B08_Solicitation_Attachment_3_Drawings_Specifications_B_Existing_Photos_5_12_26_(6_pages).pdf

PDF 3 MB Posted

Attached to
St. Marks NWR Aucilla Tram Road Bridge DB
Solicitation number
140FC126Q0044
Issued by
Not on record

About this file

This file is Appendix B containing existing conditions photographs for the Aucill Tram Road Bridge located at St. Marks National Wildlife Refuge in Florida. The document includes six photographs dated between February 2024 and July 2025 that document the current state of the bridge infrastructure and surrounding environment.

The photographs depict the bridge deck, guardrails, water control structure beneath the bridge, and the bridge's relationship to Lighthouse Road and the surrounding forest landscape. Figure 1 shows the water control structure underneath the bridge from February 2024. Figure 2 presents a longitudinal view of the bridge deck facing east, also from February 2024. Figure 3 captures the Tram Road Bridge from the west side of Lighthouse Road in February 2024. Figure 4 shows Lighthouse Road looking north with the entrance to Tram Road Bridge visible in mid-right of the photo from February 2024. Figure 5 documents the water control structure, cantilever bridge deck, and guardrail from May 2025. Figure 6 provides a downward-looking view of the water control structure and cantilever bridge deck from July 2025, showing water conditions and vegetation around the structure. The photographs collectively establish baseline conditions for the bridge infrastructure prior to any planned rehabilitation or reconstruction work.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aucill Tram Rd. Bridge St. Marks NWR

Appendix B: Existing Conditions Photos

Figure 1: Existing Conditions showing water control structure underneath bridge, February 2024

12 May 2026

Figure 2: Existing conditions showing bridge deck facing east, February 2024

Figure 3: Tram Rd. Bridge from west side of Lighthouse Road, February 2024

Figure 4: Lighthouse Rd. looking north. Entrance to Tram Rd. bridge located mid photo at right February 2024

Figure 5: Water Control Structure, Cantilever Bridge Deck, Guardrail, May 2025

Figure 6: Water Control Structure and Cantilever Bridge Deck, Looking Down July 2025