts to curbs are loose. Minor damage to lower rail at northwest corner.
Through spaces in curbs water ponded on deck (in 2021).
PrintDate: 8/18/2023
059 Superstructure
Rating Remarks
059 Superstructure 7
059.01 Bearing Devices N
059.02 Girders 7
059.02A Diaphragms N
059.02B Bracing N
059.03 Floor Beams N
059.04 Stringers N
059.05 Trusses N
059.05A Portals N
059.05B Bracing N
Reinforced concrete tee beams poured monolithically with deck. North exterior tee beam does not bear fully on pier walls (walls not widened when bridge was widened).
PrintDate: 8/18/2023
059 Superstructure (cont)
Rating Remarks
059.06 Paint N
059.07 Splices and Connections N
059.08 Rivets & Bolts N
059.09 Welds N
059.10 Corrosion N
059.11 Timber Decay N
059.12 Deflection 8
059.13 Vibration Under Load 8
059.14 Collision Damage N
No deflection observed in 2023.
No vibration observed in 2023.
PrintDate: 8/18/2023
RemarksCondition Rating
Item
060 Substructure
060 Substructure 7
060.01 Wings 6
060.02 Backwalls/Bulkheads 7
060.03 Bearing Seats 7
060.04 Breastwalls/Columns 7
060.05 Weep Holes N
060.06 Footings/Sills N
060.07 Piles/Bracing N
060.08 Erosion/Scour 7
060.09 Settlement N
Concrete, flared Minor to moderate surface Minor spalling.
Concrete Minor surface spalling and abrasion.
Concrete beams bear on tops of concrete abutments.
Concrete Minor surface spalling and abrasion.
Concrete slab under bridge.
ABUTMENTS
PrintDate: 8/18/2023
RemarksCondition Rating
Item
060 Substructure (cont)
060.10 Bearing Seats 7
060.11 Caps N
060.12 Columns/Walls 7
060.13 Piles/Bracing N
060.14 Footings/Sills N
Concrete beams bear on tops of concrete pier walls.
Concrete Minor surface spalling and abrasion. Deterioration of matrix has exposed larger aggregate.
060.15 Erosion/Scour 7
060.16 Settlement N
Concrete slab under bridge.
PIERS
PrintDate: 8/18/2023
Condition Ratings (Item 61 Channel) Code Description
N Not applicable. Bridge is not over a waterway.
9 There are no noticable or noteworth deficiencies which affect the condition of the channel.
8 Banks are protected or well vegetated. River control devides such as spur dikes and embankment protection are not required or are in a stable condition.
7 Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift.
6 Bank is beginning to slump. River control devices and embankment protection have widespread minor damage.
There is minor stream bed movement evident. Debris is restricting the channel slightly.
5 Bank protection is being eroded. River control devices and/or embankment have major damage. Large deposits of debris are in the channnel.
4 Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel.
3 Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway.
2 The channel has changed to the extent the bridge is near a state of collapse.
1 Bridge closed because of channel failure. Corrective action may put back in light service.
0 Bridge closed because of channel failure. Replacement necessary.
PrintDate: 8/18/2023
061 Channel and Channel Protection
Rating Remarks
061 Channel & Channel Protection
061.01 Scour/Erosion 7
061.02 Channel Protection 6
061.03 Spur Dikes/Jetties N
061.04 Waterway
Obstructions
061.05 Adequacy of Opening 7
061.06 Normal Velocity 6
060.17 Average Opening 7
060.18 Stream Bed Material 7
061.05 Adequacy of Opening Sufficient
061.06 Normal Velocity Medium
Downstream end of concrete slab exposed up to 12".
Cobble size riprap across channel at downstream (south) side of concrete slab.
Stoplogs on upstream side (north). Widening of superstructure prevents access to stoplogs from above.
Velocity is sufficient to cause minor scour. Flow and reverse.
Prior noted scour at downstream end was not visible with riprap.
Sand, silt and rocks.
PrintDate: 8/18/2023
Condition Ratings (Item 62 Culverts) Code Description
N Not applicable. Structure is not a culvert.
9 No deficiencies.
8 No noticable or noteworty deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift.
7 Shrinkage cracks, light scaling, and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occurred near curtain walls, wingwalls, or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting.
6 Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete walls, wingwalls, or pipes. Metal curverts have a smooth curvature, non symmetrical shape, significant corrosion or moderate pitting.
5 Moderate to major deterioration or disintegration, extensive cracking and leaching, or spalls on concrete or masonry walls and erosion at curtain walls, wingwalls, or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting.
4 Large spalls, heavy scaling, wide cracks, considerable efflorescence, or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting.
3 Any condition described in Code 4 but which is excessive in scope. Severe movement or differential settlement of the segments, or loss of fill. Holes may exist in walls or slabs. Integral wingwalls nearly severed from culvert.
Severe scour or erosion at curtain walls, wingwalls or pipes. Metal culverts have extreme distortion and deflection in one section, extensive corrosion, or deep pitting with scattered perforations.
2 Integral wingwalls collapsed, severe settlement of roadway due to loss of fill. Section of culvert may have failed and can no longer support embankment. Complete undermining at curtain walls and pipes. Corrective action required to maintain traffic. Metal culverts have extreme distortion and deflection throughout with extensive perforations due to corrosion.
1 Bridge closed. Corrective action may put back in light service.
0 Bridge closed. Replacement necessary.
PrintDate: 8/18/2023
062 Culverts
Rating Remarks
062 Culvert(s) N
062.01 Embankment
062.02 Surfacing
062.03 Shoulders
062.04 Headwalls
062.05 Wingwalls
062.06 Barrel
062.07 Footings
062.08 Design Opening
062.09 Opening Remaining
062.10 Debris/Silt
062.11 Erosion/Scour
062.12 Grade Percent
PrintDate: 8/18/2023
036 Traffic Safety Features Item Assessment Remarks
036A Bridge Rail 0 Treated timber rail and posts bolted to treated timber curbs.
036B Transitions 0
036C Approach Rail 0
036D End Treatment 0
No approach railing exists.
0 Does not meet current FWS new rail guidelines 1 Meets current FWS guidelines N Not applicable or a safety feature is not required
Traffic Safety Features Legend:
113 Scour Critical Bridges Item Assessment Remarks
113 Scour Critical Bridges 7 Scour Mitigated; POA Implemented. Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. Minor scour 6" to 1' 0 deep at end of concrete slab.
041 Bridge Posting Item Assessment Remarks
041 Bridge Posting P Posted for load (may include other restrictions such as temporary bridges which are load posted). Posting is not required, but bridge was posted Weight Limit 15 tons at both approaches the time of inspection.
PrintDate: 8/18/2023
Structure No. 41640-00116, TRAM-LIGHTHOUSE ROAD Inspec on Date: 5/29/2023
View down centerline of bridge roadway looking east
Eleva on looking upstream
Eleva on looking downstream
‘One Lane Bridge’ sign at east approach
Load pos ng sign at east approach
Load pos ng sign at west approach
Longitudinal and transverse cracks near centerline with branching into centerline of deck
Open joint and se lement at east end of deck
Checks in curbs south shown, similar throughout
Weathered north bridge rail, typical of south bridge rail
Loose curb bolts allowing rail to move, northwest corner shown
Spall in southeast wingwall near end
North exterior girder does not fully bear on west pier
Abrasion in pier near water line similar at all piers and abutments, east face of east pier shown
Typical view of underside of bridge
Upstream channel looking north
Looking east
Downstream channel looking south
Looking west
Inventory & Appraisal Data
209 Type Construction/Materials Reinforced concrete deck and girders poured monolithically, on concrete piers and abutments.
108 Deck Surface 1 Monolithic Concrete
107 Deck Type 1 Concrete Cast in Place
106 Year Rebuilt 2000
052 Deck Width 015.0
051 Br. C C Width 014.0
049 Str. Length 000034
048 Max Span Length 0011
045 No. Main Spans 003
043 Structure Type 204 Concrete Continuous Tee Beam
027 Year Built 1942
265 Asset Number 10015314
204 Bridge Number 41640 00116
203 Bridge Name TRAM LIGHTHOUSE ROAD
009 Location TRAM ROAD/LIGHTHOUSE ROAD
007 Facility Carried TRAM ROAD
006 Feat. Intersected CANAL TO STONEY BAYOU202 Station St. Marks National Wildlife Refuge
Bridge Features
Bridge Identification & Location 201 Region 4
205 FWS Class B
206 FWS Function 4
207 State 124 Florida
208 County 129 Wakulla County
011 Milepoint 000.050
016 Latitude 30° 08.46'
017 Longitude 084° 08.32'
022 Owner 63 U.S. Fish and Wildlife Service
021 Maint. Resp. 63 U.S. Fish and Wildlife Service
216 Inv. Length 000032
217 FWS Min. Length Y
112 NBIS Min. Length Y
050 Curb/Walk Lt/Rt 00.0/00.0
032 Approach Width 010
102 Traffic Direction 3 One lane bridge for 2 way traffic
210 Plans Available Y
028 Lanes On/Under 01/00
042 Service On/Under 1/5
044 App. Str. Type NA
046 No. App. Spans 000
047 Horiz. Clearance 14.0 xx.x ft xxxx ft xxxxxx ft xxxxxx ft xx.x ft xxx.x ft xxx.x ft xxx ft
PrintDate: 8/18/2023
226 Type Use The bridge provides FWS access in the east portion of the refuge. The one lane bridge carries two way traffic. There is a locked gate just east of the bridge.
213 Public Use N 030 Year of ADT 23
029 Average Daily 000001212 In Use Y
Condition Ratings & Appraisal Data
Bridge Use
058 Deck Condition Rating 7
059 Superstructure Condition Rating 7
060 Substructure Condition Rating 7
061 Channel Condition Rating 6
062 Culvert Condtion Rating N
113 Scour Critical Bridges 7
218 Approaches Condition Rating 7
227 Bridge Summary Condition 7.2
036 Railing 0000
067 Structural Evaluation 6
068 Deck Geometry 6
069 Underclearance Vertical and Horizontal N
071 Waterway Adequacy 7
072 Approach Alignment 7
219 Estimated Remaining Life >10
Load Rating & Posting 031 Design Load 0
041 Load Posting P
063 Operating Rating Method 2
064 Operating Rating 55
065 Inventory Rating Method 2
066 Inventory Rating 35
070 Bridge Posting 5 Allowable Stress (AS)
Allowable Stress (AS)
Tons
Tons
Recommended Work 231 Maint/Repair/Rehab Estimated Cost $3,888
232 Replacement Recommended N
233 Replacement Cost
234 Year of Estimated Costs 2023
Posted for load (may include other restrictions such as temporary bridges which are load posted)
Other or Unkown
PrintDate: 8/18/2023
092A Fracture Critical Inspection N090 Inspection Date 5/29/2023
Inspection Information
228 Last Inspection Type Routine
250 Last Report Type Full
091 Inspection Frequency 24
229 Next Inspection Year 2025
230 Next Inspection Type 2
251 Next Report Type Check
092B Requires Underwater Inspec N
092C Requires Special Inspection N
093A Fracture Critical Inspection
093B Underwater Inspection Date
093C Special Inspection Date
223 Lead Inspector David Barber, P.E.
224 Inspector Organization Short Elliott Hendrickson, Inc
225 Date of Report 7/18/2023
245 Approved By DMB
246 Approved Date 8/16/2023
Miscellaneous FWS & NBI Data
235 FWS Notes "1999: SCHED FOR REHAB W/98 NEW CNSTRCTN FUNDS. INSPECT. 2001: REPAIRS/REHAB COMPLTD IN
2000 J. POJE 1/01. CANDIDATE FOR CHECK INSP IN 2003
Notes
008 NBI Number 000041640 00021
034 Skew, ° 00
037 Historical Significance 5
075A Type of Work Proposed
075B Work Done By
076 Length of Structure Improvement
094 Bridge Improvement Cost, $1k
095 Roadway Improvement Cost, $1k
096 Total Project Cost, $1k
097 Cost Estimate Year
114 Future ADT 000002
115 Year of Future ADT 43
214 Inspected by Another Agency No
215 Inspection Agency
240 Year Added to Inventory
241 Est. RPI Replacement Cost, $1k 337
242 Year of RPI Estimate 2023
005 State Route Number 160000000
244 TeamMember Organization Short Elliott Hendrickson, Inc
243 TeamMember Trevor Jones
PrintDate: 8/18/2023
X:\FJ\F\FWSHQ\157028\0-PROJECT FILES\FORMS & REFERENCE DOCUMENTS\Urgent Item Form V1.3.doc
~U.S. FISH & WILDLIFE SERVICE~
URGENT BRIDGE WORK
RECOMMENDATION ITEMS
STATION: REGION:
BRIDGE NAME:
BRIDGE NUMBER:
URGENT ITEMS REQUIRING ACTION:
THE ABOVE ITEM(S) WERE FIRST NOTED DURING THE _____________
INSPECTION.
THE BRIDGE REQUIRES POSTING OF TONS, TONS, TONS
FOR AASHTO TRUCK TYPES 3, 3S2, & 3-3, OR TONS FOR A SINGLE
LOAD LIMIT SIGN, BUT WAS NOT POSTED AT THE TIME OF INSPECTION.
THE POSTING RECOMMENDATION IS UNCHANGED FROM THE PREVIOUS
INSPECTION REPORT.
URGENT ITEMS ARE THOSE THAT POSE A CURRENT THREAT TO THE
STRENGTH OR STABILITY OF THE BRIDGE, OR INVOLVE A SIGNIFICANT
SAFETY CONCERN.
INSPECTOR: DATE:
ORGANIZATION:
ACKNOWLEDGED BY: DATE:
TITLE:
Note: Questions regarding this information should be directed to the Bridge Safety Program Manager/Infrastructure Management Division/Ron_Begin@fws.gov/703-358-2354
Original: Station cc: Regional Engineer (Attention Regional Bridge Coordinator) Infrastructure Division (Bridge Safety Program Manager) Inspector
St. Marks NWR 4
TRAM-LIGHTHOUSE ROAD
41640-00116
5/29/2023X
X
David M. Barber, P.E. 6/21/2023
SEH,Inc.
The load posting sign at the west approach is obscured by vegetation. The vegetation needs to be trimmed away from the view of the west approach sign.